Search NASA⌕ Search

SEARCH · Search NASA

Results for “ENERGY REQUIREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Report on Alternative Devices to Pyrotechnics on Spacecraft

Pyrotechnics accomplish many functions on today's spacecraft, possessing minimum volume/weight, providing instantaneous operation on demand, and requiring little input energy. However, functional shock, safety, and overall system cost issues, combined with emergence and availability of new technologies question their continued use on space missions. Upon request from the National Aeronautics and Space Administration's (NASA) Program Management Council (PMC), Langley Research Center (LaRC) conducted a survey to identify and evaluate state-of-the-art non-explosively actuated (NEA) alternatives to pyrotechnics, identify NEA devices planned for NASA use, and investigate potential interagency cooperative efforts. In this study, over 135 organizations were contacted, including NASA field centers, Department of Defense (DOD) and other government laboratories, universities, and American and European industrial sources resulting in further detailed discussions with over half, and 18 face-to-face briefings. Unlike their single use pyrotechnic predecessors, NEA mechanisms are typically reusable or refurbishable, allowing flight of actual tested units. NEAs surveyed include spool-based devices, thermal knife, Fast Acting Shockless Separation Nut (FASSN), paraffin actuators, and shape memory alloy (SMA) devices (e.g., Frangibolt). The electro-mechanical spool, paraffin actuator and thermal knife are mature, flight proven technologies, while SMA devices have a limited flight history. There is a relationship between shock, input energy requirements, and mechanism functioning rate. Some devices (e.g., Frangibolt and spool based mechanisms) produce significant levels of functional shock. Paraffin, thermal knife, and SMA devices can provide gentle, shock-free release but cannot perform critically timed, simultaneous functions. The FASSN flywheel-nut release device possesses significant potential for reducing functional shock while activating nearly instantaneously. Specific study recommendations include: (1) development of NEA standards, specifically in areas of material characterization, functioning rates, and test methods; (2) a systems level approach to assure successful NEA technology application; and (3) further investigations into user needs, along with industry/government system-level real spacecraft cost benefit trade studies to determine NEA application foci and performance requirements. Additional survey observations reveal an industry and government desire to establish partnerships to investigate remaining unknowns and formulate NEA standards, specifically those driven by SMAs. Finally, there is increased interest and need to investigate alternative devices for such functions as stage/shroud separation and high pressure valving. This paper summarizes results of the NASA-LaRC survey of pyrotechnic alternatives. State of-the-art devices with their associated weight and cost savings are presented. Additionally, a comparison of functional shock characteristics of several devices are shown, and potentially related technology developments are highlighted.

Lucy, M. H.↗

Possible Applications of Photoautotrophic Biotechnologies at Lunar Settlements

The most ambitious goal of the Vision of Space Exploration is to extend human presence across the solar system. Today, however, missions would have to bring all of the propellant, air, food, water, habitable volumes and shielding needed to sustain settlers beyond Earth. That is why resources for propellants, life support and construction of support systems and habitats must be found in space and utilized if humans hope to ever explore and colonize the solar system. The life support, fuel production and material processing systems currently proposed for spaceflight are essentially disconnected. Only traditional crop production has been proposed as a segment for bioregenerative life support systems, although the efficiency of higher plants for air regeneration is generally low. Thus, the investigation of air bioregeneration techniques based on the activity of photosynthetic organisms with higher rates of CO2 scrubbing and O2 release is very timely and important. Future systems for organic waste utilization in space may also benefit from the use of specific microorganisms. This janitorial job is efficiently carried out by microbes on Earth, which drive and connect different elemental cycles. It is likely that environmental control and life support systems based on bioregeneration will be capable of converting both organic and inorganic components of the waste at lunar settlements into edible biomass. The most challenging technologies for future lunar settlements are the extraction of elements (e.g. Fe, O, Si, etc) from local rocks for industrial feedstocks and the production of propellants. While such extraction can be accomplished by purely inorganic processes, the high energy requirements of such processes motivates the search for alternative technologies with lower energy requirements and appropriate efficiency. Well-developed terrestrial industrial biotechnologies for metals extraction and conversion could therefore be the prototypes for extraterrestrial biometallurgy.

