Search NASA⌕ Search

SEARCH · Search NASA

Results for “Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

Payload accommodation and development planning tools - A Desktop Resource Leveling Model (DRLM)

The Desktop Resource Leveling Model (DRLM) has been developed as a tool to rapidly structure and manipulate accommodation, schedule, and funding profiles for any kind of experiments, payloads, facilities, and flight systems or other project hardware. The model creates detailed databases describing 'end item' parameters, such as mass, volume, power requirements or costs and schedules for payload, subsystem, or flight system elements. It automatically spreads costs by calendar quarters and sums costs or accommodation parameters by total project, payload, facility, payload launch, or program phase. Final results can be saved or printed out, automatically documenting all assumptions, inputs, and defaults.

Hilchey, John D.↗

KSC Education Technology Research and Development Plan

Educational technology is facilitating new approaches to teaching and learning science, technology, engineering, and mathematics (STEM) education. Cognitive research is beginning to inform educators about how students learn providing a basis for design of more effective learning environments incorporating technology. At the same time, access to computers, the Internet and other technology tools are becoming common features in K-20 classrooms. Encouraged by these developments, STEM educators are transforming traditional STEM education into active learning environments that hold the promise of enhancing learning. This document illustrates the use of technology in STEM education today, identifies possible areas of development, links this development to the NASA Strategic Plan, and makes recommendations for the Kennedy Space Center (KSC) Education Office for consideration in the research, development, and design of new educational technologies and applications.

Odell, Michael R. L.↗

Inspection planning development: An evolutionary approach using reliability engineering as a tool

This paper proposes an evolutionary approach for inspection planning which introduces various reliability engineering tools into the process and assess system trade-offs among reliability, engineering requirement, manufacturing capability and inspection cost to establish an optimal inspection plan. The examples presented in the paper illustrate some advantages and benefits of the new approach. Through the analysis, reliability and engineering impacts due to manufacturing process capability and inspection uncertainty are clearly understood; the most cost effective and efficient inspection plan can be established and associated risks are well controlled; some inspection reductions and relaxations are well justified; and design feedbacks and changes may be initiated from the analysis conclusion to further enhance reliability and reduce cost. The approach is particularly promising as global competitions and customer quality improvement expectations are rapidly increasing.

Graf, David A.↗

Optimization of System Maturity and Equivalent System Mass for Exploration Systems Development Planning

The Exploration Systems Mission Directorate of the National Aeronautics and Space Administration (NASA) is currently pursuing the development of the next generation of human spacecraft and exploration systems throughout the Constellation Program. This includes, among others, habitation technologies for supporting lunar and Mars exploration. The key to these systems is the Exploration Life Support (ELS) system that composes several technology development projects related to atmosphere revitalization, water recovery, waste management and habitation. The proper functioning of these technologies is meant to produce sufficient and balanced resources of water, air, and food to maintain a safe and comfortable environment for long-term human habitation and exploration of space.

Magnaye, Romulo↗

The SETI instrument development plan

The architecture of the instrument system for the SETI (Search for Extraterrestrial Intelligence) program is briefly described and the development approach used to implement the operational instruments is discussed. The two versions of the instrument system include a target survey instrument to observe at a very high sensitivity a selected set of interesting stars that have particular a priori promise, and a sky survey instrument to observe the entire celestial sphere at a lower sensitivity. The targeted survey utilizes the 305 meter antenna at Arecibo, Puerto Rico, a 64 meter DSN antenna, and other large radio telescopes. The Arecibo instrument provides the highest sensitivity by virtue of the antenna gain. The antenna line feeds cover an instantaneous frequency range of 50 MHz (tunable over 100 MHz), while the multichannel spectrum analyzer/signal detector is capable of analyzing a frequency segment 16 MHz wide with a maximum resolution of 1 Hz. The sky survey employs a listen-only, 34 meter antenna. The SETI breadboard development is also described.

Crow, R. B.↗

High resolution, high frame rate video technology development plan and the near-term system conceptual design

The objective of the High Resolution, High Frame Rate Video Technology (HHVT) development effort is to provide technology advancements to remove constraints on the amount of high speed, detailed optical data recorded and transmitted for microgravity science and application experiments. These advancements will enable the development of video systems capable of high resolution, high frame rate video data recording, processing, and transmission. Techniques such as multichannel image scan, video parameter tradeoff, and the use of dual recording media were identified as methods of making the most efficient use of the near-term technology.

