Time Dependence of Methane Generation Rates from Saltstone

This report documents the tests performed to address the requirements listed in the Technical Request, which resulted in a Task Technical & Quality Assurance Plan (TTQAP) and a Run Plan to obtain the required information. The research expands previous scoping work to better understand methane generation in the Saltstone Disposal Facility (SDF). That scoping work demonstrated that methane is produced when sulfide-containing material is added to methylmercury (MeHg), which is found in the SDF Tank 50 feed waste. When Tank 50 waste is combined with grout premix solids dry feed ingredients of cement, slag cement, and fly ash, sulfides are released from the slag cement component of the premix. The prior testing results showed that while the concentration of total mercury was not affected in the pH 14 waste, the MeHg likely reacted with the sulfide contained in the slag. The scoping tests were performed in sealed reactors and thus, methane generation was not measured continuously; rather, it was measured after one hour and after 24 hours. After 24 hours, a large percentage of the MeHg was converted to methane, but after 1 hour only a small percentage of methane was released. It is noteworthy that the methane generation rate (MGR) was greater at the one-hour measurement. The data compiled from the scoping work needed to be expanded to better understand the generation of methane released from grout mixed with Tank 50 waste. This expanded study developed a more extensive knowledge of how and when methane is generated to inform the Documented Safety Analysis (DSA) of the SDF. As such, employing 8 sealed reactors, the methane generation time periods were extended to 2, 4, 6, 18, 30, 48, 72, and 96 hours (4 days). Results are documented herein to determine the capacity for MeHg, contained within Tank 50 salt solution (T50SS) simulant, to produce methane when mixed with saltstone dry feed ingredients, i.e., individual components (cement, slag, and fly ash) or a combination of those components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field-Scale Lysimeter Studies of Glass and Cementitious Waste Forms at the Hanford Site - 20392

The Hanford site Integrated Disposal Facility (IDF) will receive waste forms from vitrification activities at the Hanford Waste Treatment and Immobilization Plant (WTP). The waste form inventory to be disposed of at the IDF will consist of vitrified low-activity waste (LAW) in glass forms and solidified (or encapsulated) secondary wastes in cementitious forms. The IDF is a near-surface burial facility located near Hanford's Waste Treatment and Immobilization Plant in the 200 East Area of the site's Central Plateau. An extensive set of laboratory experimental data has been collected to support IDF performance assessment calculations of the eventual degradation of waste forms and mobility of contaminants. This paper describes the start of a field experiment to generate waste-form performance data on a larger scale (tens of centimeters), over a longer duration (five years or more), and under field conditions representative of the IDF. Results from this study are expected to improve model descriptions of contaminant mobility, reduce uncertainties about the representativeness of laboratory results in the IDF performance assessment, improve stakeholder confidence in the safe disposal of treated waste at the IDF, and facilitate the adoption of informed facility designs with the potential to reduce operational costs. A lysimeter test facility near Hanford's 200 West Area has been repurposed to carry out long-term assessments of waste forms buried in sediments excavated from the IDF. The waste forms are buried in large drainage lysimeters, open caissons that are two meters in diameter and three meters deep. Waste forms are buried in up to six locations in each lysimeter. Samplers collect pore water and drainage water beneath the waste forms and air from the pore space adjacent to waste forms. Sensors measure temperature, soil water content, soil water tension, and drainage flux. One lysimeter containing cementitious waste forms and one containing glass waste forms have been completed, along with a control lysimeter (without waste forms). The cementitious waste forms are Cast Stone grout formulations using a liquid secondary waste simulant and a generic Hanford high-salt simulant, as well as a hydrated lime-based grout formulation using a liquid secondary waste simulant. Technetium-99 and iodine-127 were added as tracers to monitor contaminant mobility. Glass waste forms were fabricated in two formulations (LAWA44 and ORLEC28), with rhenium and molybdenum tracers to monitor waste form degradation. The predicted performance of the waste forms in the lysimeters was modeled prior to installation to determine waste form size, tracer concentration/activity, and locations of sensors and samplers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Early age hydration and application of blended magnesium potassium phosphate cements for reduced corrosion of reactive metals

