Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Program For Local-Area-Network Electronic Mail

MailRoom is computer program for local-area network (LAN) electronic mail. Enables users of LAN to exchange electronically notes, letters, reminders, or any sort of communication via their computers. Links all users of LAN into communication circle in which messages created, sent, copied, printed, downloaded, uploaded, and deleted through series of menu-driven screens. Includes feature that enables users to determine whether messages sent have been read by receivers. Written in Microsoft QuickBasic.

Weiner, Michael J.↗

Space Flight Operations Center local area network

The existing Mission Control and Computer Center at JPL will be replaced by the Space Flight Operations Center (SFOC). One part of the SFOC is the LAN-based distribution system. The purpose of the LAN is to distribute the processed data among the various elements of the SFOC. The SFOC LAN will provide a robust subsystem that will support the Magellan launch configuration and future project adaptation. Its capabilities include (1) a proven cable medium as the backbone for the entire network; (2) hardware components that are reliable, varied, and follow OSI standards; (3) accurate and detailed documentation for fault isolation and future expansion; and (4) proven monitoring and maintenance tools.

Goodman, Ross V.↗

Coordinating Council. Eighth Meeting: Using the Internet

This NASA Scientific and Technical Information Program Coordinating Council meeting theme was entitled 'Using Internet'. Individual topics included STI LAN migration, NSF and NREN (National Science Foundation and the National Research and Education Network), and the New NASA Headquarters LAN. Discussions are recorded for each topic and visuals are provided for STI LAN migration and NSI - NASA Science Internet.

Source record↗

Integration of the White Sands Complex into a Wide Area Network

The NASA White Sands Complex (WSC) satellite communications facility consists of two main ground stations, an auxiliary ground station, a technical support facility, and a power plant building located on White Sands Missile Range. When constructed, terrestrial communication access to these facilities was limited to copper telephone circuits. There was no local or wide area communications network capability. This project incorporated a baseband local area network (LAN) topology at WSC and connected it to NASA's wide area network using the Program Support Communications Network-Internet (PSCN-I). A campus-style LAN is configured in conformance with the International Standards Organization (ISO) Open Systems Interconnect (ISO) model. Ethernet provides the physical and data link layers. Transmission Control Protocol and Internet Protocol (TCP/IP) are used for the network and transport layers. The session, presentation, and application layers employ commercial software packages. Copper-based Ethernet collision domains are constructed in each of the primary facilities and these are interconnected by routers over optical fiber links. The network and each of its collision domains are shown to meet IEEE technical configuration guidelines. The optical fiber links are analyzed for the optical power budget and bandwidth allocation and are found to provide sufficient margin for this application. Personal computers and work stations attached to the LAN communicate with and apply a wide variety of local and remote administrative software tools. The Internet connection provides wide area network (WAN) electronic access to other NASA centers and the world wide web (WWW). The WSC network reduces and simplifies the administrative workload while providing enhanced and advanced inter-communications capabilities among White Sands Complex departments and with other NASA centers.

Boucher, Phillip Larry↗

Numerical Simulations of Homogeneous Turbulence Using Lagrangian-Averaged Navier-Stokes Equations

The Lagrangian-averaged Navier-Stokes (LANS) equations are numerically evaluated as a turbulence closure. They are derived from a novel Lagrangian averaging procedure on the space of all volume-preserving maps and can be viewed as a numerical algorithm which removes the energy content from the small scales (smaller than some a priori fixed spatial scale alpha) using a dispersive rather than dissipative mechanism, thus maintaining the crucial features of the large scale flow. We examine the modeling capabilities of the LANS equations for decaying homogeneous turbulence, ascertain their ability to track the energy spectrum of fully resolved direct numerical simulations (DNS), compare the relative energy decay rates, and compare LANS with well-accepted large eddy simulation (LES) models.