Ziemke, Robert A.↗

Zero Power Reactor Database (ZPRD) Development Plan

Past sodium-cooled fast reactors (SFR) were built with an active experimental program in place to support the design and development work. Most of the experimental facilities in the United States that were important for SFR design were shutdown in the 1980s and 1990s. Reactor licensing and construction requires any reactor design to be verified against existing reactor facilities or experimental measurements. With the absence of those experimental facilities, modern SFR projects must rely on historical measurements to demonstrate that the engineering modeling software and data being used for the new reactor design work are reliable. There has been a considerable push in the last 6 years by both DOE and commercial companies to obtain historical experimental measurements that are relevant for SFRs, in particular those with features that are important for the new reactor designs of interest. The zero power reactor experiments carried out at Argonne National Laboratory’s critical facilities (ZPR-3, ZPR-6, ZPR-9, and ZPPR) from the 1950s to the 1980s are some of the best reactor physics experiments on SFR technology that are available today. Of particular interest today are the ZPPR-15 measurements done at the ZPPR facility for the Integral Fast Reactor project in the 1980s as they are in line with most commercial and DOE interests today. In the past 10 years, the measurements done on ZPPR-15 have been processed into both Monte Carlo (MCNP) and deterministic models (MC2-3 and DIF3D) useable for validating the engineering modeling software for key parts of the SFR design work. To achieve this, a detailed model description must be created for the experiment and the experimental measurement that the engineering modeling software is to reproduce. Then, an assessment of the uncertainty on the measured quantity which considers all of the sources of uncertainty in defining the model must be obtained and documented. The models created for ZPPR-15 provide the best validation basis available today for neutronics modeling software. Reference 2 is a good resource to understand how these models were built and how the uncertainties on the measured quantities were derived. The intention of the Zero Power Reactor Database (ZPRD), hosted at frdb.ne.anl.gov, is to make available the experimental measurements and models that have been constructed to-date. Though ZPPR-15 measurements are the primary data requested for validation needs, other measurements on ZPPR, ZPR-6, and ZPR-9 in support of the Clinch River Breeder Reactor (CRBR) and Fast Test Reactor (FFTF) should also be considered important for future software validation needs. In this manuscript, the details of available measurements on ZPR-3, ZPR-6, ZPR-9, and ZPPR facilities are summarized, and a general organization of the web interface is displayed. Many of the documents associated with the measurements are export controlled information so access to the database will also have to be controlled.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Spacecraft Fire Safety Technology Development Plan For Exploration Missions

To date, NASA’s spaceflight operations in the past 5 decades have been limited to a narrow range of conditions from a fire safety perspective. The currently anticipated missions outside of low earth orbit will substantially expand this parameter space to include, extended durations, dormancy intervals, increased oxygen concentrations, partial gravity conditions and the presence of surface dust. All of these changes can have significant impacts on fire safety system design and operations. The overall state of understanding is discussed in this paper along with the identification of the needs for spacecraft fire safety technology development. These needs have been assembled into a roadmap maintained by the Environmental Control and Life Support System Capability Leadership Team that has evolved as the exploration mission concepts have changed. This roadmap continues to communicate the spacecraft fire safety needs for exploration and guide technology development efforts. This paper summarizes the major recent developments in our understanding of spacecraft fire behavior and mitigation. A review of the major technology development needs and discussion of their objectives, status, and future plans is presented. The plan for transitioning knowledge, hardware, and modeling capability resulting from these development efforts to specific exploration vehicle programs and missions is also discussed.

Fire safety↗

Payload software technology: Software technology development plan

Programmatic requirements for the advancement of software technology are identified for meeting the space flight requirements in the 1980 to 1990 time period. The development items are described, and software technology item derivation worksheets are presented along with the cost/time/priority assessments.

Source record↗

Methodology for urban rail and construction technology research and development planning

A series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.

Rubenstein, L. D.↗

Avionics test bed development plan

The plan is for a facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements. This plan outlines a distributed data processing facility that will utilize the current JSC laboratory resources for the test bed development. The future studies required for implementation, the management system for project control, and the baseline system configuration are described.