Highlights: • Magnesium potassium phosphate cements were studied for nuclear waste encapsulation. • The optimised formulation in this study was determined to be 0.24 w/s ratio. • Different reaction kinetics were discovered for the FA/MKPC and BFS/MKPC binders. • Struvite-K was the only crystalline reaction product observed via in-situ SXPD. • Uranium trials revealed MKPC corrosion was reduced compared to a UK nuclear grout. Magnesium potassium phosphate cements (MKPC) were investigated to determine their efficacy towards retardation of reactive uranium metal corrosion. Optimised low-water content, fly ash (FA) and blast furnace slag (BFS) blended MKPC formulations were developed and their fluidity, hydration behaviour, strength and phase assemblage investigated. In-situ time resolved synchrotron powder X-ray diffraction was used to detail the early age (~60 h) phase assemblage development and hydration kinetics, where the inclusion of BFS was observed to delay the formation of struvite-K by ~14 h compared to FA addition (~2 h). All samples set within this period, suggesting the possible formation of a poorly crystalline binding phase prior to struvite-K crystallisation. Long-term corrosion trials using metallic uranium indicated that MKPC systems are capable of limiting uranium corrosion rates (reduced by half), when compared to a UK nuclear industry grout, which highlights their potential application radioactive waste immobilisation.

36 MATERIALS SCIENCE↗

Using Radioiodine Speciation to Address Environmental Remediation and Waste Stream Sequestration Problems at the Fukushima Daiichi Nuclear Power Plant and a DOE Site

Iodine-129 ( 129 I), with a half-life of half-life of 16 million years, is commonly considered the single greatest risk driver in high-level and low-level nuclear repositories. This risk stems from several basic properties of 129 I, and under many geochemical conditions, it can move as an anion at nearly the rate of water through the subsurface environment. 129 I is also extremely radiologically toxic because over 90% of body burden accumulates in the thyroid, which weighs only about 14g in an adult. There is also a large worldwide inventory of radioiodine as a result of its high fission yield and this inventory is rapidly increasing as a result of nuclear energy production. Radioiodine is produced at a rate of 40 GBq (1 Ci) per gigawatt of electricity produced by nuclear power. To illustrate how the properties of 129 I magnify its risk, 129 I accounts for only 0.00002% of the radiation released from the Savannah River Site in Aiken, South Carolina, but contributes 13% of the population dose, a six orders of magnitude magnification of risk with respect to its radioactivity. The currently favored solid phase for LLW immobilization is cement, while HLW immobilization is the incorporation of waste into glass (vitrification). However, so far, the incorporation into cement and subsequent leaching of only iodide has been seriously investigated. The major problem with this approach is that it ignores the complex speciation of iodine, i.e., it ignores iodate and organo-iodine which have different chemistries. Most of the past research was devoted to the mechanism of iodide uptake in cement hydrate phases that is sorption and/or incorporation. Very few data exist on iodate and organo-iodine incorporation in cement, even though large quantities of liquid waste containing also radioiodine have already been solidified in cement Iodine-129 from low-level waste is commonly disposed of in cementitious materials. Grout, a dense cementitious fluid, mixed with a reducing slag, is often used to immobilize radionuclides. However, the reducing environment might not be conducive to immobilize iodine. For example, the silver based immobilization technologies (e.g., AgCl, Ag-impregnated granular activated carbon, Ag-mordenite) remove iodine from the aqueous phase by promoting the formation of Ag-iodide precipitates. The solubility of AgI is eight orders of magnitude lower than it is for AgIO 3 . Similarly, coprecipitation of iodine into calcium carbonate phases occurs only with IO 3 - and not with I - and org-I. If one would want to immobilize iodine more effectively, different engineering approaches would need to be used to promote binding of I - , IO 3 - , or organo-I. Using laboratory experiments with grout, slag, and silver-based adsorbents, and GC-MS and I K-edge XANES and EXAFS and C K-edge XANES spectroscopy for identifying iodine speciation, the major problems with these methods have been identified as focused too much on just one of the iodine species for immobilization, while others, especially organo-I, remained mobile. Finally, we established that most of the adsorbents that are used contain sufficient amounts of organic matter to create organo-I . It is anticipated that increased attention directed at understanding and quantifying the speciation of radioiodine, as opposed to simply total radioiodine, will lead to improved remediation results to be used for long-term radioiodine disposal in cementitious waste forms.

