Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Transverse BBU Suppression with Feedback for Energy-Recovery Linacs

The Electron–Ion Collider (EIC) achieves its design luminosity by cooling the ion beam with a high-current electron beam generated in an energy-recovery linac (ERL). The baseline ERL lattice employs a BNL five-cell cavity that is frequency-scaled to 197 MHz, 591 MHz, and 1.773 GHz, raising concerns about multibunch beam-breakup (BBU) instabilities. Threshold currents for each frequency option are established with two independent BBU tracking codes, providing cross-validated operating margins that guide cavity selection. To further increase the current limit, we incorporate a digital transverse feedback (FB) system that targets the dominant higher-order modes (HOMs). Simulations show the FB raises the BBU threshold by roughly an order of magnitude: power-spectral-density analysis of the beam centroid at the linac exit confirms strong suppression of the aliased HOM peak, although some spectral growth appears at secondary frequencies. This combined study quantifies baseline BBU limits, demonstrates effective active mitigation, and charts a practical path toward robust, high-current operation of the EIC ERL.

Accelerator Physics↗

BEAM COLLIMATION IN THE PIP-II LINAC TO BOOSTER TRANSFER LINE

The new PIP-II superconducting linac will deliver a 2 mA average H⁻ beam to the existing Booster synchrotron. The injected beam is accumulated by charge exchange over approximately 300 turns; phase space painting is used to mitigate space charge effects. To limit the power load on the internal waste beam absorber from the transverse tails of the H⁻ distribution missing the foil, the beam will be collimated in both planes in the linac to Booster transfer line using compact collimators of a novel design. Both the number of parasitic hits and the fraction of the beam missing the foil are sensitive functions of the H⁻ beam centroid position with respect to the edge of the foil. The positioning of the collimation is constrained by the availability of suitable space in the transfer line lattice, by specifics of the collimator design, by the phase space orientation at the collimator, and by the betatron phase advance to the foil needed to achieve proper orientation of the spatial distribution at the injection point. In this contribution, we describe the procedure by which collimator positions were optimized. We then discuss the expected performance of the overall system.

Johnson, David E.↗

PIP-II 800 MeV Proton Linac Beam Pattern Generator

The PIP2 IT Beam Pattern Generator is the system that synchronizes beam injection and the RF systems between the PIP2 LINAC to the Booster. The RF frequencies of these two accelerator systems are not harmonically related. Synchronization is accomplished by controlling two MEBT Beam Choppers, which select 162.5MHz beam bunches from the LEBT and RFQ to produce an appropriate reduced beam bunch pattern that enables bucket-to-bucket transfer to the Booster RF at 46.46MHz (84th harmonic). This chopping pattern also reduces the beam current to an average of 2mA over the Booster injection, matching the Linac nominal beam current. The BPG also generates the RF frequency/phase reference which the Booster will phase lock to during injection. The BPG is fully programmable, allowing for arbitrary beam patterns with adjustable timing parameters, having a fine adjustment resolution of 38ps. The latter is accomplished using digital signal processing techniques. This paper discusses the design of the BPG, its construction, test results, and operational experience after being integrated into the PIP2 IT test accelerator and concludes with a discussion of the system’s performance and future plans.

43 PARTICLE ACCELERATORS↗

Study of Conduction-Cooled Superconducting Quadrupole Magnets Combined with Dipole Correctors for the ILC Main Linac

A superconducting rf (SRF) cryomodule for International Linear Collider(ILC) Main Linac equips focus/steering magnets. The magnets are "superferric" magnets with four superconducting (SC) race track coils conductively cooled from the cryomodule LHe supply pipe. The quadrupole field gradient and dipole field are 40 T/m and 0.1 T, respectively. The magnet length and iron-pole radius are 1 m and 0.045 m, respectively. It is known that dark current is generated at SRF cavities and accelerated through the following linac string. The dark current reaches and heats the SC magnets. It is estimated that the power deposition in the magnet may reach more than a few watts and temperature of the SC coils may locally reach to critical temperature of NbTi. It is important to make the magnet not reach quench with sufficient conduction cooling. We aim to realize the SC magnet which can stably operate under such condition. We plan to develop test coils made of three types of SC materials, NbTi, Nb₃Sn, and MgB₂ and study thermal characteristics and stability . We will develop a short model magnet, based on the test coil results. Here, we will present the magnet design study and the R&D plan.

