60 records · Page 4

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

Public and private funding for end-use energy efficiency actions is expected to increase significantly in the United States over the next decade. For example, Barbose et al (2009) estimate that spending on ratepayer-funded energy efficiency programs in the U.S. could increase from $3.1 billion in 2008 to $7.5 and 12.4 billion by 2020 under their medium and high scenarios. This increase in spending could yield annual electric energy savings ranging from 0.58% - 0.93% of total U.S. retail sales in 2020, up from 0.34% of retail sales in 2008. Interest in and support for energy efficiency has broadened among national and state policymakers. Prominent examples include {approx}$18 billion in new funding for energy efficiency programs (e.g., State Energy Program, Weatherization, and Energy Efficiency and Conservation Block Grants) in the 2009 American Recovery and Reinvestment Act (ARRA). Increased funding for energy efficiency should result in more benefits as well as more scrutiny of these results. As energy efficiency becomes a more prominent component of the U.S. national energy strategy and policies, assessing the effectiveness and energy saving impacts of energy efficiency programs is likely to become increasingly important for policymakers and private and public funders of efficiency actions. Thus, it is critical that evaluation, measurement, and verification (EM&V) is carried out effectively and efficiently, which implies that: (1) Effective program evaluation, measurement, and verification (EM&V) methodologies and tools are available to key stakeholders (e.g., regulatory agencies, program administrators, consumers, and evaluation consultants); and (2) Capacity (people and infrastructure resources) is available to conduct EM&V activities and report results in ways that support program improvement and provide data that reliably compares achieved results against goals and similar programs in other jurisdictions (benchmarking). The National Action Plan for Energy Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources often with multiple program administrators and intended to meet multiple purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving Deeper Energy Savings in Federal Energy Performance Contracts

Legislation requires each agency of the US federal government to reduce the aggregate energy use index of its buildings by 30% by 2015, with respect to a 2003 baseline. The declining availability of appropriated funding means that energy performance contracting will be key to achieving this goal. Historically however, energy performance contracts have been able to reduce energy use by only about 20% over baseline. Achieving 30% energy reductions using performance contracting will require new approaches and a specific focus on achieving higher energy savings, both by ESCOs and by agencies. This paper describes some of the ways federal agencies are meeting this challenge, and presents results from the efforts of one agency the US General Services Administration -- to achieve deeper energy savings in conventional energy savings performance contracts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

eProject Builder

eProject Builder enables Energy Services Companies (ESCOs) and their contracting agencies to: 1. upload and track project-level Information 2. generate basic project reports required by local, state, and/or federal agencies 3. benchmark new Energy Savings Performance Contract (ESPC) projects against historical data

Source record↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