Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric Generation and Transmission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Large-Scale Simulation of Regional Demand Flexibility Implementation and Customer Economic Impact

The Distribution System Operator with Transactive (DSO+T) study conducted a large-scale simulation of over 60,000 customers in a region the size of Texas to demonstrate the effective coordination of distributed energy resources (DERs) in commercial and residential buildings. The integrated simulation included both the bulk (wholesale generation and transmission) and distribution systems. The DERs (including batteries, electric vehicles, air conditioning, and water heaters) participated in a transactive energy retail market that was integrated into an existing competitive wholesale market. The engineering and economic performance of the resulting demand flexibility was evaluated over annual simulations for both moderate and high renewable generation scenarios. A detailed parametric cost model was developed to enable detailed economic analysis of key stakeholders. In addition, fixed and dynamic customer tariffs were designed and applied to the customer population. This allowed the impact on annual customer bills to be analyzed for various building types (residential versus commercial; single- versus multi-family). This paper presents results showing the relative flexibility of batteries, electric vehicles, and building loads throughout the year and under different renewable scenarios. This feeds a detailed breakdown of the impact this flexibility has on the operating costs of the grid and the resulting net economic benefit. Finally, the study showed that practically all customer classes (including non-participating customers) save money under the proposed demand flexibility scheme. The study found overall net annual economic savings of $3.3-5.0B for a region the size of Texas equating to average customer bill savings of 10-16%.

Reeve, Hayden M.↗

Convex Relaxations of Maximal Load Delivery for Multi-Contingency Analysis of Joint Electric Power and Natural Gas Transmission Networks

Recent increases in gas-fired power generation have engendered increased interdependencies between natural gas and power transmission systems. These interdependencies have amplified existing vulnerabilities in gas and power grids, where disruptions can require the curtailment of load in one or both systems. Although typically operated independently, coordination of these systems during severe disruptions can allow for targeted delivery to lifeline services, including gas delivery for residential heating and power delivery for critical facilities. To address the challenge of estimating maximum joint network capacities under such disruptions, we consider the task of determining feasible steady-state operating points for severely damaged systems while ensuring the maximal delivery of gas and power loads simultaneously, represented mathematically as the nonconvex joint Maximal Load Delivery (MLD) problem. To increase its tractability, we present a mixed-integer convex relaxation of the MLD problem. Then, to demonstrate the relaxation’s effectiveness in determining bounds on network capacities, exact and relaxed MLD formulations are compared across various multi-contingency scenarios on nine joint networks ranging in size from 25 to 1191 nodes. The relaxation-based methodology is observed to accurately and efficiently estimate the impacts of severe joint network disruptions, often converging to the relaxed MLD problem’s globally optimal solution within ten seconds.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evolution of Electric Sector Water Use Under Alternative Electricity Futures

Increasing competition for water resources in the United States could create future challenges for allocating and using thermal cooling water in the U.S. electric power sector. While thermal power plant retirements and the growth of wind and solar technologies can reduce national aggregate power sector cooling water use, local water constraints and growing demand for agricultural or municipal supply could create greater needs for higher-cost alternative water supplies such as groundwater or recycled wastewater. For some regions, these incentives could change future electricity planning and operational decisions. These relationships and impacts are studied here using the National Renewable Energy Laboratory (NREL) Regional Energy Deployment System (ReEDS), a national electric sector planning model that has recently been upgraded to include a highly detailed representation of thermal cooling water demand and supply. Thermal power technologies are differentiated by both cooling technology and water source type to track and constrain thermal cooling water use in a way that incorporates both physical and legal water considerations in the United States. This capability is exercised under a range of electricity sector futures with alternative technology costs, fuel prices, and water constraints to illustrate ways that U.S. electric sector water use could evolve under uncertain future electric sector drivers. In exploring changes to regional generation and transmission planning and operation, water requirements, and cost, we highlight the environmental and economic impacts of future power sector water decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cryogenic C-band wavelength division multiplexing system using an AIM Photonics Foundry process design kit

Cryogenic environments make superconducting computing possible by reducing thermal noise, electrical resistance and heat dissipation. Heat generated by the electronics and thermal conductivity of electrical transmission lines to the outside world constitute two main sources of thermal load in such systems. As a result, higher data rates require additional transmission lines which come at an increasingly higher cooling power cost. Hybrid or monolithic integration of silicon photonics with the electronics can be the key to higher data rates and lower power costs in these systems. We present a 4-channel wavelength division multiplexing photonic integrated circuit (PIC) built from modulators in the AIM Photonics process development kit (PDK) that operate at 25 Gbps at room temperature and 10 Gbps at 40 K. We further demonstrate 2-channel operation for 20 Gbps aggregate data rate at 40 K using two different modulators/wavelengths, with the potential for higher aggregate bit rates by utilizing additional channels.

