Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric boilers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Tides on South Mill Apartment Complex

This dataset includes data from the building management system for a large multi-family rental property located in Tempe, Arizona. The name of this rental property is “Tides on South Mill” and it is owned by the FCP which is a real-estate investment company based in Maryland with a large portfolio of rental properties that spreads out throughout the U.S. FCP’s portfolio includes large multi-family housing and commercial buildings. The property is split into four quadrants. Each quadrant has roughly 130 apartments. The total floor area of each Quadrant is about 94,000 sq. ft. The campus of Solara spreads over 27 acres. The mechanical system consists of a 2-pipe system that runs chilled or hot water thru individual Fan Coil Units depending upon the season. The gas-fired boiler will supply hot water when seasonal change-over will take place. This dataset spans October to December 2021 and includes time-series measurements corresponding electricity meter data (Cooling Tower Fan, Pumps, Chillers,) with 1-minute resolution, chilled water temperature data and outside air data with 5-minute resolution etc. as CSV files. In addition to the measurements, a metadata .json file, and a .pdf dataset description file are also included.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy impact of heating electrification in mid-rise multifamily buildings in mixed-humid climates

Decarbonizing the electric grid in conjunction with electrifying residential heating is a critical step to combat climate change. Heating in multifamily buildings with the existing natural gas-fired central boiler is a complex process that not only leads to overheating in some apartment units but also results in energy waste and high gas bills. In this study, we consider a multifamily building in New York City, USA, to evaluate the performance of five different heating systems, which represent a step-by-step transition from the conventional to a fully electrified heating system, and determine their impact on the site energy consumption and source CO 2 emissions. Results indicate that overheating in a multifamily building can raise the indoor temperature by as much as 8°C above comfortable limits. Transitioning from conventional steam radiators to cold climate heat pumps can reduce annual site heating energy by up to 70% and source CO 2 emissions by up to 21%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Boiler Health Monitoring Using a Hybrid First Principles-Artificial Intelligence Model

Due to increased penetration of the intermittent renewables to the grid, pulverized coal (PC) plants are being forced to cycle their load frequently and rapidly, operate at low load condition for sustained period, and start up and shut down several hundred times in a year in the worst case. These severe operations are causing substantial damage to the boiler components compromising the reliability of PC plants. An online health monitoring tool can be instrumental in understanding the impacts of load-following and can eventually help PC plants to develop advanced process control strategies for improved flexibility without compromising safety nor reliability.

20 FOSSIL-FUELED POWER PLANTS↗

End-Use Savings Shapes Upgrade Package Documentation: LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Light Emitting Diode (LED) Lighting, Heat Pump Rooftop Unit (RTU) (HP-RTU), and Air-Source Heat Pump (ASHP) Boiler, which we will refer to collectively as the "Interior Lighting and Heat Pump" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic Life Cycle Assessment for Evaluating the Global Warming Potential of Geothermal Energy Production Using Inactive Oil and Gas Wells for District Heating in Tuttle, Oklahoma

Repurposing abandoned oil and gas infrastructure for geothermal energy production has great potential to reduce greenhouse gas (GHG) emissions. This study quantified the life cycle global warming potential of geothermal energy production using four inactive oil and gas wells repurposed for district heating in Tuttle, Oklahoma. A cradle-to-grave prospective life cycle assessment was performed to compare GHG emissions between the geothermal district heating system and conventional natural gas-fired heating system from 2020 to 2050. For initial implementation of the geothermal system, we investigated two approaches: 1) repurposing abandoned infrastructure from a nearby oil and gas well site, and 2) production and injection well drillings including new construction of a central heat exchange station. Environmental impacts from the geothermal system were estimated for five scenarios where a natural gas peaking boiler is incorporated to supply peak heat demand. The prospective results indicated that cumulative reduction in GHG emissions from transitioning to the geothermal district heating system increase over time as a function of future renewable resource penetration and technological advancements within electricity, fuel, and steel production. Over 30 years, the global warming potential associated with the district heating demand will have been reduced by up to 24 % with the repurposed system. These results imply that repurposing existing oil and gas infrastructure for geothermal energy systems of district heating will bring future climate benefits.

abandoned oil and gas wells↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

The Co-Firing of Pine Biomass and Waste Coal in 100 and 600 MW Power Plants: A Sustainable Approach to Reduce GHG Emissions