Mohseni, Kamran↗

Safety basis academy summary of project implementation from 2007-2009

During fiscal years 2007 through 2009, in accordance with Performance Based Incentives with DOE/NNSA Los Alamos Site Office, Los Alamos National Security (LANS) implemented and operated a Safety Basis Academy (SBA) to facilitate uniformity in technical qualifications of safety basis professionals across the nuclear weapons complex. The implementation phase of the Safety Basis Academy required development, delivery, and finalizing a set of 23 courses. The courses developed are capable of supporting qualification efforts for both federal and contractor personnel throughout the DOE/NNSA Complex. The LANS Associate Director for Nuclear and High Hazard Operations (AD-NHHO) delegated project responsibillity to the Safety Basis Division. The project was assigned to the Safety Basis Technical Services (SB-TS) Group at Los Alamos National Laboratory (LANL). The main tasks were project needs analysis, design, development, implementation of instructional delivery, and evaluation of SBA courses. DOE/NNSA responsibility for oversight of the SBA project was assigned to the Chief of Defense for Nuclear Safety, and delegated to the Authorization Basis Senior Advisor, Continuous Learning Chair (CDNS-ABSA/CLC). NNSA developed a memorandum of agreement with LANS AD-NHHO. Through a memorandum of agreement initiated by NNSA, the DOE National Training Center (NTC) will maintain the set of Safety Basis Academy courses and is able to facilitate course delivery throughout the DOE Complex.

99 GENERAL AND MISCELLANEOUS↗

Novel spherical hohlraum with cylindrical laser entrance holes and shields

Our recent works [K. Lan et al., Phys. Plasmas 21, 010704 (2014); K. Lan et al., Phys. Plasmas 21, 052704 (2014)] have shown that the octahedral spherical hohlraums are superior to the cylindrical hohlraums in both higher symmetry during the capsule implosion and lower backscatter without supplementary technology. However, both the coupling efficiency from the drive laser energy to the capsule and the capsule symmetry decrease remarkably when larger laser entrance holes (LEHs) are used. In addition, the laser beams injected at angles > 45° transport close to the hohlraum wall, thus the wall blowoff causes the LEH to close faster and results in strong laser plasma interactions inside the spherical hohlraums. In this letter, we propose a novel octahedral hohlraum with LEH shields and cylindrical LEHs to alleviate these problems. From our theoretical study, with the LEH shields, the laser coupling efficiency is significantly increased and the capsule symmetry is remarkably improved in the spherical hohlraums. The cylindrical LEHs take advantage of the cylindrical hohlraum near the LEH and mitigate the influence of the blowoff on laser transport inside a spherical hohlraum. The cylindrical LEHs can also be applied to the rugby and elliptical hohlraums.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

The Design of a Flexible, Interoperable Navigation Signal for Future Lunar Missions

The LunaNet Interoperability Specification (LNIS) is a set of standards currently under development by NASA, ESA, and JAXA, which define a common, interoperable set of services and interfaces for lunar communication and navigation. The LNIS includes specifications for the GNSS-like Augmented Forward Signal (AFS). The LANS (Lunar Augmented Navigation Service) will be comprised of Multiple LunaNet Service Provider (LNSP) nodes broadcasting the AFS, such as NASA’s LCRNS (Lunar Communications Relay and Navigation Systems), ESA’s Moonlight LCNS (Lunar Communication and Navigation Services) and the Japan LNSS (Lunar Navigation Satellite System). The LANS will provide a GNSS-like capability enabling orbiting and surface users in lunar space (such as Artemis) to estimate their position, velocity and time as described in Giordano et al., (2023). Initial capabilities will focus on providing service to the lunar South pole region. The specification of AFS defines two orthogonal signal components on a single carrier, with the in-phase component (AFS-I) being a lower-chip-rate data channel tailored for applications where low SWaP is critical (e.g., IoT devices or search and rescue), and the quadrature component (AFS-Q) being a high-chip-rate data-less pilot signal for high-precision, robust lunar navigation and positioning applications. An initial description of AFS was provided in the LNIS, (2023), and initial analysis results were shown in Dafesh, et al., (2024). In this work, we provide rationale for updates to the LNIS that define key aspects of the signal including the primary spreading code designs for the data and pilot channels, and a three-tiered overlay code approach for the pilot channel that provides flexible signal acquisition alternatives, rapid time dissemination and robust frame Sync. The paper also describes a robust data sync word that is designed to enable frame Sync. for low-SWaP receivers that only use the I channel, as well as a low-density parity check code (LDPC) data message encoding design and interleaving definition. The work further describes the impact of the updated AFS design in terms of improved acquisition performance, interference resistance, navigation message capabilities and rapid absolute time dissemination for users able to access clock and ephemeris data over an external network. The cross-correlation and synchronization performance of the AFS design is also compared to potential alternatives, further providing rationale for the final signal design configuration.

