Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electrical power system simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Revolutionary Vertical Lift Technology (RVLT) Side-By-Side Hybrid Concept Vehicle Powertrain Dynamic Model

The Side-by-Side (SBS) Hybrid is one of several Revolutionary Vertical Lift Technology (RVLT) concept aircraft identified by NASA to investigate Urban Air Mobility (UAM) requirements. This paper presents a dynamic model of the SBS Hybrid powertrain built using the Toolbox for the Modeling and Analysis of Thermodynamic Systems (T-MATS) and the Electrical Modeling and Thermal Analysis Toolbox (EMTAT). The model consists of the rotors, electrical power system, and turboshaft engines connected through freewheeling clutches, gearboxes, and multiple shafts. This research effort models the complex behavior of the powertrain, including the operation of the freewheeling clutches and electrical power system at the simulation time scale of the shaft dynamics. Several simulations highlight the key features present in the model and demonstrate its operation.

powertrain↗

Rankine engine solar power generation. I - Performance and economic analysis

Results of a computer simulation of the performance of a solar flat plate collector powered electrical generation system are presented. The simulation was configured to include locations in New Mexico, North Dakota, Tennessee, and Massachusetts, and considered a water-based heat-transfer fluid collector system with storage. The collectors also powered a Rankine-cycle boiler filled with a low temperature working fluid. The generator was considered to be run only when excess solar heat and full storage would otherwise require heat purging through the collectors. All power was directed into the utility grid. The solar powered generator unit addition was found to be dependent on site location and collector area, and reduced the effective solar cost with collector areas greater than 400-670 sq m. The sites were economically ranked, best to worst: New Mexico, North Dakota, Massachusetts, and Tennessee.

Gossler, A. A.↗

Initial Review of Methods for Cascading Failure Analysis in Electric Power Transmission Systems

Large blackouts are typically caused by cascading failure propagating through a power system by means of a variety of processes. Because of the wide range of time scales, mulitple interacting processes, and the hugh number of possible interactions, the simulation and analysis of cascading blackouts is extremely complicated. This paper defines cascading failure for blackouts and gives an initial review of the current understanding, industrial tools, and the challenges and emerging methods of analysis and simulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

The Life Cycle Application of Intelligent Software Modeling for the First Materials Science Research Rack

