Advanced Wind Turbine Drivetrain Workshop Presentations
This document contains the presentations delivered at the DOE-sponsored Advanced Drivetrains Workshop in Boulder, Colorado, June 28-30, 2010.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This document contains the presentations delivered at the DOE-sponsored Advanced Drivetrains Workshop in Boulder, Colorado, June 28-30, 2010.
This presentation summarizes the Drivetrain Reliability Collaborative Workshop and report and current and near-term testing activities.
As part of an investigation into turbine operational conditions most likely to cause drivetrain failures, the National Renewable Energy Laboratory (NREL) recently installed a new gearbox and main bearing in the U.S. Department of Energy-owned General Electric 1.5-megawatt SLE turbine.
The increasing integration of renewable energy resources in evolving bulk power system (BPS) is impacting the system inertia. Type-5 wind turbine generation has the potential to behave like a traditional synchronous generator and can help mitigate the impact on system inertia. A hydraulic torque converter (TC) and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine unit. A high fidelity model of Type-5 wind turbine drivetrain is not openly and widely available for grid integration and transient stability studies. This hinders appropriate assessment of Type-5 wind power plant’s contribution to bulk grid resilience. This work develops and validates a TC model based on those generally used in automobile’s transmission system. Moreover, the concept of torsional coupling is leveraged to integrate the TC and gearbox system dynamics. The entire integrated model will be open sourced and publicly available for grid integration studies.
There has been growing demand from the power industry for wind power plants to support power system operations. One such requirement is for wind turbines to provide ancillary services in the form of inertial response. When the grid frequency drops, it is essential for wind turbine generators (WTGs) to inject kinetic energy stored in their inertia into the grid to help arrest the frequency decline. However, the impacts of inertial response on the structural loads of the wind turbine have not been given much attention. To bridge this gap, this paper utilizes a holistic model for both fixed-speed and variable-speed WTGs by integrating the aeroelastic wind turbine model in FAST, developed by the National Renewable Energy Laboratory, with the electromechanical drivetrain model in SimDriveline and SimPowerSystems.
SHI's prototype 2.5 MW wind turbine drivetrain was tested at the NWTC 2.5 MW dynamometer test facility over the course of 4 months between December 2009 and March 2010. This successful testing campaign allowed SHI to validate performance, safety, control tuning, and reliability in a controlled environment before moving to full-scale testing and subsequent introduction of a commercial product intothe American market.
The Boulder Wind Power (BWP) Advanced Gearless Drivetrain Project explored the application of BWP's innovative, axial-gap, air-core, permanent-magnet direct-drive generator in offshore wind turbines. The objective of this CRADA is to assess the benefits that result from reduced towerhead mass of BWP's technology when used in 6 MW offshore turbines installed on a monopile or a floating spar foundation.
Legged robots promise radical mobility for challenging environments, but must be made more energy efficient to be practical. Historically, legged robot design has required efficiency to be traded against versatility. Much energy is lost in actuators and transmissions because few actuation systems are capable of operating efficiently across the wide range of operating conditions (e.g. different joint speeds and torques) required for legged locomotion. We describe a drivetrain topology that overcomes many of these limitations. Our approach combines high-torque electromagnetic motors and low-loss transmissions with a tailored and adjustable set of joint-specific passive mechanisms called support elements, which modulate the energy flow between motors and joints to minimize the electrical energy consumed. We present an optimization-based design method that draws on available bipedal gait data to select optimal support element configurations and parameters. Simple adjustments may be made to support elements at certain joints to enable a wide variety of locomotion with high efficiency. We present results, specific to the 3D humanoid bipedal STEPPR robot, in which support elements are co-optimized across a library of several gaits, converging on a set of designs that predict an average reduction of electrical energy of more than 50% across a set of 15 gaits, with energy savings reaching as much as 85% for some gaits. Concepts were prototyped and tested on a bench testbed, validating the predicted energy savings. Support elements were implemented on STEPPR, and energy savings of more than 35% were demonstrated.
This paper provides an overview of wind turbine drivetrain condition monitoring based on presentations from a condition monitoring workshop organized by the National Renewable Energy Laboratory in 2009 and on additional references.
This work discusses the dynamics of main bearing behavior in three-point suspension drivetrains for wind turbines. Three failure mitigation approaches and preliminary results are presented.
A four wheel drive articulated mine loader is powered by a fuel cell and propelled by a single electric motor. The drivetrain has the first axle, second axle, and motor arranged in series on the work machine chassis. Torque is carried from the electric motor to the back differential via a pinion meshed with the ring gear of the back differential. A second pinion oriented in an opposite direction away from the ring gear is coupled to a drive shaft to transfer torque from the ring gear to the differential of the front axle. Thus, the ring gear of the back differential acts both to receive torque from the motor and to transfer torque to the forward axle. The in-line drive configuration includes a single electric motor and a single reduction gear to power the four wheel drive mine loader.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.
High operation and maintenance costs still hamper the development of the wind industry despite its quick growth worldwide. To reduce unscheduled downtime and avoid catastrophic failures of wind turbines and their components have been and will be crucial to further raise the competitiveness of wind power. Condition monitoring is one of the key tools for achieving such a goal. To enhance the research and development of advanced condition monitoring techniques dedicated to wind turbines, we present an overview of wind turbine condition monitoring, discuss current practices, point out existing challenges, and suggest possible solutions.
This webinar describes DOE's Funding Opportunity Announcement DE-FOA-0000112, and answers frequently asked questions about the funding opportunity.
This presentation describes a methodology for predicting probability of failure of wind turbine gearbox bearings failed by axial cracking. This methodology was applied to a commercial MW size wind plant and generated results were correlated with actual failures. This work is partnered with WindESCo and funded through DOE's Technology Commercialization Fund.
Explore the source record for details and available documents.