LANS↗

The Design of a Flexible, Interoperable Navigation Signal for Future Lunar Missions

The LunaNet Interoperability Specification (LNIS) is a set of standards currently under development by NASA, ESA, and JAXA, which define a common, interoperable set of services and interfaces for lunar communication and navigation. The LNIS includes specifications for the GNSS-like Augmented Forward Signal (AFS). The LANS (Lunar Augmented Navigation Service) will be comprised of Multiple LunaNet Service Provider (LNSP) nodes broadcasting the AFS, such as NASA’s LCRNS (Lunar Communications Relay and Navigation Systems), ESA’s Moonlight LCNS (Lunar Communication and Navigation Services) and the Japan LNSS (Lunar Navigation Satellite System). The LANS will provide a GNSS-like capability enabling orbiting and surface users in lunar space (such as Artemis) to estimate their position, velocity and time as described in Giordano et al., (2023). Initial capabilities will focus on providing service to the lunar South pole region. The specification of AFS defines two orthogonal signal components on a single carrier, with the in-phase component (AFS-I) being a lower-chip-rate data channel tailored for applications where low SWaP is critical (e.g., IoT devices or search and rescue), and the quadrature component (AFS-Q) being a high-chip-rate data-less pilot signal for high-precision, robust lunar navigation and positioning applications. An initial description of AFS was provided in the LNIS, (2023), and initial analysis results were shown in Dafesh, et al., (2024). In this work, we provide rationale for updates to the LNIS that define key aspects of the signal including the primary spreading code designs for the data and pilot channels, and a three-tiered overlay code approach for the pilot channel that provides flexible signal acquisition alternatives, rapid time dissemination and robust frame Sync. The paper also describes a robust data sync word that is designed to enable frame Sync. for low-SWaP receivers that only use the I channel, as well as a low-density parity check code (LDPC) data message encoding design and interleaving definition. The work further describes the impact of the updated AFS design in terms of improved acquisition performance, interference resistance, navigation message capabilities and rapid absolute time dissemination for users able to access clock and ephemeris data over an external network. The cross-correlation and synchronization performance of the AFS design is also compared to potential alternatives, further providing rationale for the final signal design configuration.

LunaNet↗

Theoretical investigation of La monopnictides: Electronic properties and pressure-induced phase transition

The NaCl-type La monopnictides are proper reference materials for the study of strongly correlated rare-earth pnictides. Yet, despite the simple crystal structure of this system, traditional density functional theory (DFT) calculations have dramatic failures in describing their electronic properties: DFT severely underestimates the band gaps and thus predicts incorrect transport characters of them. Here, we perform a corrected DFT calculation to rectify this failure. Our results show that LaN, LaP, and LaAs are semiconductor with band gaps of 0.82, 0.25, and 0.12 eV, respectively, and LaSb is semimetallic with an overlap of conduction and valence bands approximately 0.28 eV, in agreement with the available experiments. Additionally, under high-pressure, we find that LaN displays a new sequence of phase-transition, B1 → anti-B10 → B2, which is different from the previous theoretical predictions but consistent with the recent experiment.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Status and trends in networking at LHC Tier1 facilities

The LHC is entering its fourth year of production operation. Most Tier1 facilities have been in operation for almost a decade, when development and ramp-up efforts are included. LHC's distributed computing model is based on the availability of high capacity, high performance network facilities for both the WAN and LAN data movement, particularly within the Tier1 centers. As a result, the Tier1 centers tend to be on the leading edge of data center networking technology. In this paper, we analyze past and current developments in Tier1 LAN networking, as well as extrapolating where we anticipate networking technology is heading. Our analysis will include examination into the following areas: Evolution of Tier1 centers to their current state Evolving data center networking models and how they apply to Tier1 centers Impact of emerging network technologies (e.g. 10GE-connected hosts, 40GE/100GE links, IPv6) on Tier1 centers Trends in WAN data movement and emergence of software-defined WAN network capabilities Network virtualization

Bobyshev, A.↗

SU-F-J-13: Choosing An IMRT Technique in the Treatment of Head and Neck Cancer with Daily Localization Uncertainties