Marshall Space Flight Center (MSFC) has been funding development of intelligent software models to benefit payload ground operations for nearly a decade. Experience gained from simulator development and real-time monitoring and control is being applied to engineering design, testing, and operation of the First Material Science Research Rack (MSRR-1). MSRR-1 is the first rack in a suite of three racks comprising the Materials Science Research Facility (MSRF) which will operate on the International Space Station (ISS). The MSRF will accommodate advanced microgravity investigations in areas such as the fields of solidification of metals and alloys, thermo-physical properties of polymers, crystal growth studies of semiconductor materials, and research in ceramics and glasses. The MSRR-1 is a joint venture between NASA and the European Space Agency (ESA) to study the behavior of different materials during high temperature processing in a low gravity environment. The planned MSRR-1 mission duration is five (5) years on-orbit and the total design life is ten (IO) years. The MSRR-1 launch is scheduled on the third Utilization Flight (UF-3) to ISS, currently in February of 2003). The objective of MSRR-1 is to provide an early capability on the ISS to conduct material science, materials technology, and space product research investigations in microgravity. It will provide a modular, multi-user facility for microgravity research in materials crystal growth and solidification. An intelligent software model of MSRR-1 is under development and will serve multiple purposes to support the engineering analysis, testing, training, and operational phases of the MSRR-1 life cycle development. The G2 real-time expert system software environment developed by Gensym Corporation was selected as the intelligent system shell for this development work based on past experience gained and the effectiveness of the programming environment. Our approach of multi- uses of the simulation model and its intuitive graphics capabilities is providing a concurrent engineering environment for rapid prototyping and development. Operational schematics of the MSRR-1 electrical, thermal control, vacuum access, and gas supply systems, and furnace inserts are represented graphically in the environment. Logic to represent first order engineering calculations is coded into the knowledge base to simulate the operational behavior of the MSRR-1 systems. An example of engineering data provided includes electrical currents, voltages, operational power, temperatures, thermal fluid flow rates. pressures, and component status indications. These type of data are calculated and displayed at appropriate instrumentation points, and the schematics are animated to reflect the simulated operational status of the MSRR-1. The software control functions are also simulated to represent appropriate operational behavior based on automated control and response to commands received by the crew or ground controllers. The first benefit of this simulation environment is being realized in the high fidelity engineering analysis results from the electrical power system G2 model. Secondly, the MSRR-1 simulation model will be embedded with a hardware mock-up of the MSRR-1 to provide crew training on MSRR-1 integrated payload operations. G2 gateway code will output the simulated instrumentation values, termed as telemetry, in a flight-like data stream so that the crew has realistic and accurate simulated MSRR-1 data on the flight displays which will be designed for crew use. The simulation will also respond appropriately to crew or ground initiated commands, which will be part of normal facility operations. A third use of the G2 model is being planned; the MSRR-1 simulation will be integrated with additional software code as part of the test configuration of the primary onboard computer, or Master Controller, for MSRR-1. We will take advantage of the G2 capability to simulate the flight like data stream to test flight software responses and behavior. A fourth use of the G2 model will be to train the Ground Support Personnel that will monitor the MSRR-1 systems and payloads while they are operating aboard the ISS. The intuitive, schematic based environment will provide an excellent foundation for personnel to understand the integrated configuration and operation of the MSRR-1, and the anticipated telemetry feedback based on operational modes of the equipment. Expert monitoring features will be enhanced to provide a smart monitoring environment for the operators. These features include: (1) Animated, intuitive schematic-based displays which reflect telemetry values, (1) Real-time plotting of simulated or incoming sensor values, (3) High/Low exception monitoring for analog data, (4) Expected state monitoring for discrete data, (5) Data trending, (6) Automated malfunction procedure execution to diagnose problems, (7) Look ahead capability to planned MSRR-1 activities in the onboard timeline. And finally, the logic to calculate telemetry values will be deactivated, and the same environment will interface to the incoming data for the real-time telemetry stream to schematically represent the onboard hardware configuration. G2 will be the foundation for the real-time monitoring and control environment. In summary, our MSRR-1 simulation model spans many elements of the life cycle development of this project: Engineering Analysis, Test and Checkout, Training of Crew and Ground Personnel, and Real-time monitoring and control. By utilizing the unique features afforded by an expert system development environment, we have been able to synergize a powerful tool capable of addressing our project needs at every phase of project development.

Rice, Amanda↗

Air Conditioning Stall Phenomenon Testing, Model Development, and Simulation

Electric distribution systems are experiencing power quality issues of extended reduced voltage due to fault-induced delayed voltage recovery (FIDVR). FIDVR occurs in part because modern air conditioner (A/C) and heat pump compressor motors are much more susceptible to stalling during a voltage sag or dip such as a sub-transmission fault. They are more susceptible than older A/C compressor motors due to the low inertia of these newer and more energy efficient motors. There is a concern that these local reduced voltage events on the distribution system will become more frequent and prevalent and will combine over larger areas and challenge transmission system voltage and ultimately power grid reliability. The Distributed Energy Communications and Controls (DECC) Laboratory at Oak Ridge National Laboratory (ORNL) has been employed to (1) test, (2) characterize and (3) model the A/C stall phenomenon.

air conditioning stall↗

Grand Challenges in Modeling, Simulation and Analysis: Extraction and Visualization of Power Systems