McKay, David S.↗

Compass Final Report: Nuclear Electric Propulsion (NEP)-Chemical Vehicle 1.2

Many previous studies have examined sending crews to and from Mars. The most economical involved a ‘conjunction’ class whereby the crew spends around 500 days on Mars waiting for a ‘cheap’ return. The total mission time results in over a 1000-day mission duration (about 3 years). Given the current experience level of only one year on the International Space Station (ISS), it of interest to reduce that time to only two years, thus reducing risk and minimizing required Mars surface infrastructure. The Phase 1.1 Study goal was stated as follows, “Determine the feasibility of a two-year roundtrip class Mars mission concept of operation that enables boots on Mars no later than 2036.” While the Phase1 study did show feasibility for the NEP-Chemical option, the 2036 Opposition opportunity was found to stress the schedule due to proposed technology development schedules. A 2039 Opposition (which requires even more energy than the 2036 case) was chosen as representative for Phase 1.2. Phase 1.2 also sought to further refine the concept, building on the feasibility, but addressing several challenges brought by the red team and habitat team. Given the date of 2039, nearer term technologies, primarily nuclear thermal and nuclear electric were deemed as the most viable for these missions. As will be shown, the energy required to perform such a mission in only two years (for the 2039 opportunity at least) is about three times that of the three-year conjunction mission. The rocket equation shows that this mission would then require several times the propellant of the three-year mission unless the specific impulse (ISP) of the propulsion system can be increased. Based on lunar needs, a limit of five Space Launch System (SLS) launchers with 8.4m fairings was imposed for the piloted transportation portion of the mission, limiting the size of the system. When using nuclear electric propulsion, the main limiting factor was packaging the required radiator area. The higher Isp nuclear electric propulsion (NEP) system option is described herein but with a twist: in order to keep the size of radiators packageable in one SLS and use proven reactor power system technology (~1200K reactor outlet temperature and superalloy-class Brayton) the NEP system had to be combined with a chemical propulsion system. This combination of electric propulsion and high thrust chemical was found to be useful in previous design studies combining solar electric propulsion (SEP) and chemical propulsion. Such a combination allowed the low-thrust system to provide significant change in velocity (∆V) during the interplanetary portions of the mission, thereby notably reducing the ∆V required by the high thrust system to capture and depart from the Mars gravity well. Here the high thrust ‘impulsive’ system is more efficient due to the Oberth Effect. A plethora of trades, both at the mission and system level, as well as the subsystem level were performed to develop these vehicle concepts. An entire family of NEP-Chemical transportation vehicles is described herein. The main driver and the primary focus was the piloted vehicle but additional concepts for cargo were performed using the same ‘building blocks’ in order to reduce costs and provide commonality.

Nuclear Power↗

UAM Instrument Flight Procedure Design and Evaluation in the Joby Flight Simulator

NASA’s Advanced Air Mobility (AAM) National Campaign (NC) partnered with Joby Aviation to test and evaluate different developmental candidate Urban Air Mobility (UAM) Instrument Flight Procedure (IFP) designs including new departure, enroute, approach and missed approach architectures using Joby’s high-fidelity engineering aircraft simulator. In conjunction with the simulator testing, this effort also evaluated related aspects such as charting, coding, and adherence to flight planning criteria. The test objectives were to assess the safety, efficiency, passenger comfort and noise of the different variations of the developmental IFPs. Safety-related measures include clearance from terrain and vertical obstructions, procedure flyability, and flight path conformance. Efficiency-related measures included time required, airspace volume required, and battery energy required. Passenger comfort and ride quality measures include roll/pitch angles, roll/pitch attitude change rates, and airspeeds prior to aggressive maneuvers, subjective pilot/passenger responses and acceleration forces. The noise impacts of the different IFPs will be interpolated/extrapolated using data from the simulator fed into a separate Joby acoustic software-based tool. Overall, several tradeoffs were identified and characterized between the different variations of the developmental IFP profiles. No single version of the developmental IFP structure scored highest across all measures listed above; rather, different IFP variations proved optimal for different measures, confirming that the best IFP depends on which specific measures are prioritized for a given aircraft, location and operation.

