Search NASASearch

SEARCH · Search NASA

Results for “Deployable Boom”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Stiffening of the ACES deployable space boom

The purpose of this design project was to design an active planar stiffening device for the existing ACES (Acoustic Containerless Experiment System) structure. the ACES structure was modeled using simple beam theory. Various concepts were generated about how the stiffening device should be configured in order to perform at an optimum level. The optimum configuration was selected to be a single set of spreaders located approximately 63% of the distance down the beam. Actuation was to be provided by a DC electric motor. From the test results, the design group was able to draw conclusions and make recommendations about the utility of further research into this area.

Sidwell, Vince

Low-cost tubular antenna deployer for WISP-2

A new tubular boom deployment mechanism has been designed, built, and flown as part of the second Waves In Space Program (WISP-2) through Cornell University. For this program, two booms were needed to form a dipole antenna but existing units were found to be too complicated and costly. A low-cost alternative was developed which combined flight-proven tubular boom technology with a new support and deployment mechanism. The simplicity of this new design was a major factor in providing a highly reliable and cost-effective system.

Warden, Robert M.

The dynamics and optimal control of spinning spacecraft and movable telescoping appendages, part B: Effect of gravity-gradient torques on the dynamics of a spinning spacecraft with telescoping appendages

The effects of gravity gradient torques during boom deployment maneuvers of a spinning spacecraft are examined. Configurations where the booms extended only along the hub principal axes and where one or two booms are offset from the principal axes were considered. For the special case of symmetric deployment (principal axes booms) the stability boundaries are determined, and a stability chart is used to study the system behavior. Possible cases of instability during this type of maneuver are identified. In the second configuration an expression for gravity torque about the hub center of mass was developed. The nonlinear equations of motion are solved numerically, and the substantial influence of the gravity torque during asymmetric deployment maneuvers is indicated.

Bainum, P. M.

Nonlinear Dynamic Analysis of Deploying Flexible Space Booms

A fundamental investigation of the planar deployment and lock-up of two flexible boom type appendages which have attached tip masses and are connected to a central rigid body through a rotational spring is presented. Nondimensional parameters are identified and it is shown that, in general, the solution depends only on two mass ratios and one nondimensional stiffness parameter. Results are presented for boom tip deflections, deployment time and root moments at lock-up. A threshold value of the nondimensional stiffness parameter is identified beyond which boom deflections become large. Also, a thorough examination of the effect of nonlinear terms in the equations governing the deployment phase is performed. Nonlinear terms in the deployment equations due to kinematics and structural deformation are required to predict more accurately boom deflections, but retention of an inconsistent set of nonlinear terms leads to erroneous results. In particular, retaining nonlinear kinematic terms while neglecting nonlinear structural terms can produce inaccurate results even below the threshold stiffness value.

Mcgowan, P. E.

Nonlinear dynamic analysis of deploying flexible space booms

The dynamics of the planar deployment and lock-up of two flexible boom-type appendages on a spacecraft are analyzed by establishing nonlinear equations of motion for the deployment phase and linear for the post-lock-up phase. Nondimensional parameters and threshold values are identified in terms of boom tip deflections, deployment time and root moments for appendages with tip masses attached to a central rigid body through a rotational spring; an account is taken of the nonlinear kinematic and structural terms. It was found that, in general, the solution is influenced only by two mass ratios and one nondimensional stiffness parameter.

Mcgowan, P. E.

Analysis of RAE-1 inversion

The RAE-1 spacecraft inversion performed October 31, 1972 is described based upon the in-orbit dynamical data in conjunction with results obtained from previously developed computer simulation models. The computer simulations used are predictive of the satellite dynamics, including boom flexing, and are applicable during boom deployment and retraction, inter-phase coast periods, and post-deployment operations. Attitude data, as well as boom tip data, were analyzed in order to obtain a detailed description of the dynamical behavior of the spacecraft during and after the inversion. Runs were made using the computer model and the results were analyzed and compared with the real time data. Close agreement between the actual recorded spacecraft attitude and the computer simulation results was obtained.

Hedland, D. A.

Special test equipment and fixturing for MSAT reflector assembly alignment

The MSAT Reflector Assembly is a state of the art subsystem for Mobile Satellite (MSAT), a geosynchronous-based commercial mobile telecommunication satellite program serving North America. The Reflector Assembly consisted of a deployable, three-hinge, folding-segment Boom, deployable 5.7 x 5.3-meter 16-rib Wrap-Rib Reflector, and a Reflector Pointing Mechanism (RPM). The MSAT spacecraft was based on a Hughes HS601 spacecraft bus carrying two Reflector Assemblies independently dedicated for L-band transmit and receive operations. Lockheed Missiles and Space Company (LMSC) designed and built the Reflector Assembly for MSAT under contract to SPAR Aerospace Ltd. Two MSAT satellites were built jointly by SPAR Aerospace Ltd. and Hughes Space and Communications Co. for this program, the first scheduled for launch in 1994. When scaled for wavelength, the assembly and alignment requirements for the Reflector Assembly were in many instances equivalent to or exceeded that of a diffraction-limited visible light optical system. Combined with logistical constraints inherent to large, compliant, lightweight structures; 'bolt-on' alignment; and remote, indirect spacecraft access; the technical challenges were formidable. This document describes the alignment methods, the special test equipment, and fixturing for Reflector Assembly assembly and alignment.