Threats to the national electric power grid often require the coupling of real-time state data with look-ahead or forecasting models to provide timely disruption warnings. However, successful accomplishment of this capability presents a grand challenge in modeling, simulation, and analysis. Analysis of inter-area oscillatory modes may provide a new path to anticipate power system stability and address this grand challenge. An algorithm is presented for the identification and analysis of such modes from high resolution phasor measurement data that might indicate a pathway to meet this grand challenge. The process outlined includes data collection, conditioning, extraction of the primary oscillatory frequency, and determination of participating areas of the system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Managed Charging: Forward-Looking Estimates of Bulk Power System Value

When and where electric vehicle charging occurs has significant implications for power systems supporting widespread electric vehicle deployment with high shares of wind and solar generation. Numerous studies have estimated the value of scheduling or otherwise managing electric vehicle charging in such power systems. This study improves on those earlier works by leveraging detailed simulation models for electric vehicle adoption, electric vehicle use, electric vehicle charging, and bulk power system operations; and linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This study closely analyzes electric vehicle managed charging (EVMC) performance along the dimensions of flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and participation rate, under the assumptions of ubiquitous chargers and all trips completed on time. The study is located in a passenger light-duty vehicle adoption scenario with 100% electric vehicle sales by 2035, and in an envisioned 2038 New England power system for which within-region generation is 84% clean.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Qualitative Description of Electric Power System Future States

This work proposes a common basis for the simulation and evaluation of transactive systems. Using existing literature, a qualitative survey of the future states of the electric power system was conducted. Forces exerting influence on the state of the power system, called “drivers,” were identified. Specific future states in the literature were identified and classified into five general groups, and the effects of twelve previously identified drivers were assessed for each individual future state in the literature. Relationships between the five general future states were defined through a Venn diagram and system evolutions were demonstrated through notional narratives and corresponding paths through the diagram. A relational measure of the complexity and extent of the change implied by each future state was also created.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of energy recovery and CO{sub 2} reduction potential in Japan through integrated waste and utility management

This paper examines the potential of integrated waste and utility power management over the mid-term planning horizon in Japan. Energy recovery and CO{sub 2} emission reduction were estimated under two situations: (1) energy recovery efforts within the current waste management/power generation framework and (2) integrated waste management with sewage treatment systems and electric power industries. Scenario simulation results showed that under the current policy framework it is not feasible to achieve large energy recovery and CO{sub 2} emission reduction, while the integrated waste management scenarios show the potential of large energy recovery which is equivalent to about an 18 million t-CO{sub 2} emission reduction. The utilization of dry wastes for power generation at existing fossil power stations is significant in achieving the result. We also consider the effects of the 'CO{sub 2} emission per GW generated' for electric power generation on the total CO{sub 2} emission reduction because it varies by country and assumptions selected. Although this research did not include an economic analysis, based on estimated CO{sub 2} emissions and energy recovery, the integrated scenarios indicate a large potential in countries that have high dependence of fossil power generation and relatively low power generation efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquire and Test IDAES Framework Components

The cooperation under the Grid Modernization Initiative and the Applied Energy Tri-Laboratory umbrellas requires mutual understanding of capabilities and a common effort to identify gaps existing in the available computational modeling and analysis tools. In this work, we report acquisition and testing of the National Energy Technology Laboratory’s Institute for the Design of Advanced Energy Systems (IDAES) framework, particularly including both electric power systems production cost model simulator Prescient as well as system optimization IDAES itself. Further, we consider the methods in which developments in Prescient and IDAES for grid-energy simulation and optimization may be included in the Framework for Optimization of ResourCes and Economics (FORCE) ecosystem that has been under collaborative development by Idaho National Laboratory, Argonne National Laboratory, and Oak Ridge National Laboratory. We propose two integration methods to introduce Prescient and IDAES into existing FORCE automated workflows. One integration involves using Prescient as a market reduced-order model and IDAES models similar to how existing Modelica models are used. The other integration involves wrapping the Prescient-IDAES dispatch optimization process with the stochastic capacity optimization workflow in FORCE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Calculating frequency at loads in simulations of electro-mechanical transients

