Search NASA⌕ Search

SEARCH · Search NASA

Results for “ESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Refractory Inclusion Size Distribution and Fabric Measured in a Large Slab of the Allende CV3 Chondrite

Aggregate textures of chondrites reflect accretion of early-formed particles in the solar nebula. Explanations for the size and density variations of particle populations found among chondrites are debated. Differences could have risen out of formation in different locations in the nebula, and/or they could have been caused by a sorting process [1]. Many ideas on the cause of chondrule sorting have been proposed; some including sorting by mass [2,3], by X-winds [4], turbulent concentration [5], and by photophoresis [6]. However, few similar studies have been conducted for Ca-, Al-rich inclusions (CAIs). These particles are known to have formed early, and their distribution could attest to the early stages of Solar System (ESS) history. Unfortunately, CAIs are not as common in chondrites as chondrules are, reducing the usefulness of studies restricted to a few thin sections. Furthermore, the largest sizes of CAIs are generally much larger than chondrules, and therefore rarely present in most studied chondrite thin sections. This study attempts to perform a more representative sampling of the CAI population in the Allende chondrite by investigating a two decimeter-sized slab.

Srinivasan, P.↗

Conflict Resolution Strategies for Balloon-Airship Encounters in Upper Class E Air Traffic Management (ETM)

This paper examines strategic conflict resolution strategies for pair-wise high-altitude balloon, airship encounters. By strategic is meant that the conflict is identified (detected) at the time of flight plan submission or flight plan alteration through a service, such as an ETM Service Supplier (ESS). We investigate optimal control solutions for two classes of problems: non-cooperative, where the balloon must alter its ascent trajectory in order to avoid the airship and cooperative, where both vehicles make maneuvers through a negotiation protocol.

airship balloon negotiation optimal control↗

Conflict Resolution Strategies for Balloon-Airship Encounters in Upper Class E Air Traffic Management (ETM)

This paper examines strategic conflict resolution strategies for pair-wise high-altitude balloon, airship encounters. By strategic is meant that the conflict is identified (detected) at the time of flight plan submission or flight plan alteration through a service, such as an ETM Service Supplier (ESS). We investigate optimal control solutions for two classes of problems: non-cooperative, where the balloon must alter its ascent trajectory in order to avoid the airship and cooperative, where both vehicles make maneuvers through a negotiation protocol.

airship balloon negotiation optimal control↗

Galileo probe battery systems design

NASA's Galileo mission to Jupiter will consist of a Jovian orbiter and an atmospheric entry probe. The power for the probe will be derived from two primary power sources. The main source is composed of three Li-SO2 battery modules containing 13 D-size cell strings per module. These are required to retain capacity for 7.5 years, support a 150 day clock, and a 7 hour mission sequence of increasing loads from 0.15 to 9.5 amperes for the last 30 minutes. This main power source is supplemented by two thermal batteries (CaCrO4-Ca) for use in firing the pyrotechnic initiators during the atmospheric staging events. This paper describes design development and testing of these batteries at the system level.

Dagarin, B. P.↗

Galileo probe battery program - An historical overview

The Galileo Probe mission to Jupiter required the selection of a battery module design that exceeded the known state of the art in 1977. The choice of the lithium-sulfur dioxide system, a technology then under development for nonaerospace applications necessitated an extensive cell and module development program that ultimately resulted in a space-qualified product that satisfies the severe constraints and requirements of the Galileo mission. The development program drew on the data base and experience then available from other government-sponsored lithium-sulfur dioxide programs and is an example of multiapplication synergism that can be derived from industry and government cooperation.

Krause, S. J.↗

Aerodynamic requirements for a Mars rover/sample return aerocapture vehicle

The sensitivity of Martian aerocapture performance to L/D and flight path angle is studied. By adding the minimum energy constraint to the classical corridor width definition, an L/D of at least 0.8 was found to be necessary to ensure a 3.0-deg actual corridor width. The plane change desired during the aeropass was also found to affect L/D requirements.

Ess, Robert H., Jr.↗

Atmospheric effects on Martian aerocapture

A preliminary study of the effects of the atmosphere on Martian aerocapture has been completed at NASA-Johnson. Nominal cases were defined and several types of density dispersions utilized to show the effect of L/D ratio on aerocapture performance. Both open and closed loop three-degree-of-freedom simulations were developed. The open loop work demonstrated the reduction of the aerocapture corridor in the presence of density biases and shears. Closed loop runs were studied in the presence of shear-biases where the aerocapture trajectory was divided into three regions or phases. Each phase independently had a nominal density or a dispersed + 100 percent density. Two phase combinations were found to cause aerocapture failures with the three L/Ds considered: 0.3, 0.7, 1.0. There is a significant improvement in aerocapture performance as the L/D is increased from 0.3 to 0.7, but a much smaller increase in performance as the L/D is increased from 0.7 to 1.0. Based on current knowledge of the Martian atmosphere, a minimum L/D of 0.7 is recommended for early Mars missions.

