Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hydraulic Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Titan 3E/Centaur D-1T Systems Summary

A systems and operational summary of the Titan 3E/Centaur D-1T program is presented which describes vehicle assembly facilities, launch facilities, and management responsibilities, and also provides detailed information on the following separate systems: (1) mechanical systems, including structural components, insulation, propulsion units, reaction control, thrust vector control, hydraulic systems, and pneumatic equipment; (2) astrionics systems, such as instrumentation and telemetry, navigation and guidance, C-Band tracking system, and range safety command system; (3) digital computer unit software; (4) flight control systems; (5) electrical/electronic systems; and (6) ground support equipment, including checkout equipment.

Source record↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

317/319 Phytoremediation site monitoring report - 2009 growing season : final report.

In 1999, Argonne National Laboratory (Argonne) designed and installed a series of engineered plantings consisting of a vegetative cover system and approximately 800 hybrid poplars and willows rooting at various predetermined depths. The plants were installed using various methods including Applied Natural Science's TreeWell{reg_sign} system. The goal of the installation was to protect downgradient surface and groundwater by intercepting the contaminated groundwater with the tree roots, removing moisture from the upgradient soil area, reducing water infiltration, preventing soil erosion, degrading and/or transpiring the residual volatile organic compounds (VOCs), and removing tritium from the subsoil and groundwater. This report presents the results of the monitoring activities conducted by Argonne's Energy Systems (ES) Division in the growing season of 2009. Monitoring of the planted trees began soon after the trees were installed in 1999 and has been conducted every summer since then. As the trees grew and consolidated their growth into the contaminated soil and groundwater, their exposure to the contaminants was progressively shown through tissue sampling. During the 2009 sampling campaign, VOC concentrations found in the French Drain area were in general consistent with or slightly lower than the 2008 results. Additionally, closely repeated, stand wide analyses showed contaminant fluctuations that may indicate short-term contaminant depletion in the area of interest of roots. This data will be useful to determine short-term removal rate by the trees. As in previous years, levels in the Hydraulic Control Area were close to background levels except for a few exceptions.

54 ENVIRONMENTAL SCIENCES↗

Numerical simulation of the actuation system for the ALDF's propulsion control valve

A numerical simulation of the actuation system for the propulsion control valve (PCV) of the NASA Langley Aircraft Landing Dynamics Facility was developed during the preliminary design of the PCV and used throughout the entire project. The simulation is based on a predictive model of the PCV which is used to evaluate and design the actuation system. The PCV controls a 1.7 million-pound thrust water jet used in propelling a 108,000-pound test carriage. The PCV can open and close in 0.300 second and deliver over 9,000 gallons of water per sec at pressures up to 3150 psi. The numerical simulation results are used to predict transient performance and valve opening characteristics, specify the hydraulic control system, define transient loadings on components, and evaluate failure modes. The mathematical model used for numerically simulating the mechanical fluid power system is described, and numerical results are demonstrated for a typical opening and closing cycle of the PCV. A summary is then given on how the model is used in the design process.

Korte, John J.↗

Controlling saturation to improve per- and polyfluoroalkyl substance (PFAS) removal in biochar-amended stormwater bioretention systems

Black carbon-amended bioretention systems are an increasingly popular strategy for the removal of organic contaminants, including poly- and perfluoroalkyl substances (PFASs) and other trace organic contaminants (TOrCs), from urban stormwater. Many PFASs preferentially accumulate at the air–water interface, but detention time requirements for stormwater bioretention systems typically result in full saturation of the bioretention systems, effectively removing their air–water interfaces. This study assessed the effect of bioretention system saturation on removal of PFASs, metals, and hydrophilic TOrCs. A field-aged mixture of 40% v/v sand, 30% v/v zeolite, and 30% v/v biochar was packed into columns which were operated with hydraulic controls to remain unsaturated or fully saturated throughout the duration of the experiment. Twenty-four storm events sized to a 95th percentile storm at a California, United States military site were simulated using synthetic stormwater fortified with aqueous film forming foam-derived PFASs, TOrCs, and metals to mimic real-world conditions. Unsaturated conditions outperformed saturated conditions for removal of all PFASs analyzed. A simulated inadvertent system perturbation (i.e. flooding event) in the unsaturated columns did not result in significantly greater mobilization of PFAS mass, suggesting that more sorption to the biochar occurred as a result of the transient retention of PFASs at the air–water interface reducing kinetic sorption limitations. Overall, maintaining unsaturated conditions in a biofilter may extend the sorptive filter lifetime for PFASs by up to 83%. The results have implications for bioretention system application and design for PFAS removal in contaminated catchment areas.

