SEARCH · Search NASA
Results for “JWST Webb”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test at GSFC
JWST ISIM has entered into its system-level testing program at NASA Goddard Space Flight Center (GSFC). In December 2013, ISIM successfully completed the first in a series of three cryo-vacuum tests, which included two flight science instruments. Since then, there have been full-fledged efforts towards the CV2 test scheduled to finish at the end of 2014. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. In order to satisfy the program requirements, GSFC had to develop unique structural and thermal hardware to test ISIM. Most noteworthy is a helium shroud structure and cooling system built in order to achieve operational temperatures below 20K (-253C). This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) communicates the performance and challenges of the SES during the first ISIM test, and (3) summarizes the action plan to improve the system prior to the next test.
James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Electronics Compartment (IEC) Conformal Shields Composite Bond Structure Qualification Test Method
The JWST IEC conformal shields are mounted onto a composite frame structure that must undergo qualification testing to satisfy mission assurance requirements. The composite frame segments are bonded together at the joints using epoxy, EA 9394. The development of a test method to verify the integrity of the bonded structure at its operating environment introduces challenges in terms of requirements definition and the attainment of success criteria. Even though protoflight thermal requirements were not achieved, the first attempt in exposing the structure to cryogenic operating conditions in a thermal vacuum environment resulted in approximately 1 bonded joints failure during mechanical pull tests performed at 1.25 times the flight loads. Failure analysis concluded that the failure mode was due to adhesive cracks that formed and propagated along stress concentrated fillets as a result of poor bond squeeze-out control during fabrication. Bond repairs were made and the structures successfully re-tested with an improved LN2 immersion test method to achieve protoflight thermal requirements.
James Webb Space Telescope (JWST): The First Light Machine
No abstract available
James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary
JWST Integrated Science Instruments Module (ISIM) completed its system-level space simulation testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered to the next level of integration with the Optical Telescope Element (OTE), to form OTIS (OTE + ISIM), after concluding a series of three cryo-vacuum (CV) tests. During these tests, the complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration following mechanical environmental tests (vibration and acoustics). From one test to the next, shortcomings of the facility were uncovered and associated improvements in operational capabilities and reliability of the facility were required to enable the project to verify system-level requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.
James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary
JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.
Engineering History of the James Webb Space Telescope (JWST) Optical Telescope Element
Mission Objective Study the origin and evolution of galaxies, stars planetary systems. Optimized for infrared observations
James Webb Space Telescope (JWST) The First Light Machine
No abstract available
James Webb Space Telescope (JWST): The First Light Machine
No abstract available
James Webb Space Telescope (JWST): The First Light Machine
No abstract available
Optical Engineering History of the James Webb Space Telescope (JWST)
Mission Objective: Study the origin and evolution of galaxies, stars and planetary systems; Optimized for infrared observations (0.6 to 28 microns). Organization: Mission Lead, Goddard Space Flight Center; International collaboration with ESA (European Space Agency) & CSA (Canadian Space Agency); Prime Contractor, Northrop Grumman Aerospace Systems; Telescope Subcontractors, Ball Aero-pace, Harris Corp, Orbital ATK. Instruments: Near Infrared Camera (NIRCam) - University of Arizona; Near Infrared Spectrograph (NIRSpec) - ESA; Mid-Infrared Instrument (MIRI) - JPL (Jet Propulsion Lab)/ESA; Fine Guidance Sensor (FGS) - CSA; Operations: Space Telescope Science Institute (STScI). Description: Deployable telescope with 6.5-meter-diameter segmented adjustable primary mirror; Cryogenic temperature telescope and instruments for infrared performance; 50 degrees Kelvin, minus 370 degrees Fahrenheit; 5-year science mission (10-year goal).
James Webb Space Telescope (JWST) The First Light Machine
Explore the source record for details and available documents.
James Webb Space Telescope(JWST) EEE Parts Program Report
Explore the source record for details and available documents.
James Webb Space Telescope (JWST) EEE Parts Program Report
Explore the source record for details and available documents.