Climate change is a global issue that has gained much attention recently. Co-firing biomass with coal/waste coal reduces the electricity sector’s GHG emissions sustainably. This study uses commercial software to model waste coal and biomass co-firing in 100 MW and 600 MW power plants. The objective is to assess the effects of fluid types (subcritical and supercritical), plant capacities (100 MW and 600 MW), boiler types (pulverized coal and circulating fluidized bed boilers), biomass and waste coal co-firing ratios (0:100, 20:80, 40:60, 60:40, 80:20, and 100:0), and carbon capture and storage efficiencies (0%, 90%, 95%, and 97%) on performance parameters such as net plant efficiency, heat rate, net plant CO2 and SO2, and particulate matter emissions. The feedstocks selected for this investigation include anthracite waste coal and loblolly pine biomass. As the biomass fraction increases from 0% to 100%, co-fired power plants net efficiency increases by 3–8%. Supercritical plants had a 6% higher net plant efficiency than the subcritical plants. The study found that the biomass’s high heating value decreased the fuel flow rate and reduced plant CO2 emissions by 10–16%. With 100% biomass power plant feed and 90% carbon capture and storage efficiency, CO2 emissions drop by 83% and SO2 and PM emissions drop to zero.

Bhoi, Prakashbhai R. (ORCID:0000000333104888)↗

Enabling residential heating decarbonization through hydronic low-temperature thermal distribution using forced-air assistive devices

Space heating represents approximately one-tenth of the United States’ energy use and has a breadth of potential for emission reduction. An element of space heating, hydronic heat distribution methods, use water supply temperatures up to 82.2 °C (180 °F). However, this operating temperature can be incompatible with high-efficiency heat generation systems, which typically provide heating temperatures of up to 60 °C (140 °F). In this work, a low-cost retrofit solution is developed using experimentally validated computational tools by incorporating an airflow distributor that preferentially directs the airflow from a fan to enhance heat transfer over the finned-tube heat exchanger found in conventional baseboards. The same heat output of traditional baseboard heat distribution systems operating at higher water supply temperatures (71.1 – 82.2 °C) can also be achieved at lower temperatures (≤60 °C). Specifically, results indicate that the technology can produce more than a 46.7% improvement in the heat transfer output at temperatures as low as 60 °C (140 °F), effectively matching the same output range achieved by 71.1 – 82.2 °C (160–180 °F) water supply temperatures. An important benefit of this solution is that it utilizes the existing infrastructure as opposed to requiring the replacement of the entire distribution system. Additionally, this technology enables existing building infrastructure to be coupled with newer, high-efficiency heating systems such as condensing boilers, solar-thermal systems, and geothermal/air-to-water heat pumps that may produce lower water supply temperatures (60 °C). A geospatially resolved techno-economic and environmental analysis is completed and presented to further understand the equivalent carbon footprint of enabling higher efficiency heat generation systems with the improved efficiency heat distribution system disclosed. Using 2021 grid-average emission factors, an emission reduction of up to a 67.5% decrease (2658 kgCO 2 /yr) for a single-family home, depending on state and climate region, could be realized by replacing a traditional natural gas-fired boiler with an air-to-water heat pump coupled to the same high-temperature heat distribution system along with the low-cost retrofit solution. A complete CO 2 emission reduction of 6688 kgCO 2 /yr, depending on state and climate region, could be realized if all electricity is further renewably sourced. Thus, this study provides a possible pathway towards enabling the reduction of operational emissions in space heating.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Grid Resilient, Self-Powered, Fuel Flexible, High Efficiency Heating System (Final Report)

The Grid Independent High Efficiency System (GIHES) delivers a heating system that operates free from the power grid and provides ultra-low emissions and high efficiency heating for residential and commercial buildings. The project demonstrated two weeks of continuous grid independent operation of a storage water heater equipped with a powered damper. The Thermoelectric Generator (TEG) integrated GIHES technology revolutionizes heating systems to provide grid resilient hot water production, while delivering significant value to the end user by eliminating impacts of power interruption and enhancing comfort, convenience and productivity. The system maximizes the thermal-to-electric conversion efficiency by optimizing location and orientation of the TEGs and durability while lowering system costs. The TEGs generate enough power to charge a battery and run the storage water heater unit with a powered damper uninterrupted by providing the required parasitic electrical power for start-up, shutdown and during idling. Several TEGs were analytically and experimentally evaluated based on the size, surface area and the power being generated before designing and fabricating a complete multi-TEG assembly for integration with the water heater. The GIHES technology can be extended to boilers, furnaces and tankless water heaters and integrated with heat pump to further increase the overall equipment efficiency. The technology has the potential to reduce the amount of dispatch power and peak power plant operation. An advanced burner was designed, developed and 3D printed for fuel flexible operation. The burner was designed to enable tighter integration with TEGs for potentially higher TEG output, should this be necessary. A bench-scale test rig to perform testing of a 200,000 Btu/h burner and capable of handling up to 10% H2 (by volume) was setup at GTI’s laboratory with appropriate safety and controls to ensure smooth and safe operation. Testing of the 3D burner showed < 5 ppm NOx emissions can be achieved for the entire firing range and with different levels of hydrogen blends with natural gas. The burner will enable a more integrated TEG-burner module design for improved system performance, should this be required in the future. Techno-economic analysis (TEA) of the TEG integrated with the water heaters was performed. The testing data and the power output were used to develop the TEA. The analysis for the storage unit with damper showed that the TEG integrated system costs $95. This is much lower than a one-time charge needed to wire and install dedicated power. Discussions with TEG manufacturers and OEM’s will provide more detailed information and methods to further lower these costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation, New Windows, LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy’s ResStock™ and ComStock™ models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility enduse load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. “Measures” refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Modeling Needs to Support the Reconstruction Strategy of Ukraine