42 ENGINEERING↗

Supporting Resource Adequacy via the ReEDS-India Model [Slides]

ReEDS-India is an open-access tool for mid- and long-term capacity expansion modeling that finds the mix of generation, transmission, and storage technologies that meet the anticipated requirements of the electric sector at least cost.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Workshop Report: Rural Electric Cooperative Distributed Energy Resource Business Model Development Workshops

The United States' energy future is being shaped by decades of technology innovation, rapidly changing consumer requirements, and governmental focus on securing reliable, low-cost energy sources. With expanded electrification and increased emphasis on grid reliability coupled with the heightened complexity and risks associated with transmission infrastructure, the use of distributed energy resources (DERs) is more commonly being considered a safe, efficient, and cost-effective way to maintain grid resilience and reliability. Amidst improvements in performance, decreasing costs, and unprecedented federal policy support for DERs, electric cooperatives are considering new opportunities to use these assets to ensure secure and reliable operations for millions of customers. In light of these developments, a series of workshops were held to collaborate on the development of business models for DERs in rural electric cooperative ecosystems. The first workshop was held July 11, 2024, at the Tri-State Generation and Transmission Association Inc. headquarters in Westminster, Colorado (hereafter referred to as the "Tri-State Workshop"). The second workshop was hosted by PNGC Power on Oct. 9, 2024, in Portland, Oregon (hereafter referred to as the "PNGC Power Workshop"). These workshops convened representatives from G&Ts, distribution cooperatives,2 the energy industry, the financial community, the U.S. government, national and regional organizations, and national laboratories to share perspectives on the unique needs, challenges, and opportunities that they face as DERs are further integrated into the grid. The workshops were designed to address the following objectives: (1) develop the enabling attributes of electric cooperative DER business models, (2) explore pathways for generating community benefits from these assets, and (3) identify technical challenges and market risks for DERs in rural electric cooperative service territories. This report outlines key findings and major themes identified by workshop participants that federal agencies, G&Ts, distribution cooperatives, and other entities can consider to advance electric cooperative DER business models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy, Utility Scale: 30 Proven Strategies to Increase VPP Enrollment [Slides]

After decades of low or declining growth in electricity demand, the U.S. now faces a significant near-term need for new generation capacity and transmission and distribution infrastructure. Virtual Power Plants (VPPs) can meet a large portion of the gap between electricity supply and growing demand, but only if deployed at an increased scale. This study provides 30 proven strategies for scaling VPPs through increased enrollment based on in-depth interviews with utilities and VPP solutions providers that have achieved considerable scale or rapid growth in program deployment. The study includes specific actions for regulators, utilities, and VPP solutions providers to increase VPP enrollment and deliver important customer and utility benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data for "Implications of Zoning Ordinances for Rural Utility-Scale Solar Deployment and Power System Decarbonization in the Great Lakes Region".

This dataset includes the Energy Zoning Database and geographic shapefiles used to identify suitable rural areas for utility-scale solar development. Additionally, it contains the input data required for the capacity expansion model, including information on existing electric generators and their associated costs, solar resource potential, and transmission infrastructure data. These datasets collectively support the analysis presented in the paper, ensuring a comprehensive assessment of zoning regulations, land suitability, and the economic and technical feasibility of solar deployment in rural areas.