129-Iodine↗

Solidification of REDC Organics and Airborne Release Fraction Measurements

The Radiochemical Engineering Development Center (REDC) generates various liquid organic wastes from processing irradiated targets to recover heavy elements. In the past, these organics were discharged to the Oak Ridge National Laboratory (ORNL) liquid low-level waste (LLLW) system, along with the aqueous waste. Because of a reduction in aqueous LLLW from other ORNL generators and an increase in the radionuclide concentration, particularly 238 Pu, in the organic waste stream, the organics can no longer be discharged to the LLLW system. The plan is to solidify the liquid organic waste for disposal as solid debris waste. The documented safety analysis for REDC uses an airborne release fraction of 5 x 10 -4 with a respirable fraction of 0.2 for plutonium and other actinides from packaged solid debris waste during a fire scenario, for an overall airborne release fraction/respirable fraction of 10 -4 . Solidifying the organic liquids, either by using PM-199 Organoclay ® or by grouting, would produce solid waste forms with no free liquid, which should qualify for disposal at the Waste Isolation Pilot Plant. The use of Organoclay would be much simpler to implement inside a hot cell. Granular Organoclay can be added to the organic waste solutions until there is a dry layer on top of the liquid and then allowed to cure for a few hours. Grouting the liquids would require using multiple ingredients and mixing steps. Both methods produced waste forms that trapped cerium, as a surrogate for plutonium, inside the waste, with airborne release fractions during fire scenario tests of well below the 10 -4 limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blast furnace slag reactions in various solutions (Interim Report)

Blast furnace slag (BPS) is a critical component of grout formulations for the remediation of low activity nuclear waste. This interim report describes the initial results of a study designed to investigate the fundamental mechanisms of BPS dissolution. The goal of the work is to delineate the physicochemical aspects of the slag that impart beneficial properties to grout formulations to enable the consistent production of a slag-replacement material (“designer slag”) that performs better than what is commercially available. This report documents the dissolution experiments that were conducted using nine different initial solution compositions. Solution measurements for each solution, including pH and solution composition, are given for 1, 7, 14, 28, and 56 day intervals samples. Scanning electron microscopy images are presented for the 56 day samples from each of the solutions. Inferences about reaction mechanisms and 56-day mineralogy are made based on the information collected to date. Some conclusions are made based on the work performed for this interim report, and a path forward including the strategy for making stronger conclusions based on X-ray diffraction (XRD) analyses is presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Results from New Tensor Borehole Optical Fiber Strainmeter Installations in Oklahoma and Utah

