Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

GUI Control System for the Mu2e Electrostatic Septum High Voltage at Fermilab

The Mu2e Experiment has stringent beam structure requirements; namely, its proton bunches with a time structure of 1.7 $\mu$s in the Fermilab Delivery Ring. This beam structure will be delivered using the Fermilab 8-GeV Booster, the 8-GeV Recycler Ring, and the Delivery Ring. The 1.7-$\mu$s period of the Delivery Ring will generate the required beam structure by means of a third order resonant extraction system operating on a single circulating bunch. The electrostatic septum (ESS) for this system is particularly challenging, requiring mechanical precision in a ultra high vacuum of 1 x 10$^-8$ Torr to generate 100 kV across 15 mm. This paper describes a graphical user interface that has been developed to automate the conditioning and commissioning process for the electrostatic septa. It is based on an interface to the Fermilab ACNET system using the ACSys Python Data Pool Manager (DPM) Client produced and maintained by Fermilab Accelerator Controls. Network interfacing between data pool managers made by the application and ACNET devices introduce an inherent (approximately 1 s) latency in throughput of the readouts. This delay is utilized to process and graph incoming data events of devices crucial to conditioning of a electrostatic septum (ESS). 'Ramping' and 'Monitoring' modes adjust settings of the power supply based on internal logic to efficaciously increase and maintain the high voltage (HV) in the ESS, easing the voltage setting on incidence of sparking or other possibly damaging events. A timestamped log file is produced as the application runs.

43 PARTICLE ACCELERATORS↗

Fermilab Report - Fermi National Accelerator Laboratory Monthly Report, June 1979

Fermilab is engaged in several new ventures building for the future of the Laboratory and for excursions into new energy ranges. At the same time, it should be remembered that Fermilab also carries out a vigorous program of particle physics at 400 GeV, or thereabouts, with experimenters from a host of different institutions and a number of different countries. This program, which will be the backbone of Fermilab until the era of TeV physics begins, depends completely on reliable operation of the Fermilab accelerator at the intensities and in the modes needed for experiments. There has not been a review of accelerator operation in these pages since August, 1976, and it seems appropriate to discuss the progress of the accelerator.

Cole, F. T.↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign, an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real-time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB650 CM.

Yoon, S. [Fermilab]↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB 650 CM.

Yoon, S. [Fermilab]↗

White-Rabbit-Disciplined FPGA Readout for Fermilab Timing Events

Fermilab's accelerator timing links broadcast short event codes to thousands of devices at once, but the links themselves carry no absolute notion of time; that comes separately from a White Rabbit reference. This work builds the piece that ties the two together on a single board. On a Xilinx Kria KR260 (Zynq UltraScale+), the programmable logic decodes a real Fermilab TCLK link, stamps every event with an absolute White-Rabbit \{sec, ns\} UTC time, and reads the timestamped stream out over AXI4-Lite; a thin Linux process on the same die publishes each event into a Redis stream on the control network. To exercise the full chain on one board, the decoded events are re-encoded as gigabit ACLK, transmitted out an SFP+ optical port, looped back over a short fiber jumper, and decoded again on the same timeline, and are additionally mirrored as an ACLK-Lite Manchester waveform for benchtop probing. Across sustained, multi-day testing against real Fermilab TCLK, the pipeline has decoded, timestamped, and published hundreds of millions of events with practically zero loss, and folding the timestamped stream on the 60-second accelerator supercycle recovers the machine's periodic structure directly from the published data.

Rossel, Jacob [Fermilab; UC, Berkeley (main)] (ORC↗

A Single-Board Fermilab Timing Pipeline on the Xilinx KR260: Decode, Timestamp, Publish, Mirror

Full-width abstract \renewcommand{\maketitlehookd}{% \begin{abstract} \noindent Fermilab's accelerator timing links broadcast short event codes to thousands of devices at once, but the links themselves carry no absolute notion of time; that comes separately from a White Rabbit reference. This work builds the piece that ties the two together on a single board. On a Xilinx Kria KR260 (Zynq UltraScale+), the programmable logic decodes a real Fermilab TCLK link, stamps every event with an absolute White-Rabbit \{sec, ns\} UTC time, and reads the timestamped stream out over AXI4-Lite; a thin Linux process on the same die publishes each event into a Redis stream on the control network. To exercise the full chain on one board, the decoded events are re-encoded as gigabit ACLK, transmitted out an SFP+ optical port, looped back over a short fiber jumper, and decoded again on the same timeline, and are additionally mirrored as an ACLK-Lite Manchester waveform for benchtop probing. Across sustained, multi-day testing against real Fermilab TCLK, the pipeline has decoded, timestamped, and published hundreds of millions of events with practically zero loss, and folding the timestamped stream on the 60-second accelerator supercycle recovers the machine's periodic structure directly from the published data.