43 PARTICLE ACCELERATORS↗

Space charge dominated momentum spread and compensation strategies in the post-linac section of Proton Improvement Plan-II at Fermilab

The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster synchrotron. To mitigate the space charge tune shift associated with a high intensity accumulated beam, the low emittance linac beam is used to paint the ring phase space both transversely and longitudinally. To prevent losses caused by particles injected outside the rf separatrix while painting longitudinal phase space, the momentum spread of the incoming beam should not exceed 2.1 x 10^-4. Detailed simulations showed that due to space charge, the rms momentum spread increases to 4 x 10^-4 while it is transported in the BTL --about twice the allowable limit. In this paper, we outline a mitigation strategy involving a debuncher cavity. We discuss location, operating frequency, and gap voltage under both nominal and perturbed beam conditions, specifically accounting for momentum jitter. The impact of cavity misalignments is also assessed. The paper concludes by recommending an optimized configuration.

43 PARTICLE ACCELERATORS↗

A Preliminary Feasibility Study on Multi-Cavity Cryomodule Integration for the Electron Ion Collider Energy Recover Linac Cooler

The Electron-Ion Collider (EIC) is a state-of-the-art accelerator designed for collisions between highly polarized electrons and ions. To achieve optimal luminosity, the ion beam is cooled using an electron beam sourced from an energy recovery linac (ERL). In the current ERL baseline design, one BNL type RF cavity is used per cryomodule, leading to spatial and cost challenges. This study examines the feasibility of using more compact PERLE (Powerful Energy Recovery Linac for Experiments) type cavities, which can house multiple cavities within a single cryomodule, by evaluating their Beam Breakup (BBU) instability performance. Higher Order Modes (HOM) parameters were obtained through frequency scaling, assuming constant quality factor Q_L, R/Q, and linearly scaling HOM frequencies. To predict the BBU threshold current and ensure accuracy, two different BBU tracking simulations are used for cross-verification. Although the reduced footprint of PERLE-type cavities is advantageous, maintaining sufficient damping of HOMs remains crucial. Finally, we compare the HOM damping efficiency of both cavity types and suggest a pathway forward.

Deitrick, K.↗

Upgrade to Fixed and Translating Scintillation-based Loss Detector System in the Fermilab Drift Tube Linac

The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and operational assessment of Drift Tube Linac performance, scintillator-based loss monitors were previously installed along the exterior of the first two accelerating cavities to assess low energy beam losses. Here we present a recent upgrade to the loss monitor system, including significant improvements in analog signal processing to address baseline-interfering noise; digitization of the signals to enable regular operational use and tuning; and a new remote operation upgrade of the translating loss monitor with precise positioning of the loss monitor along its nine-foot track. Data from the fixed and translating detectors collected under varying beam conditions validate the utility of the upgrade.

Chen, E. V. [Fermilab]↗

Linac to BAR/RCS transfer line design for EIC electron injection system

A transfer line has been designed for the Electron-Ion Collider (EIC) to transport electron bunches from the linac to the Rapid Cycling Synchrotron (RCS). In its initial operational stage, the line accommodates 1 nC electron bunches directly from the linac. To support a future upgrade involving a Beam Accumulator Ring (BAR), which will stack individual bunches to form high-charge 28 nC bunches, the design incorporates two switching dipoles enabling injection into and extraction from the BAR. Additionally, a beam dump has been included for operational flexibility and safety. The final segment of the line interfaces with the RCS through a modified Penner bend, preserving beam quality while satisfying geometric constraints. This layout ensures compatibility with both current and future operational modes of the EIC injection system.

Accelerator Physics↗

Acceptance Calculation and Study of Fault Scenarios in the PIP-II Linac

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The acceptance of an accelerator outlines its sensitivity against deviations from its nominal design parameters. Consequently, a higher acceptance minimizes possibility of the beam loss. This paper presents longitudinal and transverse acceptance of the PIP-II SRF linac. Furthermore, paper also discusses implications of fault scenarios, such as the cavity failure, on the beam optics and acceptances.

43 PARTICLE ACCELERATORS↗

Beam Losses for the PIP-III Linac to Recycler/Main Injector

The PIP-III linac produces 8 GeV H - beam for injection into the Recycler or Main Injector (MI). Beam losses throughout the system must remain low to ensure high intensity in the MI cycle and to manage radiation effects to acceptable levels, including enabling practical maintenance of the facility. Beam loss mechanisms in the system mageable maintStripping to H+ is needed, in a system that is vulnerable to magnetic stripping of H- in magnetic fields. The High power beam will heat stripping foils, perhaps unacceptably. The injection pulse is much longer than the MI circumference, so multiturn pulses with resulting heating and beam diffusion are required. We discuss beam loss related design considerations for the Linac-based scenario.