Ess, Robert H.↗

A Low-Cost Design and Flight Test of the T-38 Inlet

An inlet redesign of the T-38 was completed and flight tested by NASA Johnson Space Center (JSC), Houston Texas. The redesign will allow full gross weight takeoffs from high altitude airports such as El Paso, Texas (ELP) with runway temperatures up to 99 degrees F, an increase of 9 degrees F over the current performance. This project was completed in-house using innovative test techniques. The static thrust of the T-38 was increased 20% with this new inlet.

Johnson, Greg↗

Achieving Space Shuttle Abort-to-Orbit Using the Five-Segment Booster

The Five-Segment Booster design concept was evaluated by a team that determined the concept to be feasible and capable of achieving the desired abort-to-orbit capability when used in conjunction with increased Space Shuttle main engine throttle capability. The team (NASA Johnson Space Center, NASA Marshall Space Flight Center, ATK Thiokol Propulsion, United Space Alliance, Lockheed-Martin Space Systems, and Boeing) selected the concept that provided abort-to-orbit capability while: 1) minimizing Shuttle system impacts by maintaining the current interface requirements with the orbiter, external tank, and ground operation systems; 2) minimizing changes to the flight-proven design, materials, and processes of the current four-segment Shuttle booster; 3) maximizing use of existing booster hardware; and 4) taking advantage of demonstrated Shuttle main engine throttle capability. The added capability can also provide Shuttle mission planning flexibility. Additional performance could be used to: enable implementation of more desirable Shuttle safety improvements like crew escape, while maintaining current payload capability; compensate for off nominal performance in no-fail missions; and support missions to high altitudes and inclinations. This concept is a low-cost, low-risk approach to meeting Shuttle safety upgrade objectives. The Five-Segment Booster also has the potential to support future heavy-lift missions.

Craft, Joe↗

The Development of the Ares I-X Flight Test

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

Ess, Robert H.↗

Ares I-X 30 Day Report

This slide presentation represents the 30 day report on the Ares I-X test flight. Included in the review is information on the following areas: (1) Ground Systems, (2) Guidance, Navigation and Control, (3) Roll Response, (4) Vehicle Response, (5) Control System Performance, (6) Structural Damping, (7) Thrust Oscillation, (8) Stage Separation, (9) Connector Assessment, (10) USS Splashdown, (11) Data Recorder and (12) FS Hardware Assessment.

Ess, Bob↗

KSC Engineering Academy (KEA): Ares 1-X Overview

The presentation provides an overview of the ARES 1-X program. Videos include avionics ATVC actuator testing, GS damper retractor, GS vortex shedding, RoCS hot fire at WSTF, RoCS Peacekeeper tests, RoCS installation, thrust OSC, amd Ares 1-X fly through.

Ess, Bob↗

Using the ISS as a Testbed to Prepare for the Next Generation of Space-Based Telescopes

The ISS provides a unique opportunity to develop the technologies and operational capabilities necessary to assemble future large space telescopes that may be used to investigate planetary systems around neighboring stars. Assembling telescopes in space is a paradigm-shifting approach to space astronomy. Using the ISS as a testbed will reduce the technical risks of implementing this major scientific facility, such as laser metrology and wavefront sensing and control (WFSC). The Optical Testbed and Integration on ISS eXperiment (OpTIIX) will demonstrate the robotic assembly of major components, including the primary and secondary mirrors, to mechanical tolerances using existing ISS infrastructure, and the alignment of the optical elements to a diffraction-limited optical system in space. Assembling the optical system and removing and replacing components via existing ISS capabilities, such as the Special Purpose Dexterous Manipulator (SPDM) or the ISS flight crew, allows for future experimentation and repair, if necessary. First flight on ISS for OpTIIX, a small 1.5 meter optical telescope, is planned for 2015. In addition to demonstration of key risk-retiring technologies, the OpTIIX program includes a public outreach program to show the broad value of ISS utilization.

Ess, Kim↗

The ISS as a Testbed for Future Large Astronomical Observatories: The OpTIIX Demonstration Program

Future large (diameters in excess of approx. 10 m) astronomical observatories in space will need to employ advanced technologies if they are to be affordable. Many of these technologies are ready to be validated on orbit and the International Space Station (ISS) provides a suitable platform for such demonstrations. These technologies include low-cost, low-density, highly deformable mirror segments, coupled with advanced sensing and control methods. In addition, the ISS offers available telerobotic assembly techniques to build an optical testbed that embodies this new cost-effective approach to assemble and achieve diffraction-limited optical performance for very large space telescopes. Given the importance that NASA attaches to the recommendations of the National Academy of Sciences "Decadal Survey" process, essential capabilities and technologies will be demonstrated well in advance of the next Survey, which commences in 2019. To achieve this objective, the Jet Propulsion Laboratory (JPL), NASA Johnson Space Center (JSC), NASA Goddard Space Flight Center (GSFC), and the Space Telescope Science Institute (STScI) are carrying out a Phase A/B study of the Optical Testbed and Integration on ISS eXperiment (OpTIIX). The overarching goal is to demonstrate well before the end of this decade key capabilities intended to enable very large optical systems in the decade of the 2020s. Such a demonstration will retire technical risk in the assembly, alignment, calibration, and operation of future space observatories. The OpTIIX system, as currently designed, is a six-hexagon element, segmented visual-wavelength telescope with an edge-to-edge aperture of 1.4 m, operating at its diffraction limit,

Burdick, G.↗