Search NASA⌕ Search

SEARCH · Search NASA

Results for “Gamma Scan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

AGR-3/4 Irradiation Test Train Disassembly and Component Metrology First Look Report

The AGR-3/4 experiment was designed to study fission product transport within graphitic matrix material and nuclear-grade graphite. To this end, this experiment consisted of 12 capsules, each fueled with 4 compacts containing UCO TRISO particles as driver fuel and 20 UCO designed-to-fail (DTF) fuel particles in each compact. The DTF fuel was fabricated with a thin pyrocarbon layer which was intended to fail during irradiation and provide a source of fission products. These fission products could then migrate through the compact and into the surrounding concentric rings of graphitic matrix material and/or nuclear graphite. Through post-irradiation examination (PIE) of the rings (including physical sampling and gamma scanning) fission product concentration profiles within the rings can be determined. These data can be used to elucidate fission product transport parameters (e.g. diffusion coefficients within the test materials) which will be used to inform and refine models of fission product transport. After irradiation in the Advanced Test Reactor (ATR) had been completed in April 2014, the AGR-3/4 experiment was shipped to the Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) for inspection, disassembly, and metrology. The AGR-3/4 test train was received at MFC in two separate shipments between February and April 2015. Visual examinations of the test train exterior did not indicate dimensional distortion, and only two small discolored areas were observed at the bottom of Capsules 8 and 9. No corresponding discoloration was found on the inside of these capsules, however. Prior to disassembly, the two test train sections were subject to analysis via the Precision Gamma Scanner (PGS), which did not indicate that any gross fuel relocation had occurred. A series of specialized tools (including clamps, cutters, and drills) had been designed and fabricated in order to carry out test train disassembly and recovery of capsule components (graphite rings and fuel compacts). This equipment performed well for separating each capsule in the test train and extracting the capsule components. Only a few problems were encountered. In one case, the outermost ring (the sink ring) was cracked during removal of the capsule through tubes. Although the sink ring will be analyzed in order to obtain a mass balance of fission products in the experiment, these cracks do not pose a major concern because the sink ring will not be analyzed in detail to obtain the spatial distribution of fission products. In Capsules 4 and 5, the compacts could not be removed from the inner rings. Strategies for removing the compacts are being evaluated. Sampling the inner rings with the compacts in-place is also an option. Dimensional measurements were made on the compacts, inner rings, outer rings, and sink rings. The diameters of all compacts decreased by 0.5 to 2.0 %. Generally, the extent of diametric shrinkage increased linearly with increasing neutron fluence. Most compact lengths also decreased. Compact lengths decreased with increasing fluence, reaching maximum shrinkage of about 0.9 % at a fast fluence of 4.0x1025 n/m2 E > 0.18 MeV. Above this fluence, the extent of length shrinkage appeared to decrease with fluence, and two compacts from Capsule 7 were found to have slightly increased in length (< 0.1 %) after a fluence of 5.2x1025 n/m2.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AGR-1 Irradiated Test Train Preliminary Inspection and Disassembly First Look