Rossel, Jacob [UC, Berkeley; Fermilab] (ORCID:0009↗

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab R. Doubnik1, M. Adamowski1, F. de M. Blaszczyk1, A. Hahn1, D. Montanari1, R. Mrowca1, Z. West1, C. Adriano2, T. P.M. Alegre2, D. Correia2, A. A. B. Machado2, E. Segreto2, R. G. Gonçalves3, E. M. Assaf6, J. M. Assaf3, D. Cardoso3, M. B. Fontes4, H. Da Motta4, D. Noriler5, P. J. G. Pagliuso2. 1 Fermi National Accelerator Laboratory, PO Box 500, Batavia IL 60510, United States. 2 “Gleb Wataghin” Institute of Physics, UNICAMP, Campinas-SP, 13083-859, Brazil. 3 CPqMAE - Research Center on Advanced Materials and Energy, Federal University of São Carlos (UFSCar), São Carlos, 13565-905, Brazil. 4 The Brazilian Center for Research in Physics (CBPF), Rio de Janeiro-RJ, 22290-180, Brazil. 5 School of Chemical Engineering, UNICAMP, Campinas-SP, 13083-859, Brazil. 6 São Carlos Institute of Chemistry, University of São Paulo, São Carlos-SP, 13566-590, Brazil. Email: rdoubnik@fnal.gov Abstract. The Long-Baseline Neutrino Facility (LBNF) located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, hosts the Deep Underground Neutrino Experiment (DUNE). This experiment employs cryostats containing nearly 70,000 metric tons of high-purity liquid argon (LAr). Ensuring LAr purity is critical for achieving the required electron lifetime, which directly impacts the experiment’s signal-to-noise ratio. The Horizontal Drift (HD) detector demands an electron lifetime exceeding 3 ms within its 3.5 m drift, equivalent to less than 100 parts-per-trillion (ppt) Oxygen contamination, while the Vertical Drift (VD) detector requires over 6 ms electron lifetime within its 6.0 m drift, corresponding to less than 50 ppt Oxygen contamination. To mitigate Nitrogen (N2) quenching of scintillation light, N2 contamination must remain below 1 ppm, as higher levels can result in up to a 20 % loss of light. The Brazil State University of Campinas (UNICAMP) significantly contributes to LBNF FDC through the development of argon purification and regeneration systems for HD and VD cryostats. UNICAMP designed and constructed the Purification Liquid Argon Cryostat (PuLArC), a small-scale test facility holding approximately 90 liters of LAr. Tests using PuLArC demonstrated that 1.2 kg of Li-FAU zeolite could reduce N₂ contamination from 20-50 ppm to 0.1-1.0 ppm within 1-2 hours. Tests at Fermilab’s Iceberg cryostat (2,596 liters) confirmed scalability, with 3 kg of Li-FAU reducing N₂ contamination from ~5 ppm to <1 ppm over 96 hours cycles without active circulation. This presentation will detail the research methods, test setups, and results, showcasing the potential of Li-FAU as an alternative to Molecular Sieve 4A for large-scale LAr systems. This advancement enhances DUNE's precision and demonstrates the impact of international collaboration on cryogenic research.

Doubnik, Roza [Fermilab]↗

Contextual modeling and Bayesian Optimization for Improved Injection at the Fermilab Booster

The Fermilab accelerator complex delivers high-intensity proton beams to serve the lab’s neutrino, muon, and fixed-target programs. A normal-conducting Linac accelerates H− beam to 400 MeV and injects into the Booster rapid cycling synchrotron via charge exchange, which accelerates protons to 8 GeV. Injection from the Linac into the Booster is a critical area for high-power performance of the Fermilab proton complex. The Booster is a high-intensity proton ring with extreme space-charge forces which necessitates precise control over the beam losses through the acceleration cycle. The main challenge for the reliability of Booster performance is compensating for drifting conditions in the beam from the Linac, which can drift daily in energy by up to O(1) MeV w.r.t. design. Drifts in Linac orbit and energy must be corrected to match the Booster, while simultaneously accommodating interdependent drifts in transverse and longitudinal beam quality. Operationally, compensation for these changes is addressed by manual tuning of the Linac output energy and/or Booster acceptance, which can be inefficient and time-consuming. This works describes contextual Bayesian Optimization for injection tuning that takes into account the state of Linac beam via information from instrumentation in the injection line (Beam position monitors (BPMs), beam loss monitors (BLMs), wire scanners for transverse profiles (WSs)), as well as RF cavity setting parameters from the Linac.