National Campaign↗

Evaluation of Heat Recuperation in a Concentric Hydrogen Reduction Reactor

Heat recuperation in an ISRU reactor system involves the recovery of heat from a reacted regolith batch by transferring this energy into a batch of fresh regolith. One concept for a hydrogen reduction reactor is a concentric chamber design where heat is transferred from the inner, reaction chamber into fresh regolith in the outer, recuperation chamber. This concept was tested and analyzed to define the overall benefit compared to a more traditional single chamber batch reactor. Data was gathered for heat-up and recuperation in the inner chamber alone, simulating a single chamber design, as well as recuperation into the outer chamber, simulating a dual chamber design. Experimental data was also used to improve two analytical models, with good agreement for temperature behavior during recuperation, calculated mass of the reactor concepts, and energy required during heat-up. The five tests, performed using JSC-1A regolith simulant, also explored the effectiveness of helium gas fluidization, hydrogen gas fluidization, and vibrational fluidization. Results indicate that higher hydrogen volumetric flow rates are required compared to helium for complete fluidization and mixing, and that vibrational fluidization may provide equivalent mixing while eliminating the need to flow large amounts of excess hydrogen. Analysis of the total energy required for heat-up and steady-state operations for a variety of conditions and assumptions shows that the dual-chamber concept requires the same or more energy than the single chamber concept. With no clear energy savings, the added mass and complexity of the dual-chamber makes it unlikely that this design concept will provide any added benefit to the overall ISRU oxygen production system.

Linne, Diane↗

Mission applications of electric propulsion

This paper reviews the mission applications of electric propulsion. The energy requirements of candidate high-energy missions gaining in NASA priority are used to highlight the potential of electric propulsion. Mission-propulsion interfaces are examined to point out differences between chemical and electric applications. Brief comparisons between ballistic requirements and capabilities and those of electric propulsion show that electric propulsion is presently the most practical and perhaps the only technology which can accomplish missions with these energy requirements.

Atkins, K. L.↗

On the energy budget in the current disruption region

This study investigates the energy budget in the current disruption region of the magnetotail, coincident with a pre-onset thin current sheet, around substorm onset time using published observational data and theoretical estimates. We find that the current disruption/dipolarization process typically requires energy inflow into the primary disruption region. The disruption dipolarization process is therefore endoenergetic, i.e., requires energy input to operate. Therefore we argue that some other simultaneously operating process, possibly a large scale magnetotail instability, is required to provide the necessary energy input into the current disruption region.

Hesse, Michael↗

Strategic avionics technology definition studies. Subtask 3-1A: Electrical Actuation (ELA) systems

This interim report presents the preliminary results of an electrical actuation (ELA) system study (subtask TA3-1A) to support the NASA strategic avionics technology definition studies. The final report of this ELA study is scheduled for September 30, 1993. The topics are presented in viewgraph form and include the following ELA technology demonstration testing; ELA system baseline; power and energy requirements for shuttle effector systems; power efficiency and losses of ELA effector systems; and power and energy requirements for ELA power sources.

Lum, Ben T. F.↗

Development of system design information for carbon dioxide using an amine type sorber

Development work on system design information for amine type carbon dioxide sorber is reported. Amberlite IR-45, an aminated styrene divinyl benzene matrix, was investigated to determine the influence of design parameters of sorber particle size, process flow rate, CO2 partial pressure, total pressure, and bed designs. CO2 capacity and energy requirements for a 4-man size system were related mathematically to important operational parameters. Some fundamental studies in CO2 sorber capacity, energy requirements, and process operation were also performed.