Purpose: Head and Neck cancer treatment with IMRT/VMAT has two choices: split-filed IMRT(SFI), in which the LAN is treated with a separate anterior field and the extended whole-field IMRT(WFI) in which LAN is included with the IMRT/VMAT field. This study shows that under the same dose limit criteria, choosing the technique becomes a critical issue if daily localization and immobilization altered the dose distribution. Methods: Nine common head-and-neck cancer cases were chosen to illustrate how the daily localization and immobilization uncertainties affect to choose between SFI and WFI. Both SFI and WFI at upper target coverage were generated with VMAT. For each case, the same planning criteria were applied to the target and critical structures; therefore, similar target coverage and dose falloff can be observed in both techniques. Thirty days of kV cone beam CT(CBCT) images on each case were also delineated with contralateral and ipsilateral target as well as larynx as critical structure. About 300 CBCT images with daily delivered doses were analyzed and compared in a form of dose-volume histograms. Results: While both plans for SFI and WFI with VMAT planning utilized and meet the criteria of D95>prescription dose and for not-involved larynx with mean dose <35Gy and V55<10%, the daily localization and immobilization has a great contribution to the resulted dose delivery. With WFI, the better daily contralateral and ipsilateral neck target coverage can reflect a simpler or shorter localization; however, a much superior avoidance (WFI: mean dose a 42.5Gy; SFI: mean dose a 18.9Gy) of the non-involved larynx from the SFI is preferred. Conclusion: Dosimetrically, SFI and WFI are equally well for head and Neck cancer treatment with VMAT technique; however, if considering the contribution of daily localization(CBCT) method uncertainties, SFI is better with sparing non-involved larynx and WFI has better target coverage.

60 APPLIED LIFE SCIENCES↗

Winter and Breeding Bird Surveys at Los Alamos National Laboratory Progress Report for 2010 to 2012

Los Alamos National Security, LLC (LANS) biologists on the Resources Management Team at Los Alamos National Laboratory (LANL) initiated a multi-year monitoring program for migratory birds in Fiscal Year (FY) 2011 to implement the Biological Resources Management Plan and to comply with Federal laws, Executive Orders, and regulations related to migratory birds. The objective of this on-going study is to monitor patterns and trends of bird abundance and richness over time at LANL. LANS biologists completed a second year of surveys in the winter of 2011 and the summer of 2012. Four habitat types were surveyed for this project and they included 1) mixed conifer forest, 2) ponderosa pine forest, 3) pinyon-juniper woodland and 4) riparian/wetland. Transects were 2.0 to 2.5 kilometers (km) in length and contained nine survey points spaced approximately 250 meters (m) apart. Winter surveys took place in each of the four habitat types in December, January, and February. The summer breeding bird surveys were conducted in each of the four habitat types in May, June, and July.

Basic Biological Sciences(59)↗

2012 Los Alamos National Laboratory Hazardous Waste Minimization Report

Waste minimization and pollution prevention are inherent goals within all the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE) and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit, which was issued in November 2010. This report describes the hazardous waste minimization program (a component of the overall Waste Minimization/Pollution Prevention [WMin/PP] Program) administered by the Environmental Stewardship Group (ENV-ES). This report also supports the waste minimization and pollution prevention goals of the Environmental Programs Directorate (EP) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures.

54 ENVIRONMENTAL SCIENCES↗

FLC Nomination: Carole Rutten

STEM Mentorship Award: Given to an individual who may or may not be a direct employee of a government laboratory or facility in the Mid Continent Region, but has demonstrated exceptional character, mentorship, and creativity in the areas of science and math or by promoting the development of young people in grades K-12 or higher in technical career fields. Contributions must be unique and show measurable benefit to the laboratory, school system/students and must have occurred within the past three calendar years. Los Alamos National Laboratory (LANL) would like to nominate Carole Rutten for the FLC STEM Mentorship Award. Carole has been responsible for the Los Alamos National Security, LLC (LANS) Institutional Education Investments since 2007. In 2012, Carole initiated and led the review of the education programs and investments’ impact in Northern New Mexico. An Education Impact Study conducted in 2010 indicated that there was an abundance of STEM Programs for kindergarten through sixth grade (K-6) students, but relatively few STEM Programs existed for students in middle school and beyond. To address this gap, Carole worked with LANS to focus its education investments on programs for middle and high school students to better prepare them for collegiate studies leading to STEM careers.

99 GENERAL AND MISCELLANEOUS↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Los Alamos National Security, LLC Request for Information from industrial entities that desire to commercialize Laboratory-developed Extremely Low Resource Optical Identifier (ELROI) tech

Los Alamos National Security, LLC (LANS) is the manager and operator of the Los Alamos National Laboratory for the U.S. Department of Energy National Nuclear Security Administration under contract DE-AC52-06NA25396. LANS is a mission-centric Federally Funded Research and Development Center focused on solving the most critical national security challenges through science and engineering for both government and private customers.

47 OTHER INSTRUMENTATION↗