The AGR-1 irradiation experiment ended on November 6, 2009, after 620 effective full power days in the Advanced Test Reactor, achieving a peak burnup of 19.6% FIMA. The test train was shipped to the Materials and Fuels Complex in March 2010 for post-irradiation examination. The first PIE activities included non-destructive examination of the test train, followed by disassembly of the test train and individual capsules and detailed inspection of the capsule contents, including the fuel compacts and the graphite fuel holders. Dimensional measurements of the compacts, graphite holders, and steel capsules shells were performed using a custom vision measurement system (for outer diameters and lengths) and conventional bore gauges (for inner diameters). Gamma spectrometry of the intact test train gave a preliminary look at the condition of the interior components. No evidence of damage to compacts or graphite components was evident from the isotopic and gross gamma scans. Neutron radiography of the intact Capsule 2 showed a high degree of detail of interior components and confirmed the observation that there was no major damage to the capsule. Disassembly of the capsules was initiated using procedures qualified during out-of-cell mockup testing. Difficulties were encountered during capsule disassembly due to irradiation-induced changes in some of the capsule components’ properties, including embrittled niobium and molybdenum parts that were susceptible to fracture and swelling of the graphite fuel holders that affected their removal from the capsule shells. This required various improvised modifications to the disassembly procedure to avoid damage to the fuel compacts. Ultimately the capsule disassembly was successful and only one compact from Capsule 4 (out of 72 total in the test train) sustained damage during the disassembly process, along with the associated graphite holder. The compacts were generally in very good condition upon removal. Only relatively minor damage or markings were visible using high resolution photographic inspection. Compact dimensional measurements indicated diametrical shrinkage of 0.9 to 1. 4%, and length shrinkage of 0.2 to 1.1%. The shrinkage was somewhat dependent on compact location within each capsule and within the test train. Compacts exhibited a maximum diametrical shrinkage at a fast neutron fluence of approximately 3×1021 n/cm2. A multivariate statistical analysis indicates that fast neutron fluence as well as compact position in the test train influence compact shrinkage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Post-Irradiation Non-Destructive Analyses of the AFIP-7 Experiment

This paper reports the results and interpretation of post-irradiation non-destructive examinations performed on four curved full-size fuel plates that comprise the AFIP-7 experiment. These fuel plates, having a U-10 wt.%Mo monolithic design, were irradiated under moderate operating conditions in the Advanced Test Reactor to assess fuel performance for geometries that are prototypic of research reactor fuel assemblies. Non-destructive examinations include visual examination, neutron radiography, profilometry, and precision gamma scanning. This article evaluates the qualitative and quantitative data taken for each plate, compares corresponding data sets, and presents the results of swelling analyses. Finally, these characterization results demonstrate that the fuel meets established irradiation performance requirements for mechanical integrity, geometric stability, and stable and predictable behavior.

36 MATERIALS SCIENCE↗

Irradiation performance of nonfertile (Pu-MA-Zr) fast reactor metal fuels

This work was part of a program begun in 2001 to develop advanced nuclear fuels, originally as carriers for plutonium and minor actinides (neptunium, curium, and americium) taken from spent commercial light-water reactors (LWR) so that the plutonium and minor actinides could be ‘burned’ or transmuted in an accelerator or a fast nuclear reactor. A central part of these experiment programs has been the development of advanced fast reactor fuels, because a fast reactor was considered the most efficient vehicle to transmute the actinide waste products, and metallic fuels is a central focus of these tests. An experiment design was developed in which a thermal test reactor, the Advanced Test Reactor (ATR), was used to test small fuel pin prototypes, by creating areas in the core shielded by cadmium filters to produce a largely epithermal and fast neutron spectrum environment in which the pins could be irradiated. The results of non-fertile metallic fuel (no uranium) tests are presented here. Pu-Am-Np-Zr fuels were irradiated to fission densities up to 33 × 10 20 fission/cm 3 and Pu-239 depletions of up to 39%. The depletions were created by roughly 2/3 by fission and 1/3 by transmutation neutron capture. Up to five fuel ‘rodlets’ were irradiated in three sealed capsules stacked axially in the core, and the peak cladding temperatures ranged from 300°C to 500°C, depending on axial location as those near the core centerline are operating hotter and to higher fission densities. Several post-irradiation examinations (precision gamma scanning and fission gas release) were similar to other historical metal fuel experiments in fast reactors. However, optical metallography indicated that two of the rodlets had breached. The exact reasons are unclear. Due to the design of this irradiation experiment a rodlet breach could have increased the temperature in others in the same capsule by contaminating the thermal gap helium with heavier and less conductive fission product gases. Finally, some of those rodlets showed high amounts of fuel/cladding chemical interaction (FCCI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Key Results from Detailed Nondestructive Examinations of 25 Pressurized Water Reactor High Burnup Spent Nuclear Fuel Rods