Young, Jeffrey A.

The Voyager magnetometer boom

The Voyager spacecraft magnetometer experiment utilizes two sensors on a deployable boom. The boom is an Astromast. The implementation of the Astromast into the Voyager design is described along with the hardware used to hold, latch, and deploy the mast and the tests to demonstrate damping, deployment, and alignments. Several problems encountered are discussed and their solutions are given. Flight deployment and preliminary alignment results are presented. Finally, the design is evaluated in retrospect.

Miller, D. C.

Inflatable Tubular Structures Rigidized with Foams

Inflatable tubular structures that have annular cross sections rigidized with foams, and the means of erecting such structures in the field, are undergoing development. Although the development effort has focused on lightweight structural booms to be transported in compact form and deployed in outer space, the principles of design and fabrication are also potentially applicable to terrestrial structures, including components of ultralightweight aircraft, lightweight storage buildings and shelters, lightweight insulation, and sales displays. The use of foams to deploy and harden inflatable structures was first proposed as early as the 1960s, and has been investigated in recent years by NASA, the U.S. Air Force Research Laboratory, industry, and academia. In cases of deployable booms, most of the investigation in recent years has focused on solid cross sections, because they can be constructed relatively easily. However, solid-section foam-filled booms can be much too heavy for some applications. In contrast, booms with annular cross sections according to the present innovation can be tailored to obtain desired combinations of stiffness and weight through choice of diameters, wall thicknesses, and foam densities. By far the most compelling advantage afforded by this innovation is the possibility of drastically reducing weights while retaining or increasing the stiffnesses, relative to comparable booms that have solid foamfilled cross sections. A typical boom according to this innovation includes inner and outer polyimide film sleeves to contain foam that is injected between them during deployment.

Tinker, Michael L.

On-Board Deployment Event Verification for GOES-R Spacecraft

As is common with many spacecraft designs, the GOES-R vehicles require a series of deployment events to transition from the launch configuration to the operational configuration. Rather than implementing additional sensors to verify various deployments, the GOES-R program developed an alternate approach that uses existing gyro rate sensing. The approach includes two pieces: the first is a new onboard shock detection capability to confirm initiation of individual deployment events, and the second is a ground-based dynamics verification step to confirm completion of deployment events. We first present the algorithm that detects shock events for various deployment devices along with the parameter tuning performed during ground tests. We then show inflight performance of the shock detection algorithm. While shock detection is useful for observing initiation of deployment events, completion of some deployment events cannot be determined by shock detection alone. For these events, such as solar panel latch-up and deployable boom extension, the program developed dynamics models for the deployment transient responses. High-rate gyro data were recorded for these events, which allow the ground team to verify that the appendages were fully deployed. We show the predictive models for these events and corresponding flight results.

GeoXO

Full Scale Flat Floor Testing of a 500-M2-Class Solar Sail Deployer

Solar sailing missions rely on deployable systemsfor large area to mass ratios once in space, whilestill being small enough for launcher envelopes inthe stowed configuration. Many of thesedeployable systems feature booms that areflattened and subsequently coiled onto aspool/hub. As part of a collaborative deployablespace structures research effort of NASA and DLR,a boom deployment mechanism for a future 500 m²solar sail has been developed since 2017. To achieve the respective solar sail size goal, 16.5m long booms produced by NASA were integratedinto a DLR-designed deployer mechanism. Thisconsiderable size, as well as the lightweightconstruction of the booms and respectivedeployable systems makes ground testing asignificant challenge. Some systems for gravitycompensation and boom alignment will bepresented in the paper. However, the main focus isthe functional flat floor testing of the integratedboom-deployment mechanism system, as well asits challenges. The testing performed includes full deployment aswell as stowage of the booms. Both have beenperformed multiple times. The latter is one of thekey parameters determining packaging efficiency,which in turn confirms design assumptions. Duringsystem development, small scale tests and modelshave been used in preparation of flat floor testingof the 33 m span cross of the full-scale booms anddeployment mechanism. Hence a small chapter isalso devoted to analysing the differences inbehaviour between small- and full-scaledeployment systems. More parameters that are vital to design decisionshave been determined this way, such as drivingbelt force or hub brake torque. This paper alsofocuses on development goals and needs forfuture steps to achieve higher levels of technologyreadiness, such as the balancing of driving motorforce, synchronisation of its transmission and thecountering hub brake torque

Deployment mechanism

Controls Astrophysics and Structures Experiment in Space (CASES) advanced studies and planning

The CASES (Controls, Astrophysics, and Structures Experiment in Space) program consists of a flight demonstration of CSI (Controls-Structures Interactions) technology on the Space Shuttle. The basis structure consists of a 32 m deployable boom with actuators and sensors distributed along its length. Upon deployment from the Orbiter bay, the CASES structure will be characterized dynamically and its deformations controlled by a series of experimental control laws; and cold gas thrusters at its tip will be used to orient the Orbiter to a fixed celestial reference. The scientific observations will consist of hard x-ray imaging, at high resolution, of the Sun and the Galactic center. The hard x-ray observations require stable (few arc min) pointing at these targets for one or more position-sensitive proportional counters in the Orbiter bay, which view the object to be imaged through an aperture-encoding mask at the boom tip. This report gives the concensus developed at the second CASES Science Working Group meeting, which took place at NASA Marshall Space Flight Center May 16-17, 1990. An earlier paper and scientific summaries are available and form the basis for the present discussion.