The time evolving strain field contains a wealth of information that can be used to interpret subsurface behavior. For example, injecting or removing fluids from reservoirs or aquifers causes deformation that can be used as a diagnostic signal in some cases, while it can interfere with geodetic interpretations in other cases. We've previously demonstrated the feasibility of measuring the strain tensor at a depth of 30m caused by injection into a reservoir at 530m. The observed strain signals were interpreted using four independent analytic and numerical methods that resulted in estimates of the poroelastic properties and geometry of the reservoir that was consistent with data from well logs. However, studies like these are only possible if these deformations can be reliably measured. Years of lab and field work has culminated in the development of a novel borehole strainmeter capable of resolving multiple components of strain using embedded optical fibers configured as Michelson interferometers. It features four horizontal gauges separated by 45° to resolve the horizontal strain tensor as well as a vertical strain gauge and a sixth null component for state-of-health monitoring. The downhole sensing package also includes an open pipe through its center for grout circulation during single-trip deployments and a fully welded stainless steel exterior for robustness and longevity. These instruments have a resolution of 2x10-13 strain that can easily measure the solid earth tides. Preliminary data are available from four strainmeters in shale at our Oklahoma site and four in compacted sand and gravel in Utah. These are deployed from 40-60m, except one of the strainmeters in Oklahoma is deployed at 500m. The data include strains from the initial grout curing, comparisons to predicted earth tide models and in-situ calibration results, barometric pressure admittances and spectral analyses as well as signals from underground injections and surface waves from teleseismic events. Preliminary analyses indicate behavior consistent with other strainmeter deployments, and comparison to data from a Gladwin strainmeter at the Oklahoma site validate the performance of the new design. Analyses from a suite of six well tests at the Oklahoma site show for the first time how the strain tensor field varies with location during well testing.

DeWolf, Scott↗

Development of Magnesium Oxysulfate Formulation for SRPPF Aqueous Recovery Liquid Solidification

The liquid effluent from the Savannah River Plutonium Processing Facility (SRPPF) Aqueous Recovery Processes will be solidified into a stable form that is acceptable by Waste Isolation Pilot Plant (WIPP) for disposal. The current Aqueous Recovery flow sheet proposes to solidify the liquid effluent using a grout formula that was developed and tested for the former Waste Solidification Building process. This Portland cement based mixture results in a high pH (~13) leachate from the solidified waste form which is not acceptable to WIPP in the large quantities expected from production at SRPPF. Various cementitious materials were previously evaluated as alternative grout formulations to Portland cement and a MgO-based mix was identified as a promising alternative. A magnesium oxysulfate (MOS) cement formulation comprised of reactive magnesium oxide (MgO), anhydrous magnesium sulfate (MgSO 4 ), and sand, as a non-reactive heat sink provided good mixability, similar density to the original Portland-cement based mix, and a leachate pH of 9.4, within the assumed WIPP brine pH range. However, the MOS formulation exhibited an appreciable amount of heat generation, which resulted in premature setting of a large-scale test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control Selection for the Neutralization Tank in the Aqueous Recovery System at SRPPF

• Neutralization and solidification is the last step in the Aqueous Recovery Process • All waste streams are acidic and must be neutralized before being combined with grout in a solidification drum • The neutralization tank is a 250 L, 24” diameter, 45” high tank • The batch tank is a 125 L tank • The solidification drum is a 55-gallon drum, pre-filled with grout & a sacrificial mixing paddle • Normal mass in neutralization tank: 50 g Pu • Normal mass in batch tank or drum: 25 g Pu