The High Burnup Spent Fuel Data Project, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is focused on understanding the effects of long-term storage and transportation on high burnup (HBU) (>45 GW days per tonne uranium) light water reactor fuel. The project includes 32 HBU spent nuclear fuel (SNF) assemblies (the project assemblies) that are stored in a typical independent spent fuel storage installation (ISFSI) and 25 “sister rods”—9 SNF rods that were removed from the fuel assemblies prior to insertion to the ISFSI and 16 SNF rods removed from similar HBU assemblies. The sister rods provide a baseline of the condition of the HBU rods before loading, drying, and long-term dry storage. The project assemblies will be inspected after 10 years, and the physical state of the stored rods will be compared with the condition of the sister rods to identify any changes in physical properties during the dry storage period. Our report focuses on key results from the nondestructive postirradiation examinations of the sister rods and summarizes the results of detailed visual examinations, gamma scans, dimensional measurements, and eddy current liftoff measurements of the combined Chalk River unidentified deposits and oxide layer on the waterside surface of the rod. Additionally the data are used to calculate fuel rod and pellet stack growth rates, estimated remaining fuel rod plenum volumes, and the percentage change in fuel rod cladding diameter.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phase 1 Final status survey plan for the West Valley demonstration project.

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

54 ENVIRONMENTAL SCIENCES↗

Tank 40 Final SB7b Chemical Characterization Results

A sample of Sludge Batch 7b (SB7b) was taken from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS). The SB7b WAPS sample was also analyzed for chemical composition including noble metals and fissile constituents, and these results are reported here. These analyses along with the WAPS radionuclide analyses will help define the composition of the sludge in Tank 40 that is currently being fed to the Defense Waste Processing Facility (DWPF) as SB7b. At the Savannah River National Laboratory (SRNL) the 3-L Tank 40 SB7b sample was transferred from the shipping container into a 4-L high density polyethylene bottle and solids were allowed to settle over the weekend. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 558 g sub-sample was removed. This sub-sample was then utilized for all subsequent analytical samples. Eight separate aliquots of the slurry were digested, four with HNO 3 /HCl (aqua regia) in sealed Teflon® vessels and four with NaOH/Na 2 O 2 (alkali or peroxide fusion) using Zr crucibles. Two Analytical Reference Glass - 1 (ARG-1) standards were digested along with a blank for each preparation. Each aqua regia digestion and blank was diluted to 1:100 mL with deionized water and submitted to Analytical Development (AD) for inductively coupled plasma - atomic emission spectroscopy (ICP-AES) analysis, inductively coupled plasma - mass spectrometry (ICP-MS) analysis, atomic absorption spectroscopy (AA) for As and Se, and cold vapor atomic absorption spectroscopy (CV-AA) for Hg. Equivalent dilutions of the alkali fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB7b supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES, ion chromatography (IC), total base/free OH - /other base, total inorganic carbon/total organic carbon (TIC/TOC) analyses, and Cs-137 gamma scan. Weighted dilutions of slurry were submitted for IC, TIC/TOC, and total base/free OH - /other base analyses. Activities for U-233, U-235, and Pu-239 were determined from the ICP-MS data for the aqua regia digestions of the Tank 40 WAPS slurry using the specific activity of each isotope. The Pu-241 value was determined from a Pu-238/-241 method developed by SRNL AD and previously described. The following conclusions were drawn from the analytical results reported here: (1) The ratios of the major elements for the SB7b WAPS sample are different from those measured for the SB7a WAPS sample. There is less Al and Mn relative to Fe than the previous sludge batch. (2) The elemental composition of this sample and the analyses conducted here are reasonable and consistent with DWPF batch data measurements in light of DWPF pre-sample concentration and SRAT product heel contributions to the DWPF SRAT receipt analyses. The element ratios for Al/Fe, Ca/Fe, Mn/Fe, and U/Fe agree within 10% between this work and the DWPF Sludge Receipt and Adjustment Tank (SRAT) receipt analyses. (3) Sulfur in the SB7b WAPS sample is 82% soluble, slightly less than results reported for SB3, SB4, and SB6 samples but unlike the 50% insoluble sulfur observed in the SB5 WAPS sample. In addition, 23% of the soluble sulfur is not present as sulfate in SB7b. (4) The average activities of the fissile isotopes of interest in the SB7b WAPS sample are (in μCi/g of total dried solids): 4.22E-02 U-233, 6.12E-04 U-235, 1.08E+01 Pu-239, and 5.09E+01 Pu-241. The full radionuclide composition will be reported in a future document. (5) The fission product noble metal and Ag concentrations appear to have largely peaked in previous DWPF sludge batches, with the exception of Ru, which still shows a slight increase in SB7b.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY-12 INL Krypton Capture Activities Supporting the Off-Gas Sigma Team