Ukraine has been facing difficult times. Russia started a full-scale invasion on February 24, 2022, and has caused huge human and infrastructure losses. As a result of the invasion, more than 8 million people left their homes. The Russian army has targeted Ukrainian energy sources, destroying or damaging over 50% of thermal power generation capacity (coal and gas), 30% of solar generation, and 90% of wind generation. The Russians are also threatening Ukrainian energy security, as they currently control the Zaporizhzhia nuclear power plant – Europe’s largest. In addition, Russia has destroyed 121,000 buildings, including 5,300 multistory buildings - more buildings than Ukraine built during the past five years. The occupiers destroyed or damaged 343 district heat boiler stations (destroyed 12 / damaged 331) and 8 CHPs (destroyed 4/ damaged 4). There is no doubt that Ukraine will be able to protect its sovereignty and restore its territorial integrity; however, this will be a long process. The Government of Ukraine needs to simultaneously focus on many issues, from waging war to the restoration of electricity, water, and heat supply in the territories close to the front line. In addition to these time-sensitive issues, the government also needs to plan a long term multi-sector strategy for the reconstruction of Ukraine’s economy. Ukraine initiated a broad-based political process for recovery at the International Ukraine Recovery Conference (URC 2022) in Lugano, Switzerland. Prior to URC 2022, Ukraine applied for EU membership on February 28 and was granted the status of candidate country by the European Council on June 23, 2022. More than 40 nations are fully committed to supporting Ukraine throughout its path from early to long-term recovery. In addition, these countries link a successful recovery to Ukraine’s European future (URC, 2022a). The reconstruction process will be long. The government also recognizes that it is not enough to build energy infrastructure back – it should be built back better. The government is committed to building a more sustainable and cleaner energy sector. Energy modeling can provide important insights into paths to decarbonize Ukraine’s economy while rebuilding it after the war. Pacific Northwest National Laboratory (PNNL) and the Institute for Economics and Forecasting of the National Academy of Sciences of Ukraine (IEF) work on modeling decarbonization scenarios in the energy sector of Ukraine. The teams focus on the heat sector, which includes district heat, autonomous and individual heating, and energy consumption by final energy consumption sectors, including buildings. Since the teams use world-class integrated assessment models, other sectors will be analyzed as well. The purpose of the document is to describe the needs of key Ukrainian ministries in modeling the reconstruction process. The scope of this document is limited to modeling energy consumption by the power and heat sectors, final energy consumption by buildings, and GHG emissions from these two sectors. The rest of this policy memo is organized as follows. After this introduction, Chapter 2 discusses key provisions of the reconstruction strategy with a focus on energy, buildings, heat supply, environment, and European integration aspirations. Section 3 provides an overview of recent developments and key decisions of the Government of Ukraine in the area of energy efficiency and decarbonization. Finally, Section 4 provides key suggestions on how PNNL and IEF can help the Government of Ukraine in developing strategic documents.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Raising the Bar in High Performance Laboratory Design

Laboratory facilities are expensive to build and operate, they consume energy at high rates compared to other types of buildings, and modifications are frequently required to accommodate ever-changing research activities. PNNL sought ways to address these issues in the design and construction of a 14,700 sq. ft. new laboratory building. To improve adaptability to change a high roof structure was used that allows raising the ceiling when needed with minimal disruption to installed HVAC and electrical utilities. Also, HVAC equipment was located on a mezzanine above the central corridor rather than above ceilings. This eliminates the need for maintenance personnel to routinely access lab spaces, reducing disruption to research staff and improving maintenance access. To improve the reliability of operations while reducing energy consumption, heat pipe heat recovery with evaporative cooling, zoned heating/cooling coils, high-efficiency condensing boilers, district cooling, VAV fume hoods, DDC controls, energy use monitoring, and implementation of the US Department of Energy’s Guiding Principles for Federal Leadership in Sustainable Buildings were all used. The energy model developed during design projected energy use at 2,840 MBtu/yr, a 13.5% savings over ASHRAE Standard 90.1-2010. The first full year of operation resulted in actual energy use of 2,661 MBtu, a savings of 19% over Standard 90.1. As a result of the project design’s demonstrated success, these strategies will be incorporated into a significantly larger (125,000 sq ft), $65 million lab facility to be constructed on the PNNL campus in 2020.

