Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Systems Integration Processes for NASA's Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable low earth orbit. This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and non-propulsion elements within NASA's Crew Launch Vehicle (CLV). The objective of the CLV is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to Low Earth Orbit (LEO) in support of the lunar and Mars missions. The CLV must successfully provide the capability within cost and schedule with an acceptable risk approach. This paper will describe in detail the systems engineering management processes that will be applied to assure CLV Project success through complete and efficient technical integration. Discussion of specific processes for requirements development and verification, integrated design and analysis, integrated simulation and testing and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The CLV Project is broken logically into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these CLV elements and among the other Constellation projects. Launch vehicle stack integration (CLV to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage will also be discussed. The processes for decomposing requirements to the Elements and ensuring that requirements have been correctly validated, decomposed, allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements will be discussed.

Reuter, James L.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Prototype Common Bus Spacecraft: Hover Test Implementation and Results

In order to develop the capability to evaluate control system technologies, NASA Ames Research Center (Ames) began a test program to build a Hover Test Vehicle (HTV) - a ground-based simulated flight vehicle. The HTV would integrate simulated propulsion, avionics, and sensors into a simulated flight structure, and fly that test vehicle in terrestrial conditions intended to simulate a flight environment, in particular for attitude control. The ultimate purpose of the effort at Ames is to determine whether the low-cost hardware and flight software techniques are viable for future low cost missions. To enable these engineering goals, the project sought to develop a team, processes and procedures capable of developing, building and operating a fully functioning vehicle including propulsion, GN&C, structure, power and diagnostic sub-systems, through the development of the simulated vehicle.

Hine, Butler Preston↗

A new second-order integration algorithm for simulating mechanical dynamic systems

A new integration algorithm which has the simplicity of Euler integration but exhibits second-order accuracy is described. In fixed-step numerical integration of differential equations for mechanical dynamic systems the method represents displacement and acceleration variables at integer step times and velocity variables at half-integer step times. Asymptotic accuracy of the algorithm is twice that of trapezoidal integration and ten times that of second-order Adams-Bashforth integration. The algorithm is also compatible with real-time inputs when used for a real-time simulation. It can be used to produce simulation outputs at double the integration frame rate, i.e., at both half-integer and integer frame times, even though it requires only one evaluation of state-variable derivatives per integration step. The new algorithm is shown to be especially effective in the simulation of lightly-damped structural modes. Both time-domain and frequency-domain accuracy comparisons with traditional integration methods are presented. Stability of the new algorithm is also examined.

Howe, R. M.↗

Message Latency Characterization of a Distributed Live, Virtual, Constructive Simulation Environment

A distributed test environment incorporating Live, Virtual, Constructive, (LVC) concepts was developed to execute standalone and integrated simulations and flight-tests that support unmanned aircraft research for NASA’s Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Project. The LVC components form the core infrastructure that supports simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing distributed assets. The LVC concepts used for the UAS in the NAS project include live aircraft, flight simulators, and virtual air traffic control assets operating at facilities distributed across multiple NASA Centers. With a distributed network, however, there is a concern that message latency could impact the realism of a simulation and its data. The latencies associated with sending data among these distributed facilities were, therefore, measured to ensure that they fall within acceptable parameters. Several live and virtual test assets were integrated into the LVC infrastructure including NASA Armstrong’s Ikhana MQ-9 unmanned aircraft, NASA Glenn’s S3-B manned aircraft, and the B747 flight simulator at NASA Ames. Average latencies from 100 to 150 milliseconds were observed between the LVC System running at NASA Ames and each of the participating NASA Centers under a light-to-moderate (fifty aircraft) traffic sample.

Murphy, James R.↗

Space Shuttle Propulsion Systems Plume Modeling and Simulation for the Lift-Off Computational Fluid Dynamics Model

This paper details advances being made in the development of Reynolds-Averaged Navier-Stokes numerical simulation tools, models, and methods for the integrated Space Shuttle Vehicle at launch. The conceptual model and modeling approach described includes the development of multiple computational models to appropriately analyze the potential debris transport for critical debris sources at Lift-Off. The conceptual model described herein involves the integration of propulsion analysis for the nozzle/plume flow with the overall 3D vehicle flowfield at Lift-Off. Debris Transport Analyses are being performed using the Shuttle Lift-Off models to assess the risk to the vehicle from Lift-Off debris and appropriately prioritized mitigation of potential debris sources to continue to reduce vehicle risk. These integrated simulations are being used to evaluate plume-induced debris environments where the multi-plume interactions with the launch facility can potentially accelerate debris particles toward the vehicle.