Tasks performed this year by INL Kr capture off-gas team members can be segregated into three separate task sub-sections which include: 1) The development and testing of a new engineered form sorbent, 2) An initial NDA gamma scan effort performed on the drum containing the Legacy Kr-85 sample materials, and 3) Collaborative research efforts with PNNL involving the testing of the Ni-DOBDC MOF and an initial attempt to make powdered chalcogel material into an engineered form using our binding process. This document describes the routes to success for the three task sub-sections.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of Fission Products on the AGR-1 Capsule Components

The components of the AGR-1 irradiation capsules were analyzed to determine the retained inventory of fission products in order to determine the extent of in-pile fission product release from the fuel compacts. This includes analysis of (1) the metal capsule components, (2) the graphite fuel holders, (3) the graphite spacers, and (4) the gas exit lines. The fission products most prevalent in the components were Ag-110m, Cs-134, Cs-137, Eu-154, and Sr-90, and the most common location was the metal capsule components and the graphite fuel holders. Gamma scanning of the graphite fuel holders was also performed to determine spatial distribution of Ag-110m and radiocesium. Silver was released from the fuel components in significant fractions. The total Ag-110m inventory found in the capsules ranged from 1.2×10 -2 (Capsule 3) to 3.8×10 -1 (Capsule 6). Ag-110m was not distributed evenly in the graphite fuel holders, but tended to concentrate at the axial ends of the graphite holders in Capsules 1 and 6 (located at the top and bottom of the test train) and near the axial center in Capsules 2, 3, and 5 (in the center of the test train). The Ag-110m further tended to be concentrated around fuel stacks 1 and 3, the two stacks facing the ATR reactor core and location of higher burnup, neutron fluence, and temperatures compared with Stack 2. Detailed correlation of silver release with fuel type and irradiation temperatures is problematic at the capsule level due to the large range of temperatures experienced by individual fuel compacts in each capsule. A comprehensive Ag-110m mass balance for the capsules was performed using measured inventories of individual compacts and the inventory on the capsule components. For most capsules, the mass balance was within 11% of the predicted inventory. The Ag-110m release from individual compacts often exhibited a very large range within a particular capsule.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RERTR-12 Post-irradiation Examination Summary Report

The following report contains the results and conclusions for the post irradiation examinations performed on RERTR-12 Insertion 2 experiment plates. These exams include eddy-current testing to measure oxide growth; neutron radiography for evaluating the condition of the fuel prior to sectioning and determination of fuel relocation and geometry changes; gamma scanning to provide relative measurements for burnup and indication of fuel- and fission-product relocation; profilometry to measure dimensional changes of the fuel plate; analytical chemistry to benchmark the physics burnup calculations; metallography to examine the microstructural changes in the fuel, interlayer and cladding; and microhardness testing to determine the material-property changes of the fuel and cladding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 Irradiated Test Train Preliminary Inspection and Disassembly First Look