13 HYDRO ENERGY↗

Chromium Plume at LANL - From Conceptual Site Model to Development of Complex Remediation Strategies - 18682

A hexavalent chromium plume is present in deep groundwater beneath Los Alamos National Laboratory (LANL or the Laboratory). The plume originated from releases of potassium dichromate from cooling towers from 1956 - 1972. Estimates are that up to 72,000 kg of chromium was released during that period. Data from surface water-balance studies, core-hole and groundwater characterization, geomorphic investigations and geology and geophysics provide the basis for an evolved conceptual model that chromium initially traveled rapidly via an effluent-supported stream for several kilometers, then infiltrated through a stratigraphically complex 275-300 meters thick vadose zone and eventually into a deep (regional) aquifer that is the water supply for the Laboratory and surrounding municipality. The travel time from the release point to the regional aquifer is estimated at 5-10 years based on modeling and contaminant tracers. Monitoring data from two-screen wells and piezometers within the regional aquifer, and data derived from stratified sampling conducted during sonic coring and from analysis of sonic core indicate that the chromium contamination occurs within the upper 23 meters of the highly stratified regional aquifer. Different geologic units at the water table and structural dip of depositional bedding appear to have little effect on chromium migration and plume shape and thickness which instead appear to be a manifestation of multiple breakthrough locations, interconnectedness of preferential hydraulic strata, and a negligible vertical gradient. Recent monitoring data indicate that the down-gradient plume edge (as defined by the New Mexico groundwater standard of 50 μg/L) may be advancing near the Laboratory's boundary with a neighboring Indian reservation. The Laboratory is addressing the increasing concentrations with a regulatory-driven interim measure that uses hydraulic control to manage plume migration. The interim measure involves limited-duration (2-3 years) pumping, treatment, and injection to rapidly establish and maintain the 50 μg/L plume edge within the Laboratory boundary while a final remediation strategy is developed and approved by the State regulator. A final remediation strategy will depend heavily on the ability to cost-effectively access the deep aquifer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

317/319 phytoremediation site monitoring report - 2004 growing season.

In 1999, Argonne National Laboratory (ANL) designed and installed a series of engineered plantings consisting of a vegetative cover system and approximately 800 hybrid poplars and willows rooting at various predetermined depths. The plants were installed using various methods including Applied Natural Science's TreeWell{reg_sign} system. The goal of the installation was to protect downgradient surface and groundwater by hydraulic control of the contaminated plume by intercepting the contaminated groundwater with the tree roots, removing moisture from the upgradient soil area, reducing water infiltration, preventing soil erosion, degrading and/or transpiring the residual volatile organic compounds (VOCs), and removing tritium from the subsoil and groundwater. This report presents the results of the monitoring activities conducted by Argonne's Energy Systems Division (ES) in the growing season of 2004. Monitoring of the planted trees began soon after the trees were installed in 1999 and has been conducted every summer since then. As the trees grew and consolidated their growth into the contaminated soil and groundwater, their exposure to the contaminants was progressively shown through tissue sampling. Since the inception of the project, significant progress was made in the refinement and testing of the analytical method (for which no official method is available), the determination of the optimal tissue for sampling, and of the variability of the concentrations within a specific tree. An understanding has also been developed on background concentrations of VOCs, and how to discriminate between VOCs that are associated with plant tissue because of aerial or of soil/groundwater uptake pathways. Also, during the 2003 sampling campaign, core samples from tree trunks were collected for the first time (the trees were large enough to stand the procedure). Data collected from the French Drain area last year supported the hypothesis that a correlation was present between concentrations of VOCs in the soil and in corresponding branch tissue. During this year (2004), systematic data collection in the French Drain area further consolidated this correlation and indicated that trees are clearly in the condition to have reached the target rooting depth. Concentrations in the hundreds of ppb in branch and trunk samples confirm that uptake can be a quantitative way to remove VOCs from the contaminated media. Additionally, laboratory studies were conducted in 2004 to determine mass recoveries from leaves and branches using the headspace method, and to determine if we could further modify our sample pretreatment method to ensure optimal recovery. Results showed that the recovery of TCE in leaves and branches with our current method ranged between 98 and 138%, indicating that most of the TCE present in the samples is recovered during the analysis. Freezing and heating had variable results in recovery rates, which resulted in no significant changes being introduced to the current SOP.