Dressman, Phillip M. [Savannah River Nuclear Solut↗

The EGS Collab Project – Stimulations at Two Depths

The EGS Collab project, supported by the US Department of Energy, is performing intensively monitored rock stimulation and flow tests at the 10-m scale in an underground research laboratory to address challenges in implementing enhanced geothermal systems (EGS). Data and observations from the field tests are compared to simulations to understand processes and build confidence in numerical modeling of the processes. We have completed Experiment 1 (of 3), which examined hydraulic fracturing in a well-characterized underground fractured phyllite test bed at a depth of approximately 1.5 km at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. Testbed characterization included fracture mapping, borehole acoustic and optical televiewers, full waveform sonic, conductivity, resistivity, temperature, campaign p- and s-wave investigations and electrical resistance tomography. Borehole geophysical techniques including passive seismic, continuous active source seismic monitoring, electrical resistance tomography, fiber-based distributed strain, distributed temperature, and distributed acoustic monitoring, were used to carefully monitor stimulation events and flow tests. More than a dozen stimulations and nearly one year of flow tests were performed. Quality data and detailed observations were collected and analyzed during stimulation and water flow tests using ambient temperature and chilled water. We achieved adaptive control of the tests using real-time monitoring and rapid dissemination of data and near-real-time simulation. More detailed numerical simulation was performed to answer key experimental design questions, forecast fracture propagation trajectories and extents, and analyze and evaluate results. Data are freely available from the Geothermal Data Repository. Experiment 2 examines the potential for hydraulic shearing in amphibolite at a depth of about 1.25 km at SURF. This site has a different set of stress and fracture conditions than Experiment 1. The Experiment 2 testbed consists of nine subhorizontal boreholes configured in two fans of two boreholes which surround the testbed and contain grouted-in electrical resistance tomography, seismic sensors, active seismic sources and distributed fiber sensors. A “five-spot” set of test wells that extends from a custom mined alcove includes an injection well and four production/monitoring wells. The testbed was characterized geophysically and hydrologically, and three stimulations have been performed using the Step-Rate Injection Method for Fracture In-Situ Properties (SIMFIP) tool to measure strains, and a new strain quantifying tool (downhole robotic strain analysis tool -DORSA) was deployed in a monitoring hole during stimulation. Real-time data were broadcast during stimulations to allow real-time response to arising issues.

EGS Collab, Enhanced Geothermal Systems, EGS, fiel↗

Cobalt-60, Barium-133, Cesium-137, and Europium-152 migration from cementitious sources through sediment under field conditions

Safe and effective storage of radioactive waste is essential to protect human and environmental health. Due to the potential for accidental releases and the severity of the associated risks, it is imperative to further understand radionuclide transport should an accident occur. This study was the second set of measurements conducted in 2022 of an ongoing experiment that has analyzed the vadose zone migration of radionuclides from cementitious wasteforms at the Savannah River Site over the last ten years. The radionuclides introduced within the sources are prominent constituents of radioactive waste or analogs for other groups or series of radionuclides. Lysimeters were first analyzed in 2016 using a collimated high-purity germanium gamma-ray spectrometer to non-destructively measure the concentration of each radionuclide in the sediment column as a function of depth. Following these measurements, the lysimeters were redeployed for another 4 years. All radionuclides in all lysimeters were observed to transport further during the redeployment period; however, the extent of migration varied with the material used for introduction. Except for 137Cs, migration through the sediment control system increased with decreasing ionic potential (ionic charge/radius); migration order: 152Eu<137Cs<60Co<133Ba. Overall, the cementitious wasteforms were observed to decrease radionuclide migration extent relative to natural vadose zone conditions. In both cementitious wasteforms, the migration extent increased in the order 152Eu<133Ba<60Co<137Cs. However, less migration was measured when the radionuclides were incorporated into a reducing grout wasteform. The novelty of this paper is the demonstration of a technique capable of creating non-destructive measurements over decade time scales. Ultimately, this work provides insight into the long-term migration of alkali, alkali earth, divalent transition metal, and trivalent (e.g., lanthanide and actinide element) isotopes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Unmanned Aerial Systems for Post-closure Waste Site Maintenance and Surveillance - 20143