Harris, L. H.↗

Using space for technology development - Planning for the Space Station era

Experience with the Shuttle and free-flying satellites as technology test-beds has shown the feasibility and desirability of using space assets as a facility for technology development. Thus, by the time the Space Station era will have arrived, the technologist will be ready for an accessible engineering facility in space. As the 21st century is approached, it is expected that virtually every flight to the Space Station Freedom will be required to carry one or more research, technology, and engineering experiments. The experiments planned will utilize both the pressurized volume, and the external payload attachment facilities. A unique, but extremely important, class of experiments will use the Space Station itself as an experimental vehicle. Based upon recent examination of possible Space Station Freedom assembly sequences, technology payloads may well utilize 20-30 percent of available resources.

Ambrus, Judith H.↗

DBBC2 Backend: Status and Development Plan

The Digital Base Band Converter-2 (DBBC2) system is in a mature phase now, and the deployment is continuing. A review of the backend is shown, and the new functionalities in development are reported.

Tuccari, Gino↗

High-energy facility development plan

Approaches to the deployment of instruments for the study of high-energy solar emissions alone or in conjunction with other solar instruments are considered. The Space Station has been identified as the preferred mode for the deployment of the Advanced Solar Observatory, and it is suggested that a proposed High-Energy Facility could be on a coorbiting platform. The implementation plan for the High-Energy Facility involves the definition of the interface structures required to mount the facility instruments to the Space Station and the development of hard X-ray and gamma-ray imaging, spectroscopic, and polarimetric instruments.

Walker, Arthur B. C., Jr.↗

Terrestrial Planet Finder: Technology Development Plans

One of humanity's oldest questions is whether life exists elsewhere in the universe. The Terrestrial Planet Finder (TPF) mission will survey stars in our stellar neighborhood to search for planets and perform spectroscopic measurements to identify potential biomarkers in their atmospheres. In response to the recently published President's Plan for Space Exploration, TPF has plans to launch a visible-light coronagraph in 2014, and a separated-spacecraft infrared interferometer in 2016. Substantial funding has been committed to the development of the key technologies that are required to meet these goals for launch in the next decade. Efforts underway through industry and university contracts and at JPL include a number of system and subsystem testbeds, as well as components and numerical modeling capabilities. The science, technology, and design efforts are closely coupled to ensure that requirements and capabilities will be consistent and meet the science goals.

interferometer↗

Technology Development Plan and Preliminary Results for a Low Temperature Hybrid Mars Ascent Vehicle Concept

A hybrid propulsion system is being considered for a potential Mars Ascent Vehicle (MAV) based on its low temperature capability, ability to restart and high performance. The hybrid’s ability to survive in low and variable temperatures reduces power requirements and therefore system mass. Its ability to restart enables a Single Stage to Orbit (SSTO) design, minimizing system complexity. The hybrid’s high-performance (approximately 314 s Isp (I (sub sp)) (specific impulse in seconds) leads to a low total Gross Lift Off Mass (GLOM). These advantages set the hybrid design above the alternatives in the system studies completed at JPL (Jet Propulsion Laboratory). However, this solution has the lowest Technology Readiness Level (TRL) of the propulsion options. Therefore, a technology development effort has been undertaken to raise the TRL of the hybrid option and potentially enable its infusion into a future MAV or other in-space application. The culmination of this technology development is a flight demonstration, which is currently in the planning phases for launch in the early 2020’s.

Karp, Ashley↗

Deep Space Network-Wide Portal Development: Planning Service Pilot Project

The Deep Space Network (DSN) is an international network of antennas that supports interplanetary spacecraft missions and radio and radar astronomy observations for the exploration of the solar system and the universe. DSN provides the vital two-way communications link that guides and controls planetary explorers, and brings back the images and new scientific information they collect. In an attempt to streamline operations and improve overall services provided by the Deep Space Network a DSN-wide portal is under development. The project is one step in a larger effort to centralize the data collected from current missions including user input parameters for spacecraft to be tracked. This information will be placed into a principal repository where all operations related to the DSN are stored. Furthermore, providing statistical characterization of data volumes will help identify technically feasible tracking opportunities and more precise mission planning by providing upfront scheduling proposals. Business intelligence tools are to be incorporated in the output to deliver data visualization.

project development↗