54 ENVIRONMENTAL SCIENCES↗

Results of groundwater monitoring at Everest, Kansas, in April 2008.

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE), suggesting possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE were the following: Hydraulic control by groundwater extraction with aboveground treatment; Air sparging (AS) coupled with soil vapor extraction (SVE) in large-diameter boreholes (LDBs); and Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to development of a possible CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a). (2) A field investigation in early 2006 (Argonne 2006b), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property. (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume. (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,b) and the CCC/USDA's past investigations at Everest (Argonne 2006c), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for the main body of the groundwater plume, and the KDHE concurred (KDHE 2006); the KDHE later noted, however (KDHE 2007a), that this and other technologies might represent viable remedial options in the event of further downgradient migration of the plume toward the intermittent creek. In February 2007, the CCC/USDA presented preliminary analyses of (1) the AS-SVE remedial alternative, incorporating the use of LDBs, and (2) the risks to human health and the environment posed by the observed carbon tetrachloride plume in groundwater (Argonne 2007a). The results of these analyses demonstrated the following: (1) Neither groundwater extraction nor AS-SVE in LDBs represents a practical approach for effective remediation of the groundwater contamination at Everest (near the Nigh property). (2) Periodic sampling and analyses for VOCs conducted by the CCC/USDA documented that the areal extent and range of carbon tetrachloride concentrations detected in the groundwater plume at Everest had changed relatively little from 2000 to 2006. (3) Estimates of groundwater flow and contaminant migration times, based on the hydrogeologic properties of the groundwater flow system identified at Everest (Argonne 2003, 2006b,c), indicated that, at minimum, approximately 4 years would be required for the carbon tetrachloride plume (in the subsurface) to reach the vicinity of the intermittent creek directly west of the Nigh property, and more than 20 years would be required for the contamination to reach the identified groundwater discharge area southwest of the Nigh property. (4) The existing (January-March 2006) plume posed no immediate danger of contamination to the surface waters of the intermittent creek. In light of these observations, the CCC/USDA proposed a phased program--over approximately 2-3 years--of groundwater sampling, surface water sampling, and related monitoring activities at Everest to (1) identify locations where a phytoremediation system would be effective and determine that area's extent and (2) support the potential development of a phytoremediation treatment alternative for the site. The recommended elements of the monitoring program are summarized in Table 1.1. In conjunction with this program, both the CCC/USDA and the KDHE recommended the construction of several new monitoring wells, at locations along and near the intermittent creek west of the Nigh property (Argonne 2007b; KDHE 2007b).

54 ENVIRONMENTAL SCIENCES↗

A probabilistic assessment of geomechanical reservoir integrity during CO 2 sequestration in flood basalt formations

Recent field experiments in Iceland and Washington State (USA) show that basalt formations may be favorable targets for carbon capture and sequestration (CCS) because CO 2 mineralization reactions proceed rapidly. These results imply that there is tremendous opportunity for implementing CCS in large igneous provinces. However, the magnitude of this opportunity comprises commensurate levels of uncertainty because basalt reservoirs are characterized by highly heterogeneous, fracture-controlled hydraulic properties. This geologic uncertainty is propagated as parametric uncertainty in quantitative risk models, thus limiting the efficacy of models to predict CCS performance attributes, such as reservoir integrity and storage potential. To overcome these limitations, here we present a stochastic approach for quantifying the geomechanical performance attributes of CCS operations in a highly heterogeneous basalt reservoir. We utilize geostatistical reservoir characterization to develop an ensemble of equally probable permeability distributions in a flood basalt reservoir with characteristics of the Wallula Basalt Pilot Project. We then simulate industrial-scale CO 2 injections within the ensemble and calculate the mean and variance of fluid pressure over a 1-year injection period. These calculations are combined with the state of stress in southeast Washington State to constrain the spatial extent at which shear failure, fracture initiation, and borehole breakdown may occur. Results from this study show that (i) permeability uncertainty alone causes injection pressure to vary over 25 MPa, (ii) shear failure is likely to occur at 7 times greater distances from the injection than the CO 2 migrates, and (iii) joint initiation pressures are localized within the volume comprising the CO 2 plume.