Rankin, R. L.↗

Transient Optimization for the Betterment of Turbine Electrified Energy Management

Gas turbine engine transients are associated with degraded compressor operability, which must be addressed by the engine control system and accounted for in the engine design. Failure to do so may result in events such as compressor stall/surge and combustor blow out. Transient operability concerns constrain the engine design and can result in sacrifices of efficiency and/or thrust responsiveness. The traditional approach to transient operability management is control logic that limits the fuel flow command. A companion paper presents a strategy for optimizing the transient fuel flow control logic taking into consideration transient operability and thrust responsiveness. The study covered here extends this idea to an electrified gas turbine engine that employs a power/energy management concept known as Turbine Electrified Energy Management (TEEM). TEEM uses an electric power system interfaced with the engine (hence the term ‘electrified gas turbine engine’) to further improve transient operability and alleviate associated design constraints. There can be costs associated with implementing TEEM in terms of power and energy requirements that impact the size of the electrical power system. However, the results of this study show that through optimization of the transient limit logic, power and energy requirements needed to implement TEEM can be significantly reduced. Among the conclusions that can be drawn from the results of the illustrative application covered herein are: (1) there is a reduction in the electric machine power requirement to manage operability during accelerations by 200 to 400 hp, and (2) power transfer from the low pressure spool (LPS) to the high pressure spool (HPS) is the most effective option for improving operability during decelerations, followed by the options of only injecting power on the HPS or only extracting power from the LPS.

Turbine Electrified Energy Management↗

Transient Optimization for the Betterment of Turbine Electrified Energy Management

Gas turbine engine transients are associated with degraded compressor operability, which must be addressed by the engine control system and accounted for in the engine design. Failure to do so may result in events such as compressor stall/surge and combustor blow out. Transient operability concerns constrain the engine design and can result in sacrifices of efficiency and/or thrust responsiveness. The traditional approach to transient operability management is control logic that limits the fuel flow command. A companion paper presents a strategy for optimizing the transient fuel flow control logic taking into consideration transient operability and thrust responsiveness. The study covered here extends this idea to an electrified gas turbine engine that employs a power/energy management concept known as Turbine Electrified Energy Management (TEEM). TEEM uses an electric power system interfaced with the engine (hence the term ‘electrified gas turbine engine’) to further improve transient operability and alleviate associated design constraints. There can be costs associated with implementing TEEM in terms of power and energy requirements that impact the size of the electrical power system. However, the results of this study show that through optimization of the transient limit logic, power and energy requirements needed to implement TEEM can be significantly reduced. Among the conclusions that can be drawn from the results of the illustrative application covered herein are: (1) there is a reduction in the electric machine power requirement to manage operability during accelerations by 200 to 400 hp, and (2) power transfer from the low pressure spool (LPS) to the high pressure spool (HPS) is the most effective option for improving operability during decelerations, followed by the options of only injecting power on the HPS or only extracting power from the LPS.

transient↗

Transient Optimization for the Betterment of Turbine Electrified Energy Management

Gas turbine engine transients are associated with degraded compressor operability, which must be addressed by the engine control system and accounted for in the engine design. Failure to do so may result in events such as compressor stall/surge and combustor blow out. Transient operability concerns constrain the engine design and can result in sacrifices of efficiency and/or thrust responsiveness. The traditional approach to transient operability management is control logic that limits the fuel flow command. A companion paper presents a strategy for optimizing the transient fuel flow control logic taking into consideration transient operability and thrust responsiveness. The study covered here extends this idea to an electrified gas turbine engine that employs a power/energy management concept known as Turbine Electrified Energy Management (TEEM). TEEM uses an electric power system interfaced with the engine (hence the term ‘electrified gas turbine engine’) to further improve transient operability and alleviate associated design constraints. There can be costs associated with implementing TEEM in terms of power and energy requirements that impact the size of the electrical power system. However, the results of this study show that through optimization of the transient limit logic, power and energy requirements needed to implement TEEM can be significantly reduced. Among the conclusions that can be drawn from the results of the illustrative application covered herein are: (1) there is a reduction in the electric machine power requirement to manage operability during accelerations by 200 to 400 hp, and (2) power transfer from the low pressure spool (LPS) to the high pressure spool (HPS) is the most effective option for improving operability during decelerations, followed by the options of only injecting power on the HPS or only extracting power from the LPS.