43 PARTICLE ACCELERATORS↗

Front shielding of the 25-kW beam absorber in Linac-to-Booster transfer line

The 25-kW beam absorber in the Linac-to-Booster transfer line is supposed to take in the beam from PIP-II 800-MeV Linac occasionally, on the average for one hour once a week. Such an operational scenario suggests that residual dose of the absorber front part can be relatively low. In order to simplify access to the front part of the absorber and beam window in case of repair or maintenance, using a slide-in shielding plug is considered as a preferred option.

43 PARTICLE ACCELERATORS↗

Exploring the Dynamics of Transverse Inter-planar Coupling in the SC Section of the PIP-II Linac

This study investigates the crucial role that an accurate understanding of inter-planar coupling in the transverse plane plays in regulating charged particle dynamics in a high-intensity linear accelerator and minimizing foil/septum impacts during injection from the linac to a ring. We in-depth analyze the emergence and evolution of transverse inter-planar coupling through multiple active lattice elements, taking into account space charge and field nonlinearities in the superconducting section of the PIP-II linac. The article compares various analytical, numerical, and experimental techniques for measuring transverse coupling using beam and lattice matrices and provides insight into effective strategies for its mitigation prior to ring injection.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Space Charge Dominated Momentum Spread and Compensation Strategies in the Post-Linac Section of Proton Improvement Plan-II at Fermilab

The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a Beam Transfer Line (BTL) that channels the beam from the linac exit to the booster. In the absence of longitudinal focusing beyond the superconducting linac, the beam experiences an elevated momentum spread, primarily due to nonlinear space-charge forces, surpassing the allowable limit of 2.1e-4. This study presents a detailed examination of the space-charge-induced momentum spread and outlines mitigative strategies. The investigation includes the fine-tuning of a de-buncher cavity, analyzed in terms of operating frequency, longitudinal location, and gap voltage, under both standard and perturbed beam conditions—specifically accounting for momentum jitter and energy variation. The impact of buncher cavity misalignments on the beam's longitudinal phase space is also assessed. The paper concludes by recommending an optimized cavity configuration to effectively mitigate the observed increase in momentum spread along the BTL.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LINAC Electrical Cabinets - Structural Analysis

Along LINAC s downstream path is a floor containing various cabinets above the LINAC. Of the dozens of cabinets are 4 specific cabinet types: PNF Modulator, PNF Power Supply, Water Skid, and Marx. Each of these cabinets may contain some of the various contents that include electronics, wiring, pipelines, circuits, and conduits. Lab Technicians perform maintenance and inspections of the cabinets and need to access every part, including the top section that is subject to the weight of the technician standing on top. To ensure the cabinet is structurally safe, a CAD model will be developed for each cabinet and a Finite Element Analysis (FEA) will be performed on each cabinet to confirm it is safe to stand on.

Blas, Efren↗

LINAC Longitudinal Simulation and Measurement of Output Energy

The Fermilab Linac, a pivotal and historic accelerator at Fermilab, is crucial to the laboratory's operations, supplying a 400 MeV beam to various acceleration facilities. Due to daily variations in the Linac's output energy, precise monitoring and machine tuning are important to ensure the exiting energy meets the Booster's acceptance criteria. To address this, Beam Position Monitors (BPMs) are employed to assess and adjust the beam's energy, providing essential data on both the transverse position and longitudinal phase of the beam. We also aim to regulate the longitudinal phase profile to match our simulation predictions. By utilizing a Python-based simulation and beam data from three BPMs, we can determine the optimal phasing correction required for the final RF stage to achieve the desired energy. Currently, the calculations of longitudinal phase profile are based on simulations, so additional research is needed to verify if the predicted longitudinal phase distribution aligns with actual real-world data.

Safaryan, Milena↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H- ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 s pulses to drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50 % of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

Jones, Daniel C.↗

GRIDDED RF GUN DESIGN FOR SRF LINAC APPLICATIONS

The thermionic gridded gun is described which gener-ates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measure-ments, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current inter-ception in the SRF cavity.

Gonin, I.↗

Warm Front End Upgrade for the PIP-II Linac

The warm front end for the PIP-II Linac consists of an Ion-source, an RFQ, and four buncher cavities. The LLRF systems for these were the first ones developed more than a decade ago for use at the test stands. Some were VXI crate based, and others used early generation FPGA boards that are light in resources. These LLRF systems and the one for the first superconducting cryomodule, the HWR will be upgraded with the ARRIA 10 SOC-FPGA chassis with EPICS interfaces like the rest of the PIP-II Linac. The RFQ and the HWR have unique resonance control systems which are integrated into the LLRF controller hardware. The results of the initial testing with a cavity emulator will be presented.

Reyes, Lennon [Fermilab] (ORCID:0009000891155652)↗