The AGR 2 irradiation experiment began in June 2010 and was completed in October 2013. The test train was shipped to the Materials and Fuels Complex in July 2014 for post-irradiation examination (PIE). The first PIE activities included nondestructive examination of the test train, followed by disassembly of the test train and individual capsules and detailed inspection of the capsule contents, including the fuel compacts and their graphite fuel holders. Dimensional metrology was then performed on the compacts, graphite holders, and steel capsule shells. AGR 2 disassembly and metrology were performed with the same equipment used successfully on AGR 1 test train components. Gamma spectrometry of the intact test train gave a preliminary look at the condition of the interior components. No evidence of damage to compacts or graphite components was evident from the isotopic and gross gamma scans. Disassembly of the AGR 2 test train and its capsules was conducted rapidly and efficiently by employing techniques refined during the AGR 1 disassembly campaign. Only one major difficulty was encountered while separating the test train into capsules when thermocouples (of larger diameter than used in AGR 1) and gas lines jammed inside the through tubes of the upper capsules, which required new tooling for extraction. Disassembly of individual capsules was straightforward with only a few minor complications. On the whole, AGR 2 capsule structural components appeared less embrittled than their AGR 1 counterparts. Compacts from AGR 2 Capsules 2, 3, 5, and 6 were in very good condition upon removal. Only relatively minor damage or markings were visible using high resolution photographic inspection. Compact dimensional measurements indicated radial shrinkage between 0.8 to 1.7%, with the greatest shrinkage observed on Capsule 2 compacts that were irradiated at higher temperature. Length shrinkage ranged from 0.1 to 0.9%, with by far the lowest axial shrinkage on Capsule 3 compacts—possibly as a consequence of lower packing fraction or larger particle size. Differences in fast neutron fluence among compacts from these four capsules had no obvious effect on radial and axial shrinkage. (The AGR 2 experiment included Capsule 1 containing French compacts and Capsule 4 with compacts made at Oak Ridge National Laboratory using South African fuel particles. Information on these two batches of AGR 2 fuel compacts is confined to restricted Appendices A and B because of proprietary information limitations.)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Postirradiation Examination of the ATF-1 Experiments - 2018 Status

The Advanced Fuels Campaign in collaboration with industry are working to develop enhanced accident tolerant fuels for light water reactors. The initial irradiations of these concepts were performed in the Idaho National Laboratory Advanced Test Reactor using simple drop-in style irradiations. These irradiations are collectively referred to as ATF 1. The postirradiation examination of ATF 1 has begun and some concepts have now completed initial examination. This report describes the results of examinations on ATF 1 irradiations designed to test the feasibility of enhancing UO 2 thermal conductivity with additives, ATF 1 irradiations of uranium silicide, and the current status of ATF 1 irradiations that are in process at the hot cell. Enhanced thermal conductivity uranium dioxide composites containing silicon carbide (UO 2 SiC) and diamond (UO 2 diamond) have been irradiated to low burnup. The conditions of this irradiation test and subsequent postirradiation examinations are discussed. These irradiations evaluate fuel microstructure and potential fuel cladding interaction under representative light water reactor power conditions. Both non destructive and destructive techniques have been used to evaluate fuel integrity, fission gas release, fission product distribution, burnup, fuel swelling and cladding strain. Examination of the UO 2 SiC pellets revealed enhanced cracking when compared to a UO 2 rodlet also irradiated under similar conditions. Additionally, instability of the SiC whiskers in the uranium dioxide matrix was observed in the pellet central region, where the local temperatures exceeded 1300 °C. The microstructure of the diamond added UO 2 was severely disrupted during irradiation, resulting in local migration of cesium along the fuel stack and increased fission gas release when compared with the expected release from the Vitanza curve at corresponding values of burnup and irradiation temperature. The postirradiation examination results cast doubt on the suitability of these additives to improve UO 2 fuel performance in a way that would lead to enhanced accident tolerance. Additionally, postirradiation examination data of U 3 Si 2 fuels at low burnup (i.e., < 20 GWd/tHM) for application in advanced Light Water Reactor (LWR) is presented. The U 3 Si 2 pellets show limited cracking in comparison to the expected behavior of UO 2 at same power level. In addition, gamma scanning data did not reveal migration of fission products. Minor homogeneous hardening along the pellet radius due to accumulation of fission products and radiation damage was measured by microindentation. The fission gas release and swelling remains very low. Formation of fission gas bubbles resolvable with optical microscopy occurs from the pellets center outward to approximately 60% of the fuel pellet radius. The overall data suggest a good performance of this accident tolerant fuel candidate at low burnup. Finally, the current status of postirradiation examination on other ATF 1 irradiations will be discussed. These irradiations include UO 2 clad in an FeCrAl alloy, an alternative uranium silicide compound U 3 Si 5 also clad in a FeCrAl alloy, and an interaction test between UO 2 and different FeCrAl alloys.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Examination of Legacy Metallic Fuel Pins (U-10Zr) Tested in FFTF