transient↗

The development of a solar residential heating and cooling system

The MSFC solar heating and cooling facility was assembled to demonstrate the engineering feasibility of utilizing solar energy for heating and cooling buildings, to provide an engineering evaluation of the total system and the key subsystems, and to investigate areas of possible improvement in design and efficiency. The basic solar heating and cooling system utilizes a flat plate solar energy collector, a large water tank for thermal energy storage, heat exchangers for space heating, and an absorption cycle air conditioner for space cooling. A complete description of all systems is given. Development activities for this test system included assembly, checkout, operation, modification, and data analysis, all of which are discussed. Selected data analyses for the first 15 weeks of testing are included, findings associated with energy storage and the energy storage system are outlined, and conclusions resulting from test findings are provided. An evaluation of the data for summer operation indicates that the current system is capable of supplying an average of 50 percent of the thermal energy required to drive the air conditioner. Preliminary evaluation of data collected for operation in the heating mode during the winter indicates that nearly 100 percent of the thermal energy required for heating can be supplied by the system.

Source record↗

Microlith-Based Catalytic Reactor for Air Quality and Trace Contaminant Control Applications

Traditionally, gaseous compounds such as methane, carbon monoxide, and trace contaminants have posed challenges for maintaining clean air in enclosed spaces such as crewed spacecraft cabins as they are hazardous to humans and are often difficult to remove by conventional adsorption technology. Catalytic oxidizers have provided a reliable and robust means of disposing of even trace levels of these compounds by converting them into carbon dioxide and water. Precision Combustion, Inc. (PCI) and NASA - Marshall (MSFC) have been developing, characterizing, and optimizing high temperature catalytic oxidizers (HTCO) based on PCI's patented Microlith® technology to meet the requirements of future extended human spaceflight explorations. Current efforts have focused on integrating the HTCO unit with a compact, simple recuperative heat exchanger to reduce the overall system size and weight while also reducing its energy requirements. Previous efforts relied on external heat exchangers to recover the waste heat and recycle it to the oxidizer to minimize the system's power requirements; however, these units contribute weight and volume burdens to the overall system. They also result in excess heat loss due to the separation of the HTCO and the heat recuperator, resulting in lower overall efficiency. Improvements in the recuperative efficiency and close coupling of HTCO and heat recuperator lead to reductions in system energy requirements and startup time. Results from testing HTCO units integrated with heat recuperators at a variety of scales for cabin air quality control and heat melt compactor applications are reported and their benefits over previous iterations of the HTCO and heat recuperator assembly are quantified in this paper.

Vilekar, Saurabh↗

Thrust Stand Measurements of a Conical Inductive Pulsed Plasma Thruster

Inductive Pulsed Plasma Thrusters (iPPT) spacecraft propulsion devices in which electrical energy is capacitively stored and then discharged through an inductive coil. The thruster is electrodeless, with a time-varying current in the coil interacting with a plasma covering the face of the coil to induce a plasma current Propellant is accelerated and expelled at a high exhaust velocity (O(10 -- 100 km/s)) by the Lorentz body force arising from the interaction of the magnetic field and the induced plasma current. While this class of thruster mitigates the life-limiting issues associated with electrode erosion, inductive pulsed plasma thrusters can suffer from both high pulse energy requirements imposed by the voltage demands of inductive propellant ionization, and low propellant utilization efficiencies. While this class of thruster mitigates the life-limiting issues associated with electrode erosion, inductive pulsed plasma thrusters can suffer from both high pulse energy requirements imposed by the voltage demands of inductive propellant ionization, and low propellant utilization efficiencies. A conical coil geometry may offer higher propellant utilization efficiency over that of a at inductive coil, however an increase in propellant utilization may be met with a decrease in axial electromagnetic acceleration, and in turn, a decrease in the total axially-directed kinetic energy imparted to the propellant.