Owusu-Obeng, Papa Yaw (ORCID:0000000334385183)↗

Power System Operational Impacts of Electric Vehicle Dynamic Wireless Charging

The electrification of the transportation sector poses an opportunity for reducing greenhouse gas (GHG) emissions from passenger vehicles. Electric vehicle (EV) charging through dynamic wireless power transfer (DWPT), known as roadway electrification, could shift EV demand profiles to better coincide with renewable electricity generation. However, this would be a very large new load and few studies evaluate the regional impacts of DWPT charging in a power transmission system. This paper defines methods that address dataset generation for passenger vehicle trips and models to evaluate regional impacts for this emerging technology. Household vehicle miles traveled (VMT) data form localized EV demand profiles through discrete-event simulation. This data serves as exogenous inputs for a Production Cost Model (PCM) of a synthetic transmission system based on the Electric Reliability Council of Texas's (ERCOT) network. EV charging methods are compared for both a 2018 baseline generation mixture and a high-renewable generation case incorporating 20 GW of installed solar photovoltaic (PV) capacity. The PCM employs unit commitment and economic dispatch (UC&ED) models to compare financial, environmental, and grid reliability impacts from EV charging across passenger EV adoption levels. In-transit charging could reduce grid operational costs by as much as 1.49%, with up to $13.7B saved in annual vehicle operational costs for consumers compared to gas-powered vehicles. Health impacts analysis from power plant and vehicle tailpipe emissions from this study show net health benefits increase by 40% for in-transit charging coupled with high renewable generation. Renewable resources provide an avenue for cost-effective in-transit charging with reduced emissions. The combination of dataset generation and open-source power system modeling establish a foundation for the holistic evaluation of regional DWPT impacts.

dynamic wireless power transfer↗

Regulatory and Technical Challenges and Barriers to Adoption of Distributed Wind Energy in Agricultural Settings

Distributed wind (DW) energy development can benefit agricultural landowners through the possibility of improved resilience of electrical service from onsite generation and associated economic benefits. DW development currently faces technical and regulatory challenges related to interconnection of projects with distribution or transmission equipment on the main electrical grid. A review was conducted of barriers to adoption for agricultural DW projects and potential roles of various stakeholders in addressing them. One major barrier is that the unique characteristics of wind energy generation such as its variability and intermittency, may require upgrades for the whole power line, which can lead to prohibitive cost burdens on individual interconnection customers. Another barrier is compliance with federal, state, or utility-level regulations that require technology-agnostic, industry-standard equipment that is often not technically realistic for DW projects. DW developers, grid infrastructure owner-operators, regulators, and standards publishers can work together to address these challenges and facilitate DW development.

17 WIND ENERGY↗

Commercial and Industrial Energy Procurement in Nigeria: A Consumer's Guidebook

Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Design Process for Networked Microgrids

Changes in economic, technology, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, and the potential to integrate electricity generation with other municipal functions. When grid-connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via networks of microgrids. While the design process for a single stand-alone microgrid is relatively well understood, the process of designing the infrastructure for networked microgrid operations has not been well studied. Because of the wide range of potential operational goals for microgrids, it is typical to follow the engineering process of developing an initial conceptual design, a preliminary design, a detailed design, and then a final as-built design. The conceptual design is typically completed without detailed engineering analysis, and the preliminary design is the first stage that requires it. This paper presents a process for developing the preliminary design for networked microgrids, which can then be used as a basis for the final as-built design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mapping Critical Vulnerabilities in Natural Gas Pipeline Systems through Network Centrality and GIS Analytics

Natural gas plays a central role in the US energy landscape, providing 43% of electricity generation in 2023. Its exclusive recovery ability on pipelines for transmission underscores the importance of understanding the disruption recovery ability of this infrastructure. This study employs a network-based analytical framework integrating geographic information systems (GIS) with multiple centrality measures—betweenness, closeness, degree, and eigenvector—to pinpoint key segments and evaluate the structural robustness of the national pipeline network. Pipelines are grouped by System ID and Operator ID to capture variations across organizational and physical structures. The analysis reveals uneven patterns of network influence, where certain pipelines function as critical connectors or dominant hubs. Spatial mapping highlights geographic dependencies and potential chokepoints, offering a clear view of where targeted risk prevention measures would be most effective. The findings provide practical guidance for prioritizing maintenance, enhancing system robustness, and mitigating risks to ensure a stable and secure energy supply. Future research will expand the framework to incorporate dynamic operational data and real-time network behavior.

Peterson, Steven [ORNL] (ORCID:0000000287672998)↗