The MFF series of metallic fuel (U-10wt%Zr) tests performed in the Fast Fuel Test Facility (FFTF) were the beginning tests to qualify the fuel as a driver fuel for FFTF. They all performed very well, to relatively high burnup and with no pin breaches. Tests MFF-3 and MFF-5 were chosen to be destructively examined because they were run at high peak cladding temperatures, 643 and 649°C respectively, and to modest to high burnup (138 and 101 MWd/kgM respectively). They were the only sodium fast reactor (SFR) metallic tests, with long (91.4 cm) fuel columns and clad in HT9, to be operated at these high temperatures. Extensive operating condition reconstruction was performed to accompany the examination, providing detailed operating conditions axially along the pins. In addition, detailed ORIGEN calculations provided fuel burnup along the pin length. These calculations and detailed cross-section metallography allowed a PhD dissertation to be performed where the fuel/cladding chemical interaction (FCCI) was modeled using Fickian and Soret Effect driven diffusion of rare earth fission products to the cladding surface and interact with the cladding. The examination of the MFF-3 and MFF-5 pins included neutron radiography, axial profilometry including pin bow and length measurements, precision gamma scanning, plenum gas puncturing to measure fission gas release, detailed chemical/isotopic analyses of fuel samples to confirm burnup calculations, and metallography of pin cross-sections, including micro-hardness measurements of fuel and cladding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Non-destructive Examinations of ATF-2 Baseline Rodlets

This report contains the results of non-destructive examinations of Accident Tolerant Fuels 2 (ATF-2) rodlets irradiated in the Advanced Test Reactor (ATR) Loop 2A. The experiment is part of the U.S. Department of Energy Nuclear Technology Research and Development (NTRD) program’s Advanced Fuels Campaign (AFC). The rodlets were composed of UO2 pellets and Zr-4 cladding. The data have been collected to provide baseline PIE data to support future testing in TREAT and to have performance data against which the data of the ATF concepts can be compared directly. The analyses performed included: visual examinations, axial gamma scanning, neutron radiography and profilometry. All the data collected showed a performance consistent with expectations for this fuel system at low burnup.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Report on SFR Metallic Fuel Data Qualification

This report summarizes the progress of SFR metallic fuel qualification related activities, which are focused on providing quality assurance relevant information applicable to experiments irradiated during the Integral Fast Reactor (IFR) program. A background of metallic fuel performance data and the associated databases, including the EBR-II Fuels Irradiation & Physics Database (FIPD) and Out-of-Pile Transient Database (OPTD), is included. The legacy data in the databases, including as-built, post-irradiation examination (PIE), operating parameters, and out-of-pile experiment data are introduced. The SFR metallic fuel Quality Assurance Program Plan (QAPP) and its implementation to qualify these legacy data is described in detail. Important PIE data QA documents and the specifications of four types of PIE measurements (contact profilometry, laser profilometry, neutron radiography and gamma scan) are provided. Examples of the implementation of the QAPP to qualify each of those types of PIE data are provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimation of Fission Product Transport Parameters for Cesium in the AGR-3/4 TRISO Fuel Experiment