Hallock, Ashley K.↗

Towards Integrated Pulse Detonation Propulsion and MHD Power

The interest in pulse detonation engines (PDE) arises primarily from the advantages that accrue from the significant combustion pressure rise that is developed in the detonation process. Conventional rocket engines, for example, must obtain all of their compression from the turbopumps, while the PDE provides additional compression in the combustor. Thus PDE's are expected to achieve higher I(sub sp) than conventional rocket engines and to require smaller turbopumps. The increase in I(sub sp) and the decrease in turbopump capacity must be traded off against each other. Additional advantages include the ability to vary thrust level by adjusting the firing rate rather than throttling the flow through injector elements. The common conclusion derived from these aggregated performance attributes is that PDEs should result in engines which are smaller, lower in cost, and lighter in weight than conventional engines. Unfortunately, the analysis of PDEs is highly complex due to their unsteady operation and non-ideal processes. Although the feasibility of the basic PDE concept has been proven in several experimental and theoretical efforts, the implied performance improvements have yet to be convincingly demonstrated. Also, there are certain developmental issues affecting the practical application of pulse detonation propulsion systems which are yet to be fully resolved. Practical detonation combustion engines, for example, require a repetitive cycle of charge induction, mixing, initiation/propagation of the detonation wave, and expulsion/scavenging of the combustion product gases. Clearly, the performance and power density of such a device depends upon the maximum rate at which this cycle can be successfully implemented. In addition, the electrical energy required for direct detonation initiation can be significant, and a means for direct electrical power production is needed to achieve self-sustained engine operation. This work addresses the technological issues associated with PDEs for integrated aerospace propulsion and MHD power. An effort is made to estimate the energy requirements for direct detonation initiation of potential fuel/oxidizer mixtures and to determine the electrical power requirements. This requirement is evaluated in terms of the possibility for MHD power generation using the combustion detonation wave. Small scale laboratory experiments were conducted using stoichiometric mixtures of acetylene and oxygen with an atomized spray of cesium hydroxide dissolved in alcohol as an ionization seed in the active MHD region. Time resolved thrust and MHD power generation measurements were performed. These results show that PDEs yield higher I(sub sp) levels than a comparable rocket engine and that MHD power generation is viable candidate for achieving self-excited engine operation.

Litchford, Ron J.↗

Grown organic matter as a fuel raw material resource

An extensive search was made on biomass production from the standpoint of climatic zones, water, nutrients, costs and energy requirements for many species. No exotic species were uncovered that gave hope for a bonanza of biomass production under culture, location, and management markedly different from those of existing agricultural concepts. A simulation analysis of biomass production was carried out for six species using conventional production methods, including their production costs and energy requirements. These estimates were compared with data on food, fiber, and feed production. The alternative possibility of using residues from food, feed, or lumber was evaluated. It was concluded that great doubt must be cast on the feasibility of producing grown organic matter for fuel, in competition with food, feed, or fiber. The feasibility of collecting residues may be nearer, but the competition for the residues for return to the soil or cellulosic production is formidable.

Roller, W. L.↗

Performance of High-Resolution Mo/Cu Transition Edge Sensors Fabricated Using a Lift-Off Process

The soft X-ray band below ≈0.5 keV is expected to provide rich information on metallicity, temperature, and distribution of hot gas in our galaxy and the intergalactic medium. Resolving these densely spaced emission lines requires energy resolution on the order of 1--2 eV. The low count rates from diffuse astrophysical sources also necessitate large collection areas, particularly for a sounding rocket instrument with short exposure times and limited resources. This translates to large pixel sizes (about 1 mm 2 ) for a reasonable number of read-out channels. To achieve the required energy resolution with 200 nm thin Au absorbers (heat capacity C about 1 pJ/K), we are developing TES microcalorimeters with very high temperature sensitivity (αI), low enough current sensitivity (βI), and minimal excess noise (M). Out of the various fabrication approaches for the TES bilayer we have explored, the lift-off approach (as pioneered for Mo/Au TES by Joel Weber at NIST) so far is the simplest to execute. The simple square TES geometries we have tested to date show promising results for αI and βI. Measured complex impedance and noise for bare devices without absorbers are well described by two-body thermal models and their excess noise is found to be consistent with predictions for mixed-down Johnson noise by Wessels et al. More sensitive measurements with larger heat capacity are planned to accurately determine excess noise. In this paper, we give an overview of the process and summarize results of our detailed characterization measurements for thermal conductance G, αI, βI, and noise for several devices across a range of bias points.

Felix T Jaeckel↗