The P- and R-Area Reactor buildings, located at SRS near Aiken, SC, were in-situ decommissioned by grouting below-grade portions of the buildings and demolishing some above-grade structures to grade level. Other reactor building structures were left above-grade and sealed to prevent human or animal access. Because the above grade-structures are expected to continue in their present state for hundreds of years, the condition of the building roofs is critical to mitigate rainwater intrusion. For this reason, building roof areas were strengthened with high strength concrete to ensure the long-term integrity of the roof structure. Periodic inspections of the roof structures are required to ensure that the roofs are functioning properly and to identify damage areas. The traditional method of inspecting closed reactor buildings requires the use of a helicopter and photographer to generate photographs and videos for review. This method proved sufficient but lacked the resolution and clarity that is required for a thorough inspection of the building structure. Fortunately, the Savannah River National Laboratory (SRNL) has established a Small Unmanned Aircraft System (sUAS) program using commercially available and custom-built remote-controlled aircraft. EC and ACP contacted the SRNL program to evaluate whether the sUAS technology could be employed for periodic reactor building inspections. The sUAS can fly within a few meters of the reactor buildings and hover, allowing for a more thorough aerial inspection. The initial sUAS inspection of the P-Area Reactor building was completed in February 2018 and at the R-Area Reactor building in August 2018 and were successful in providing higher resolution photos and videos. The sUAS inspections also revealed that vegetation had begun to grow on the roofs that could potentially damage the structure integrity. SRNL partnered with Virginia Polytechnic Institute and State University to build a custom heavy lift sUAS that could be equipped with herbicides to remotely treat the vegetative growth. Herbicides were successfully applied to the R-Area Reactor building roof using the custom sUAS in September 2018. The use of unmanned aircraft systems at SRS to perform aerial inspections and herbicide treatment in otherwise inaccessible areas has proven to be an efficient and cost-effective technology that provides high value, increases knowledge of facility conditions, and provides for early detection of damage. Periodic inspections of the reactor building roofs using sUAS technology are performed safely, efficiently, and at a significant cost and schedule savings while reducing emissions, noise, and fossil fuel use. The use of sUAS equipment for building inspections and herbicide application at SRS is unique within the DOE complex. The goal of SRS is to apply this remote technology to other waste unit operations and maintenance activities in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Processing Batches for Tank Closure Cesium Removal Through In-Tank Batch Contact Testing - 20470

The Tank Closure Cesium Removal (TCCR) process at the Savannah River Site (SRS) is currently processing waste from Tank 10H, generating decontaminated salt solution that is sent to Tank 11H. Transfers out of Tank 11H are then disposed of on site as a grout wasteform in the SRS Saltstone Processing Facility. This is a full-scale demonstration of the use of Crystalline Silicotitanate (CST) for the decontamination of aqueous nuclear waste supernate. CST primarily removes cesium from the high sodium alkaline feed, but also adsorbs strontium, actinides, and some other trace metals. The TCCR unit is an at-tank set of four ion exchange columns, with two typically being operated in series during waste processing. Tank 10H is serving a dual function as both the salt dissolution tank as well as the feed tank for the TCCR system. Prior to operation of TCCR, Tank 10H must undergo dissolution campaigns, dissolving the salt cake to form an aqueous salt solution (supernate). After each dissolution campaign, the supernate created must be qualified prior to processing through the TCCR system. Qualification includes detailed characterization of the supernate as well as in-tank batch contact tests to determine the equilibrium loading of Cs-137 on the CST ion exchange media (IONSIV{sup TM} R9120-Ba). In support of the in-tank batch contact testing, Savannah River National Laboratory (SRNL) developed a CST sample holder, also referred to as a 'tea-bag', to hold a measured amount (∼0.1 grams) of pretreated CST between stainless steel screens. The tea-bag fits within a standard stainless steel sample vial that has been modified to allow the flow of supernate to the CST. This sample holder is then immersed in the waste tank allowing free contact between the CST beads and the surrounding liquid, at an effectively infinite liquid-to-solid phase ratio. A pair of tea-bags are deployed in the tank for a period of 10 days for each batch, after which the CST is recovered, digested, and analyzed to determine the loading of cesium isotopes on the CST. This result then supports the TCCR column thermal loading limits for processing as part of the TCCR safety basis. This paper will discuss the design and testing of the CST sample holder, as well as results from the first few batches of waste qualified and subsequently processed through the TCCR system. In addition, results from analyses of Tank 11H samples, showing decontamination of the product will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