This paper introduces a new method for calculating frequency at an electrical load in simulations of electro-mechanical transients. The method is designed for simulation studies that require accurate models of sensors such as phasor measurement units and F-Net devices, which measure frequency at locations away from generating plants. These sensors are poised to become critical components in the control systems of electrical power grids, and therefore simulation tools that incorporate accurate models of these devices are essential. The method proposed here corrects two drawbacks of using numerically computed phase angle derivatives to approximate frequency. First, it eliminates spurious spikes in frequencies calculated at loads. Second, it eliminates instabilities induced by the simulator in studies of frequency responsive loads. The proposed method is derived from a simplified model of the generators and loads in an electrical system, but in the final analysis does not depend critically on these simplifications and is therefore applicable to more sophisticated models. The method is demonstrated with the simplified model applied to the IEEE 14 and 300 bus systems.

42 ENGINEERING↗

Electrical Fault Detection, Power Quality, Distributed Energy Resource Use Cases, and Cyber Event Applications with the Cyber Grid Guard System Using Distributed Ledger Technology

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation and are associated with distributed energy resources (DERs). The integrity and confidentiality of data from IEDs is crucial, and distributed ledger technology (DLT) could improve the resilience of microgrids by helping to make these data more secure. The most popular applications using blockchain technology for electrical utilities is in the field is based on energy trading. However, the dynamism of the penetration of customer owned DERs and the deployment of sensors with IEDs have led to the identification of new applications using DLT that are focused on other areas, such as monitoring, operation and management of the grid and its assets. In addition, the majority of studies on electrical grid applications with blockchain were validated with software simulations. Although general monitoring of power systems for using DLT could be evaluated in operational electric grids, other DLT research applications such as defense against cyber-attacks and/or electrical fault detection are not likely to be performed in a real infrastructure because of possible risks to the network/equipment security. This report summarizes the application of power system applications using distributed ledger technology (DLT), providing a secure DLT framework for collecting data from IEDs like power meters and protective relays inside and outside of an electrical substation and/or between two different electrical utilities. In this study, the use case scenarios were created and assessed for different power system application by using DLT. The electrical fault detection for faulted phases (1), power quality monitoring of phase voltage magnitudes, frequency levels and load power factor (2), DERs use case monitoring (3), and cyber-event applications (4) were performed in a test bed with a Cyber-Grid Guard (CGG) system using DLT. It had a real-time simulator with power meters and protective relays in-the-loop. The first section of this report presents a literature review of power system applications using blockchain at research level. The second section shows the theory and equations used on this report. The third section shows the description of the test bed, equipment, architecture, and electrical grid diagrams. The fourth section shows the experimental models and use case scenarios that were performed for the electrical fault detection, power quality, DERs use case, and cyber event applications with the CGG system using DLT. The fifth section shows the results collected from the tests based on comparing the time stamped events of the analog signals from the IEDs, DLT computer and real time simulator. The sixth section performed the discussion of the results for the use case scenarios. Finally, section seven presents the conclusions for this report were presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Isotope heat source simulator for testing of space power systems

A reliable isotope heat source simulator was designed for use in a Brayton power system. This simulator is composed of an electrically heated tungsten wire which is wound around a boron nitride core and enclosed in a graphite jacket. Simulator testing was performed at the expected operating temperature of the Brayton power system. Endurance testing for 5012 hours was followed by cycling the simulator temperature. The integrity of this simulator was maintained throughout testing. Alumina beads served as a diffusion barrier to prevent interaction between the tungsten heater and boron nitride core. The simulator was designed to maintain a surface temperature of 1311 to 1366 K (1900 to 2000 F) with a power input of approximately 400 watts. The design concept and the materials used in the simulator make possible man different geometries. This flexibility increases its potential use.

Prok, G. M.↗