Strutzenberg, L. L.↗

System Engineering Strategy for Distributed Multi-Purpose Simulation Architectures

This paper describes the system engineering approach used to develop distributed multi-purpose simulations. The multi-purpose simulation architecture focuses on user needs, operations, flexibility, cost and maintenance. This approach was used to develop an International Space Station (ISS) simulator, which is called the International Space Station Integrated Simulation (ISIS)1. The ISIS runs unmodified ISS flight software, system models, and the astronaut command and control interface in an open system design that allows for rapid integration of multiple ISS models. The initial intent of ISIS was to provide a distributed system that allows access to ISS flight software and models for the creation, test, and validation of crew and ground controller procedures. This capability reduces the cost and scheduling issues associated with utilizing standalone simulators in fixed locations, and facilitates discovering unknowns and errors earlier in the development lifecycle. Since its inception, the flexible architecture of the ISIS has allowed its purpose to evolve to include ground operator system and display training, flight software modification testing, and as a realistic test bed for Exploration automation technology research and development.

Bhula, Dlilpkumar↗

Simulating Humans as Integral Parts of Spacecraft Missions

The Collaborative-Virtual Environment Simulation Tool (C-VEST) software was developed for use in a NASA project entitled "3-D Interactive Digital Virtual Human." The project is oriented toward the use of a comprehensive suite of advanced software tools in computational simulations for the purposes of human-centered design of spacecraft missions and of the spacecraft, space suits, and other equipment to be used on the missions. The C-VEST software affords an unprecedented suite of capabilities for three-dimensional virtual-environment simulations with plug-in interfaces for physiological data, haptic interfaces, plug-and-play software, realtime control, and/or playback control. Mathematical models of the mechanics of the human body and of the aforementioned equipment are implemented in software and integrated to simulate forces exerted on and by astronauts as they work. The computational results can then support the iterative processes of design, building, and testing in applied systems engineering and integration. The results of the simulations provide guidance for devising measures to counteract effects of microgravity on the human body and for the rapid development of virtual (that is, simulated) prototypes of advanced space suits, cockpits, and robots to enhance the productivity, comfort, and safety of astronauts. The unique ability to implement human-in-the-loop immersion also makes the C-VEST software potentially valuable for use in commercial and academic settings beyond the original space-mission setting.

Bruins, Anthony C.↗

Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

This presentation describes the objectives and high level setup for the human-in-the-loop simulation of the integrated surface and airsapce simulation of the ATD-2 Integrated Arrival, Departure, Surface (IADS) system. The purpose of the simulation is to evaluate the functionality of the IADS system, including tactical surface scheduler, negotiation of departure times for the flights under Traffic Management Initiatives (TMIs), and data exchange between ATC Tower and airline Ramp. The same presentation was presented to serve the experiment review prior to the simulation.

Surface↗

Simulation Technology at NASA

NASA Ames Research Center is home to several high-fidelity research flight and air-traffic control simulation facilities which, together with an experienced workforce, produce high-quality research data and findings that have proven to be applicable in the real world. These assets include the Vertical Motion Simulator (VMS), Crew Vehicle Systems Research Facility (CVSRF), Future Flight Central (FFC) air traffic control tower simulator, and several air-traffic control (ATC) simulators. The VMS combines a high-fidelity simulation capability with an adaptable simulation environment, enabling customization for numerous human-in-the-loop research applications. The distinctive feature of the VMS is its unparalleled large amplitude, high-fidelity motion capability. In over 30 years of continuous operation, the VMS has contributed significantly to the body of knowledge in a range of disciplines directly benefiting several aerospace programs and flight safety, including the design and development of flight control systems for the Joint Strike Fighter, Space Shuttle Orbiter, and rotorcraft. It continues to be used for researching new vehicle configurations, vehicle control and safety, transfer-of-training, etc., by NASA, other government agencies, and Industry.The CVSRF includes two motion-based flight simulators: a Boeing 747-400 full flight simulator and the reconfigurable Advanced Concepts Flight Simulator (ACFS). These simulators are primarily used to research air-traffic management concepts and procedures, advanced navigation and avionics concepts, and cockpit human factors. FFC is a full-sized control tower simulator with a 360-degree external field-of-view display system and reconfigurable system architecture. FFC and the ATC simulators are used for testing air-traffic management automation and decision support tools and demonstrate their feasibility in a realistic environment prior to technology transfer for implementation in the National Airspace System (NAS).To support integrated simulations and flight-tests for NASA's Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Project, NASA developed a distributed test environment incorporating Live, Virtual, Constructive, (LVC) concepts. Development of the software enabling the LVC is conducted primarily at the Distributed Simulation Research Lab (DSRL) at NASA Ames. The LVC components provide the core infrastructure supporting simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This provides the ability to conduct tests more efficiently by promoting the use of existing distributed assets. The LVC infrastructure was used in several human-in-the-loop simulations to evaluate acceptance of Detect and Avoid (DAA) advisories used by UAS pilots to maintain well clear of other virtual traffic and to negotiate maneuvers with air traffic control. It is currently being used to support testing of self-separation algorithms between unmanned and manned aircraft in live flight. Further simulations with more comprehensive air traffic scenarios mixing live and virtual aircraft is planned.In the current fiscal environment, maintaining and upgrading these high-fidelity simulation assets and retaining the skilled workforce necessary to meet future research needs is the primary non-technical challenge.