03 NATURAL GAS↗

Numerical Simulations in Support of a Long-Term Test of Gas Production From Hydrate Accumulations on the Alaska North Slope: Water Production and Associated Design and Management Issues

Here, we investigated numerical simulation strategies for a long-term test of depressurization-induced gas production from the B1 Sand of Unit B at the Hydrate-01 Stratigraphic Test Well. The main objective of this study was to estimate fluid production rates (with emphasis on water production) under a variety of conditions and production scenarios and contribute new insights to the design and management of the field test. In the first part of the study, we investigated the system response to a three-step depressurization process using two limiting sets of flow properties─the expected maximum and minimum intrinsic and effective permeabilities─for the very heterogeneous reservoir. In the second part, we investigated the effect of the production interval length and placement within the formation relative to the boundaries of the hydrate-bearing unit. The best performing well configuration was used in the third part of the study, which used the most representative subsurface flow properties to investigate the effect of the depressurization strategy on the production performance. The best overall performance (largest gas production with modest water production and a strong response at the observation wells) was obtained with a 10 m-long well situated 3 m below the top of the formation and a three-step depressurization scheme at 15-day intervals to a terminal bottomhole pressure of 2.8 MPa. The overall production performance was enhanced by a faster rate of depressurization. Estimated water production rates in all cases were limited and easily manageable. None of the tested well configurations or depressurization strategies significantly reduced water production without also severely reducing gas production. In all the investigated cases, 95% of the long-term fraction of produced water was replenished by inflows from the boundaries and could not be reduced. These substantial water inflows are an unavoidable feature of HU-B and cannot be easily mitigated by a hydraulic control.

02 PETROLEUM↗

Letter Report: Stable Hydrogen and Oxygen Isotope Analysis of B-Complex Perched Water Samples

Fine-grained sediments associated with the Cold Creek Unit at Hanford have caused the formation of a perched water aquifer in the deep vadose zone at the B Complex area, which includes waste sites in the 200-DV-1 Operable Unit and the single-shell tank farms in Waste Management Area B-BX-BY. High levels of contaminants, such as uranium, technetium-99, and nitrate, make this aquifer a continuing source of contamination for the groundwater located a few meters below the perched zone. Analysis of deuterium ( 2 H) and 18-oxygen ( 18 O) of nine perched water samples from three different wells was performed. Samples represent time points from hydraulic tests performed on the perched aquifer using the three wells. The isotope analyses showed that the perched water had δ 2 H and δ 18 O ratios consistent with the regional meteoric water line, indicating that local precipitation events at the Hanford site likely account for recharge of the perched water aquifer. Data from the isotope analysis can be used along with pumping and recovery data to help understand the perched water dynamics related to aquifer size and hydraulic control of the aquifer in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ascorbic Acid Stability and pH Testing to Support RWM-018 Pilot Scale Wellhead Treatment System Feasibility Determination