Sharankova, R. [Fermilab] (ORCID:000000027014593X)↗

Status of the data acquisition, trigger, and slow control systems of the Mu2e experiment at Fermilab

The Mu2e experiment at the Fermilab will search for a coherent neutrinoless conversion of a muon into an electron in the field of an aluminum nucleus with a sensitivity improvement by a factor of 10,000 over existing limits. In this work, the Mu2e Trigger and Data Acquisition System (TDAQ) uses otsdaq framework as the online Data Acquisition System (DAQ) solution. Developed at Fermilab, otsdaq integrates several framework components — an artdaq-based DAQ, an art-based event processing, and an EPICS-based detector control system (DCS), and provides a uniform multi-user interface to its components through a web browser. Data streams from the Mu2e tracker and calorimeter are handled by the artdaq-based DAQ and processed by a one-level software trigger implemented within the art framework. Events accepted by the trigger have their data combined, post-trigger, with the separately read out data from the Mu2e Cosmic Ray Veto system. Foundation of the Mu2e DCS, EPICS – an Experimental Physics and Industrial Control System – is an open-source platform for monitoring, controlling, alarming, and archiving. A prototype of the TDAQ and the DCS systems has been built and tested over the last three years at Fermilab’s Feynman Computing Center, and now the production system installation is underway. This work presents their status and focus on the installation plans and procedures for racks, workstations, network switches, gateway computers, DAQ hardware, slow controls implementation, and testing.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modernizing Fermilab&#x27;s Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Light Dark Matter Searches at Fermilab

Accelerator-based dark sector searches present an excellent opportunity to discover the particles that constitute cosmological dark matter in a laboratory setting. At Fermilab, an exciting program of dark sector searches is now underway across a suite of experiments using high intensity, low- and high-energy proton beamlines. Some of these searches are being carried out at neutrino experiments, which bring high luminosity sources of meson decays near large, sensitive detectors and can therefore probe a variety of dark sector models. Additionally, there have been recent studies highlighting the sensitivity of future and proposed experiments to light dark matter and other dark sector models using protons from Fermilab s new PIP-II linac, currently under construction. In this talk, I will give an overview of Fermilab s accelerator-based dark sector search program, highlight recent results, and discuss future prospects.

43 PARTICLE ACCELERATORS↗

Upgrading Fermilab s Accelerator Control System with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Cryogenic Testing of HL-LHC Q1/Q3 Cryo-Assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 Cryo-Assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-Assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressures up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvements for subsequent tests.

Rabehl, R. [Fermilab]↗

Cryogenic testing of HL-LHC Q1/Q3 cryo-assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvement for subsequent tests.

Rabehl, R. [Fermilab] (ORCID:0000000311130030)↗

HEPCloud Operations at Fermilab—The First Five Years

The HEPCloud Facility at Fermilab has now been in production operation for five years. This facility is a unified provisioning gateway to US high performance computing centers, including NERSC, OLCF, and ALCF, other large supercomputers run by the NSF, and commercial clouds. HEPCloud delivers hundreds of millions of core-hours yearly for CMS. HEPCloud also serves other Fermilab experiments including DUNE, Mu2e, Muon g-2, and NOvA. In this paper we present the practical considerations of operating a distributed facility such as HEPCloud. We also mention some of the interesting research and development that HEPCloud has been used for including GPU-based machine learning inference servers, and tests of Quantum Computing.

Timm, Steven [Fermilab]↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Design of a GammaT-Jump System for Fermilab Booster

A gammaT scheme may be required for the PIP-II era performance or ACE-MIRT era performance of the Booster. PIP-II era operations of the Fermilab proton complex will require the Fermilab Booster to increase beam intensity from 4.5e12 to 6.5e12 protons, while also increasing its ramp from 15 Hz to 20 Hz. These changes pose particular challenges for transition-crossing in the Booster, where longitudinal beam quality must be controlled in order to facilitate slip-stacking in the Recycler Ring later in the Main Injector cycle. Two novel gammaT jump schemes are proposed, termed double gammaT jump and partial gammaT jump, which optimizes the magnitude of the gammaT jump within optics and power supply constraints.

Eldred, Jeffrey Scott [Fermilab] (ORCID:0000000344↗