CVSRF↗

Simulation verification techniques study: Simulation performance validation techniques document

Techniques and support software for the efficient performance of simulation validation are discussed. Overall validation software structure, the performance of validation at various levels of simulation integration, guidelines for check case formulation, methods for real time acquisition and formatting of data from an all up operational simulator, and methods and criteria for comparison and evaluation of simulation data are included. Vehicle subsystems modules, module integration, special test requirements, and reference data formats are also described.

Duncan, L. M.↗

Integration of CELSS Simulation with Long-Term Crop Scheduling

This project presents guidelines for the integration of the Intelligent Crop Scheduler (ICS) developed by Leon (1995) with a version of the Biological Life Support System (BLSS) simulation based on the work by Volk and Rummel (1987). These guidelines will also aid in defining the appropriate model detail of simulation-based schedulers. ICS determines what, when and how much to plant of different crops. These decisions are made such that the critical reservoir levels are maintained close to their nominal or desired settings during the duration of the mission. Initial feasibility of the approach has been demonstrated using simplified implementations of the scheduling approach and CELSS 'world' model developed by the investigator at JSC in the Summer of 1995. The BLSS model incorporates more detail. The increased fidelity is in terms of added mass-regeneration formalism (biochemical stoichiometry), more plants, and more accurate modeling of the mechanical system. This report describes the main features of the Crop scheduler and CELSS simulator, discusses integration issues, and provides with detailed guidelines for the integration of these two applications.

Leon, V. Jorge↗

Human Systems Integration: Requirements and Functional Decomposition

This deliverable was intended as an input to the Access 5 Policy and Simulation Integrated Product Teams. This document contains high-level pilot functionality for operations in the National Airspace System above FL430. Based on the derived pilot functions the associated pilot information and control requirements are given.

Berson, Barry↗

Numerical simulation of the integrated space shuttle vehicle in ascent

A simulation of the flow about the integrated space shuttle vehicle in ascent mode has been undertaken for various flight conditions using the Chimera composite grid discretization approach. Overset body-conforming grids were used to represent each geometric component, and an implicit approximately factored finite-difference procedure was used to solve the three-dimensional thin-layer Navier-Stokes equations. The computational results have been compared with both wind tunnel and flight test data. Although relatively good agreement is obtained with the experimental data, further refinement and evaluation of numerical error is under way.

Buning, P. G.↗

Computational Nanoelectronics and Nanotechnology at NASA ARC

Both physical and economic considerations indicate that the scaling era of CMOS will run out of steam around the year 2010. However, physical laws also indicate that it is possible to compute at a rate of a billion times present speeds with the expenditure of only one Watt of electrical power. NASA has long-term needs where ultra-small semiconductor devices are needed for critical applications: high performance, low power, compact computers for intelligent autonomous vehicles and Petaflop computing technology are some key examples. To advance the design, development, and production of future generation micro- and nano-devices, IT Modeling and Simulation Group has been started at NASA Ames with a goal to develop an integrated simulation environment that addresses problems related to nanoelectronics and molecular nanotechnology. Overview of nanoelectronics and nanotechnology research activities being carried out at Ames Research Center will be presented. We will also present the vision and the research objectives of the IT Modeling and Simulation Group including the applications of nanoelectronic based devices relevant to NASA missions.

Saini, Subhash↗

Computational Nanoelectronics and Nanotechnology at NASA ARC

Both physical and economic considerations indicate that the scaling era of CMOS will run out of steam around the year 2010. However, physical laws also indicate that it is possible to compute at a rate of a billion times present speeds with the expenditure of only one Watt of electrical power. NASA has long-term needs where ultra-small semiconductor devices are needed for critical applications: high performance, low power, compact computers for intelligent autonomous vehicles and Petaflop computing technolpgy are some key examples. To advance the design, development, and production of future generation micro- and nano-devices, IT Modeling and Simulation Group has been started at NASA Ames with a goal to develop an integrated simulation environment that addresses problems related to nanoelectronics and molecular nanotecnology. Overview of nanoelectronics and nanotechnology research activities being carried out at Ames Research Center will be presented. We will also present the vision and the research objectives of the IT Modeling and Simulation Group including the applications of nanoelectronic based devices relevant to NASA missions.

Saini, Subhash↗