Search NASASearch

SEARCH · Search NASA

Results for “Engine Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A hingeless rotor XV-15 design integration feasibility study. Volume 1: Engineering design studies

A design integration feasibility study was carried out to investigate what modifications to the basic XV-15 were necessary to accomplish a flight demonstration of the XV-15 with a Boeing hingeless rotor. Also investigated were additional modifications which would exploit the full capability provided by the combination of the new rotor and the existing T53 engine. An evaluation of the aircraft is presented and the data indicate improved air vehicle performance, acceptable aeroelastic margins, lower noise levels and improved flying qualities compared with the XV-15 aircraft. Inspection of the rotor system data provided shows an essentially unlimited life rotor for the flight spectrum anticipated for the XV-15.

Magee, J. P.

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.

A Web Centric Architecture for Deploying Multi-Disciplinary Engineering Design Processes

There are continuous needs for engineering organizations to improve their design process. Current state of the art techniques use computational simulations to predict design performance, and optimize it through advanced design methods. These tools have been used mostly by individual engineers. This paper presents an architecture for achieving results at an organization level beyond individual level. The next set of gains in process improvement will come from improving the effective use of computers and software within a whole organization, not just for an individual. The architecture takes advantage of state of the art capabilities to produce a Web based system to carry engineering design into the future. To illustrate deployment of the architecture, a case study for implementing advanced multidisciplinary design optimization processes such as Bi-Level Integrated System Synthesis is discussed. Another example for rolling-out a design process for Design for Six Sigma is also described. Each example explains how an organization can effectively infuse engineering practice with new design methods and retain the knowledge over time.

Woyak, Scott

Automated Engineering Design (AED); An approach to automated documentation

The automated engineering design (AED) is reviewed, consisting of a high level systems programming language, a series of modular precoded subroutines, and a set of powerful software machine tools that effectively automate the production and design of new languages. AED is used primarily for development of problem and user-oriented languages. Software production phases are diagramed, and factors which inhibit effective documentation are evaluated.

Mcclure, C. W.

Computer graphics application in the engineering design integration system

The computer graphics aspect of the Engineering Design Integration (EDIN) system and its application to design problems were discussed. Three basic types of computer graphics may be used with the EDIN system for the evaluation of aerospace vehicles preliminary designs: offline graphics systems using vellum-inking or photographic processes, online graphics systems characterized by direct coupled low cost storage tube terminals with limited interactive capabilities, and a minicomputer based refresh terminal offering highly interactive capabilities. The offline line systems are characterized by high quality (resolution better than 0.254 mm) and slow turnaround (one to four days). The online systems are characterized by low cost, instant visualization of the computer results, slow line speed (300 BAUD), poor hard copy, and the early limitations on vector graphic input capabilities. The recent acquisition of the Adage 330 Graphic Display system has greatly enhanced the potential for interactive computer aided design.

Glatt, C. R.

A general-purpose optimization program for engineering design

A new general-purpose optimization program for engineering design is described. ADS (Automated Design Synthesis) is a FORTRAN program for nonlinear constrained (or unconstrained) function minimization. The optimization process is segmented into three levels: Strategy, Optimizer, and One-dimensional search. At each level, several options are available so that a total of nearly 100 possible combinations can be created. An example of available combinations is the Augmented Lagrange Multiplier method, using the BFGS variable metric unconstrained minimization together with polynomial interpolation for the one-dimensional search.

Vanderplaats, G. N.

Turbojet lift engine design for vtol transports

The pure hoverjet, utilizing separate turbojet engines for lift and cruise phases of flight, is an interesting high speed VTOL transport airplane configuration. The results of a brief analysis are presented with the intent to: (I) define the effects of some general powerplant installation and operating variables on VTOL transport performance; (2) indicate desirable turbojet lift engine design characteristics with respect to compressor pressure ratio, turbine inlet temperature, component efficiencies and thrust augmentation; and (3) examine the unique lift engine operating requirements for feasible ways of reducing engine specific weight. The figure of merit used to gauge airplane performance is airplane range.

M. J. Saari

The effect of engine design characteristics on orbital transfer vehicle performance

The objective in maximizing performance for a space-based Orbital Transfer Vehicle (OTV) is to minimize the propellant required to successfully complete a given reference mission and thereby reduce launch and storage costs. Engine sizing studies were conducted which examined the effect of engine design characteristics on the total propellant required to accomplish the manned and unmanned OTV missions anticipated for the 1995 to 2010 time period. Two propellant combinations, O2/H2 and N2O4/MMH, were selected as baselines. Exotic combinations such as F2/H2 and O2/CH4 were also studied to identify potential benefits and growth capabilities. Parametric results showing the effects of engine thrust, number of engines, nozzle area ratio and payload requirements are presented for various reference missions. The results indicate that the optimum engine size and thrust are not significantly affected by detailed engine design characteristics.