Scott, Jeffery M.↗

Manufacturing and Hydro Testing of a 10 MWe sCO2 Axial Turbine

Abstract Supercritical CO2 (sCO2) power cycles designed for thermodynamic efficiencies above 50% push component designs into pressure and temperature combinations that approach the limits of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Piping Design Codes with Turbine inlet conditions near 250 bar and 715 °C. These design conditions which limit available materials to high nickel alloys are compounded by the high fluid densities of sCO2 at these conditions which result in very compact machinery at the 10 MWe class which are currently being developed for the DOE supercritical transformational electric power (STEP) program. Design of the STEP Turbine is complete with integrated lessons learned from a previous 1 MWth subscale demonstration of a high temperature 10 MWe Turbine designed under the DOE SunShot Program. Fabrication of the STEP Turbine is nearing completion with all housings and pressure containing components in hand. This paper provides a detailed look at design intentions and limitations for the pressurized sections of the main pressure casing and the fabrication of key turbine components. Additional discussion is provided regarding postfabrication inspection and acceptance of the casing for use after issues with casing welds were identified late in the fabrication process.

Engineering↗

Process Design and Techno-Economic Analysis of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Biomass

This work describes the process design and techno-economic analysis (TEA) of the modular SPOC power plant for biomass firing and coal-biomass co-firing. Two Rankine cycles were considered: a supercritical steam cycle (242 bar, 593°C, 593°C) with 550 MWe net output and a subcritical cycle (166 bar, 566°C, 566°C) with 200 MWe net output. For both cases, 95% carbon capture was modeled, and hybrid poplar biomass was chosen to generate carbon-negative power. In addition, the supercritical 500 MWe case included a 25% biomass co-firing (carbon neutral) case. For both cycles, a 100% Powder River Basin coal firing case was used for comparison purposes. In the SPOC process, oxygen is produced via a cryogenic air separation unit (ASU) and the heat generated from the compression of air is integrated into the steam cycle and utilized for boiler feed water pre-heating. Unique to the SPOC process, the boilers are pressurized and arranged in a series-parallel configuration, with minimized flue gas recirculation. The flue gas is cooled and scrubbed in the direct-contact cooler (DCC) column, and the moisture in the flue gas is condensed, leaving the bottom of the DCC at a sufficiently high temperature such that it can be used for boiler feed water pre-heating, improving plant thermal efficiency. Following drying and purification, CO2 in the flue gas is at the purity required for storage or utilization. The performance data were obtained from process modelling via Aspen Plus®. The stream data from Aspen Plus® were used as an input for the AACE Class 5 cost study. Ultimately, the capital costs, Levelized Cost of Electricity (LCOE), and cost of CO2 captured and avoided were obtained. The HHV efficiency of the carbon negative 550 MWe supercritical SPOC case (34.8%) was clearly above those reported by NETL for the BECCS baseline cases of supercritical pulverized coal with capture (B12B, 31.5%) and the 49% biomass co-firing case with capture (PA3, 29.2%). The HHV efficiency of the carbon-negative subcritical plant is also higher than the subcritical baseline PC plant with capture (case B11B.95) presented by NETL (32% vs 29.7%). The LCOE for the SPOC 100% biomass case was similar to the LCOE for the BECCS 49% biomass with carbon capture case ($147/MWh), and the SPOC carbon neutral case LCOE was lower ($110/MWh) than the cost for the NETL baseline SC coal firing case with 90% carbon capture ($114/MWh).

Magalhaes, Duarte↗

Co-design optimization of combined heat and power-based microgrids

With the emergent need for clean and reliable energy resources, hybrid energy systems, such as the microgrid, are widely adopted in the United States. A microgrid can consist of various distributed energy resources, for instance, combined heat and power (CHP) systems. Here, the CHP module is a distributed cogeneration technology that produces electricity and recaptures heat generated as a by-product. It is an energy-efficient technology converting heat that would otherwise be wasted to valuable thermal energy. For an optimal system configuration, this study develops a novel co-design optimization framework for CHP-based cogeneration microgrids. The framework provides the stakeholder with a method to optimize investments and attain resilient operations. The proposed co-design framework has a mixed integer programming (MIP) model that outputs decisions for both plant designs and operating controls. The microgrid considered in this study contains six components: the CHP, boiler, heat recovery unit, thermal storage system, power storage system, and photovoltaic plant. After solving the MIP model, the optimal design parameters of each component can be found to minimize the total installation cost of all components in the microgrid. Furthermore, the online costs from energy production, operation, maintenance, machine startup, and disruption-induced unsatisfied loads are minimized by solving the optimal control decisions for operations. Case studies based on designing a CHP-based microgrid with empirical data are conducted. Moreover, we consider both nominal and disruptive operational scenarios to validate the performance of the proposed co-design framework in terms of a cost-effective, resilient system.

42 ENGINEERING↗