A multitude of groundwater remediation techniques for chlorinated volatile organic compounds (cVOCs) have been conducted at the A/M-Areas of the Savannah River Site (SRS). Historical in-situ chemical oxidation (ISCO) injections of potassium permanganate and sodium persulfate conducted in 2018 and 2020, have left residual oxidant concentrations in the A/M-Area groundwater system. ISCO events targeted dense non-aqueous phase liquids (DNAPLs) through the injection of strong oxidants within plume zones upgradient of current groundwater recovery wells RWM-008 and RWM-018. These residual oxidants could significantly impede the operation of the mercury removal system needed to meet National Pollutant Discharge Elimination System (NPDES) permit requirements for the ongoing pump-and-treat system that hydraulically controls potions of the A/M-Area plume. Effluent treated groundwater from this system is discharged to surface water at the receiving outfall of the M-1 Air Stripper. To prevent interference of the M-1 Air Stripper system by residual oxidants, groundwater recovery has been ceased at well RWM-018. Modeling of oxidant transport in A/M-Area from ISCO estimated that the potential oxidant load contributed by RWM-018 could be as high as 120 mg/L. It is also possible that oxidants may be contributed via pumping at well RWM-008 in the near future as residual oxidants within the aquifer migrate toward its zone of influence. Savannah River National Laboratory (SRNL) has conducted research to investigate potential pre-treatment chemicals to neutralize these residual oxidants, before reaching the M-1 Air Stripper, to allow for resumed groundwater recovery at RWM-018 and continued pumping at RWM-008. Deployment of ascorbic acid for neutralization of residual oxidants at RWM-018 (and possibly RWM-008) is recommended based on results from previous reductant testing (SRNL, 2021). For a maximum estimated oxidant load at RWM-0018, a well-head treatment system would need to dose about 400 gallons of ascorbic acid each month to ensure complete neutralization. A second system with additional reagent should also be considered for deployment at RWM-008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fail-safe bidirectional valve driver

Cross-coupled diodes are added to commonly used bidirectional valve driver circuit to protect circuit and power supply. Circuit may be used in systems requiring fail-safe bidirectional valve operation, particularly in chemical- and petroleum-processing control systems and computer-controlled hydraulic or pneumatic systems.

Fujimoto, H.↗

The generation and propagation of internal gravity waves in a rotating fluid

The present investigation is concerned with an extension of a study conducted bu Maxworthy (1979) on internal wave generation by barotropic tidal flow over bottom topography. A short series of experiments was carried out during a limited time period on a large (14-m diameter) rotating table. It was attempted to obtain, in particular, information regarding the plan form of the waves, the exact character of the flow over the obstacle, and the evolution of the waves. The main basin was a dammed section of a long free surface water tunnel. The obstacle was towed back and forth by a wire harness connected to an electronically controlled hydraulic piston, the stroke and period of which could be independently varied. Attention is given to the evolution of the wave crests, the formation of solitary wave groups the evolution of the three-dimensional wave field wave shapes, the wave amplitudes, and particle motion.

Maxworthy, T.↗

Computer aided analysis and optimization of mechanical system dynamics

The purpose is to outline a computational approach to spatial dynamics of mechanical systems that substantially enlarges the scope of consideration to include flexible bodies, feedback control, hydraulics, and related interdisciplinary effects. Design sensitivity analysis and optimization is the ultimate goal. The approach to computer generation and solution of the system dynamic equations and graphical methods for creating animations as output is outlined.

Haug, E. J.↗

Micromechanics of compression failures in open hole composite laminates

The high strength-to-weight ratio of composite materials is ideally suited for aerospace applications where they already are used in commercial and military aircraft secondary structures and will soon be used for heavily loaded primary structures. One area impeding the widespread application of composites is their inherent weakness in compressive strength when compared to the tensile properties of the same material. Furthermore, these airframe designs typically contain many bolted or riveted joints, as well as electrical and hydraulic control lines. These applications produce areas of stress concentration, and thus, further complicate the compression failure problem. Open hole compression failures which represent a typical failure mode for composite materials are addressed.

Guynn, E. Gail↗

Evaluation of Forces on the Welding Probe of the Automated Retractable Pin-Tool (RPT)

The NASA invention entitled 'The Hydraulic Controlled Auto-Adjustable Pin Tool for Friction Stir Welding' (US Patent 5,893,507), better known as the Retractable Pin-Tool (RPT), has been instrumented with a load-detecting device allowing the forces placed on the welding probe to be measured. As the welding probe is plunged into the material, the forces placed on the probe can now be characterized. Of particular interest are those forces experienced as the welding probe comes within close proximity to the back-up anvil. For a given material, it is believed that unique forces are generated relative to the distance between the welding probe and the anvil. The forces have been measured and characterized for several materials, and correlations have been made between these forces and the pin's position relative to the backside of the weld material.

Ding, R. J.↗