Schmidt, G. R.

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM

Engineering Design Study of Laser Power Beaming for Applications on the Moon

Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanent-ly-shadowed regions (PSR) where solar power is not available, however detailed engineering design studies of the spacecraft for such applications has not previously been undertaken. In this work, we did an engineering design study of two applications of laser power beaming for near-term lunar ap-plications. In the first application studied, an application was studied to provide power during the lunar night for a global network of small landers spread across the lunar surface, at latitudes ranging from equatorial to near polar landing sites. We analyze a proposal to power such small landers from orbit, using a laser to beam power from an orbital power station to photovoltaic arrays on the landers that are tuned to the laser wavelength. A commercially-available high-power 1.07-µ diode-pumped fiber laser was chosen as the source. To minimize beam spread of the a spot at the required distance, a 1.5 meter optical element was provided, using a design based on the Kepler telescope. To provide power to landers at any location, three orbital stations (“beamcraft) are required, each carrying a 3-kW laser. (If the surface science platforms requiring power are only in polar locations, or converse-ly, only in near equatorial locations, only one orbital platform is needed.) The approach is seen to be feasible, and a systems analysis was completed, the concept of operations for the system out-lined and a design for the beamcraft put together. The second design study looked at surface-to-surface power beaming using the VSAT as the la-ser platform, for an application to provide power to the interior of a permanently shadowed lunar crater from a surface platform. To maximize the distance of beaming, taking into account possible surface irregularities and the short distance to the horizon of the moon, it is desirable to emplace the laser at an elevation above the surface. The Vertical Solar Array Technology (VSAT) is a NASA program developing a solar array mounted vertically on a 10-m tall mast, designed for emplacement on a Commercial Lunar Payload Services (CLPS) lander to provide 10-kW (BOL) power near the south polar region of the moon, with a target readiness date of 2028. We used this design as the starting platform and the power source for a laser power beaming station. By mounting the laser beam director at the top of the solar array mast, a viewing distance to power receivers up to 10 km is possible. Requirements for the system were to be able to provide 300 W of continuous usable power to users including CLPS landers, VIPER class rovers, or the proposed Lunar Terrain Vehicle. The specified requirement was to be able to transmit power to a distance of up to 10 km, over a design lifetime of 5 years, and fitting within a total system landed mass under 625 kg. Again, a 1.07-µ fiber laser is mounted on the deck of the lander, with laser output sent to the laser beam director by a fiber-optic cable. A 7 square meter deployable radiator keeps the laser within operating temperature limits. The beam director is based on the design of a prototype unit developed by the University of California Santa Barbara. The system beams power for 57% of the time, with 44% of the time idle (accounting for the time when the VSAT array is itself in shadow). 1595 Watts of optical power are output in the beam. Accounting for receiver efficiency and beam losses, this results in an output onto the 1.5-meter receiving photovoltaic array of 542 watts. Of this, 300 watts is directly available to the user, while 242 watts is directed to the batteries for use while the beam is not available.

laser power

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

Source record

A simple method of calculating Stirling engines for engine design optimization

A calculation method is presented for a rhombic drive Stirling engine with a tubular heater and cooler and a screen type regenerator. Generally the equations presented describe power generation and consumption and heat losses. It is the simplest type of analysis that takes into account the conflicting requirements inherent in Stirling engine design. The method itemizes the power and heat losses for intelligent engine optimization. The results of engine analysis of the GPU-3 Stirling engine are compared with more complicated engine analysis and with engine measurements.

Martini, W. R.

Model-Based Engineering Design for Trade Space Exploration throughout the Design Cycle

This paper presents ongoing work to standardize model-based system engineering as a complement to point design development in the conceptual design phase of deep space missions. It summarizes two first steps towards practical application of this capability within the framework of concurrent engineering design teams and their customers. The first step is standard generation of system sensitivities models as the output of concurrent engineering design sessions, representing the local trade space around a point design. A review of the chosen model development process, and the results of three case study examples, demonstrate that a simple update to the concurrent engineering design process can easily capture sensitivities to key requirements. It can serve as a valuable tool to analyze design drivers and uncover breakpoints in the design. The second step is development of rough-order- of-magnitude, broad-range-of-validity design models for rapid exploration of the trade space, before selection of a point design. At least one case study demonstrated the feasibility to generate such models in a concurrent engineering session. The experiment indicated that such a capability could yield valid system-level conclusions for a trade space composed of understood elements. Ongoing efforts are assessing the practicality of developing end-to-end system-level design models for use before even convening the first concurrent engineering session, starting with modeling an end-to-end Mars architecture.

models