Wu, S. T.

RUSAP: A computer program for the calculation of Roll-Up Solar Array Performance characteristics

RUSAP is a FORTRAN 4 computer program designed to determine the performance characteristics (power-to-weight ratio, blanket tension, structural member section dimensions, and resonant frequencies) of large-area, roll-up solar arrays of the single-boom, tensioned-substrate design. The program includes the determination of the size and weight of the base structure supporting the boom and blanket and the determination of the blanket tension and deployable boom stiffness needed to achieve the minimum-weight design for a specified frequency for the first mode of vibration. A complete listing of the program, a description of the theoretical background, and all information necessary to use the program are provided.

Ross, R. G., Jr.

Recent Advances in Solar Sail Propulsion Systems at NASA

Supporting NASA's Science Mission Directorate, the In-Space Propulsion Technology Program is developing solar sail propulsion for use in robotic science and exploration of the solar system. Solar sail propulsion has the potential to provide longer on-station operation, increased scientific payload mass fraction, and access to previously inaccessible orbits for multiple potential science missions. Two different 20-meter solar sail systems were produced and successfully completed functional vacuum testing last year in NASA Glenn s Space Power Facility at Plum Brook Station Ohio. The sails were designed and developed by ATK Space Systems and L'Garde, respectively. The sail systems consist of a central structure with four deployable booms that support the sails. The sail designs are robust enough for deployments in a one atmosphere, one gravity environment and are scalable to much larger solar sails - perhaps as large as 150 meters on a side. In addition, computational modeling and analytical simulations have been performed to assess the scalability of the technology to the large sizes (150 meters) required to implement the first generation of missions using solar sails. Life and space environmental effects testing of sail and component materials are also nearly complete. This paper will summarize recent technology advancements in solar sails and their successful ambient and vacuum environment testing.

Johnson, Les

Recent Advances in Solar Sail Propulsion at NASA

Supporting NASA's Science Mission Directorate, the In-Space Propulsion Technology Program is developing solar sail propulsion for use in robotic science and exploration of the solar system. Solar sail propulsion will provide longer on-station operation, increased scientific payload mass fraction, and access to previously inaccessible orbits for multiple potential science missions. Two different 20-meter solar sail systems were produced and successfully completed functional vacuum testing last year in NASA Glenn's Space Power Facility at Plum Brook Station, Ohio. The sails were designed and developed by ATK Space Systems and L'Garde, respectively. These sail systems consist of a central structure with four deployable booms that support the sails. This sail designs are robust enough for deployments in a one atmosphere, one gravity environment, and are scalable to much larger solar sails-perhaps as much as 150 meters on a side. In addition, computation modeling and analytical simulations have been performed to assess the scalability of the technology to the large sizes (>150 meters) required for first generation solar sails missions. Life and space environmental effects testing of sail and component materials are also nearly complete. This paper will summarize recent technology advancements in solar sails and their successful ambient and vacuum testing.

Johnson, Les

Status of Solar Sail Technology Within NASA

In the early 2000s, NASA made substantial progress in the development of solar sail propulsion systems for use in robotic science and exploration of the solar system. Two different 20-m solar sail systems were produced and they successfully completed functional vacuum testing in NASA Glenn Research Center's (GRC's) Space Power Facility at Plum Brook Station, Ohio. The sails were designed and developed by ATK Space Systems and L Garde, respectively. The sail systems consist of a central structure with four deployable booms that support the sails. These sail designs are robust enough for deployment in a one-atmosphere, one-gravity environment and were scalable to much larger solar sails perhaps as large as 150 m on a side. Computation modeling and analytical simulations were also performed to assess the scalability of the technology to the large sizes required to implement the first generation of missions using solar sails. Life and space environmental effects testing of sail and component materials were also conducted. NASA terminated funding for solar sails and other advanced space propulsion technologies shortly after these ground demonstrations were completed. In order to capitalize on the $30M investment made in solar sail technology to that point, NASA Marshall Space Flight Center (MSFC) funded the NanoSail-D, a subscale solar sail system designed for possible small spacecraft applications. The NanoSail-D mission flew on board the ill-fated Falcon-1 Rocket launched August 2, 2008, and due to the failure of that rocket, never achieved orbit. The NanoSail-D flight spare will be flown in the Fall of 2010. This paper will summarize NASA's investment in solar sail technology to-date and discuss future opportunities

Johnson, Les