A one-dimensional (1D) finite-element model of fission product transport in the AGR-3/4 experiment has been developed using the Multiphysics Object Oriented Simulation Environment (MOOSE) framework and implemented in the fuel performance code, BISON. The model resolves capsule-specific geometries, materials, and temperature histories and simulates radial migration of fission products from the fuel compact through the inner ring, outer ring, and into the sink ring. Model parameters governing diffusion and sorption were estimated for key fission products – cesium (Cs), and europium (Eu) – by simultaneously fitting modeled isotopic concentration profiles and total ring inventories to a post-irradiation experimental measurement. These data include gamma scanning, liquid scintillation for Sr-90, radial deconsolidation leach-burn-leach analysis, tomographic reconstructions, and destructive physical sampling. A mortar-based interfacial sorption framework was implemented to enforce physically consistent mass transfer and flux conservation across gas gaps. Two classes of parameter sets were derived: a least-squares best-fit, and a safety-oriented conservative-fit, what applies strong penalties for underprediction of sink inventories. Across all twelve capsules, the model successfully reproduces the dominant radial transport trends for Cs, Sr, with decreasing concentrations from the compact outward through successive rings. Cs behavior is captured most consistently, while strontium predictions reveal systematic trade-offs between compact accuracy and conservative sink-ring bounding. The results demonstrate that sink ring weighted calibration provides conservative, safety relevant bounds on low temperature fission product transport, but at the cost of underpredicting compact inventories for Sr isotopes. These discrepancies highlight the need for additional physics, including fast-slow diffusion model, incorporating trapping mechanism in the transport behavior. Overall, this work establishes a robust, capsule-specific modeling framework for AGR-3/4 fission product transport and provides a defensible basis for parameter selection in source-term and fuel performance analyses for high temperature gas-cooled reactors.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Progress Report on SFR Metallic Fuel Data Qualification

This report summarizes the progress of SFR metallic fuel qualification related activities, which are focused on providing quality assurance relevant information applicable to experiments irradiated during the Integral Fast Reactor (IFR) program. An overview of the metallic fuel performance data and the associated databases, including the EBR-II Fuels Irradiation & Physics Database (FIPD), Out-of-Pile Transient Database (OPTD), and TREAT Experimental Relational Database (TREXR) is included. The legacy data in the databases, including as-built, post-irradiation examination (PIE), operating parameters, and out-of-pile experiment post-test data are introduced. The SFR metallic fuel Quality Assurance Program Plan (QAPP) and its implementation to qualify these legacy data is described in detail. Important PIE data QA documents and the specifications of seven types of PIE measurements (contact profilometry, laser profilometry, neutron radiography, gamma scan, fission gas release fission gas chemistry, and metallography) are provided. Examples of the implementation of the QAPP to qualify each of those types of PIE data are provided.

Mo, Kun [Argonne National Laboratory (ANL), Argonn↗

Quality Assurance of Legacy Post-Irradiation Examination Data for Metallic Fuels

The U.S. DOE-NE’s Advanced Reactor Technologies (ART) Fast Reactor Program (FRP) and the NE-4 Advanced Fuels Campaign (AFC) have jointly undertaken the qualification of the legacy post-irradiation examination (PIE) data held in the Fuels Irradiation & Physics Database (FIPD), covering metallic fuel experiments conducted in the Experimental Breeder Reactor II (EBR-II) and the Fast Flux Test Facility (FFTF). In FY26 this effort reached a milestone: six major types of PIE data—contact profilometry, isotopic gamma scan, fission gas chemistry, fission gas release, laser profilometry, and neutron radiography—have been qualified for all available experiments in FIPD, and the U.S. nuclear industry can now draw on them with confidence in licensing activities for metallic fuel-based advanced fast reactors. This report documents the qualification process and the resulting status of the PIE data.

Mo, Kun↗