Search NASASearch

SEARCH · Search NASA

Results for “Launch Pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

135 records · Page 4

Nickel-hydrogen battery testing for Hubble Space Telescope

The authors identify objectives and provide data from several nickel-hydrogen battery tests designed to evaluate the possibility of launching Ni-H2 batteries on the Hubble Space Telescope (HST). Test results from a 14-cell battery, a 12-cell battery, and a 4-cell pack are presented. Results of a thermal vacuum test to verify the battery-module/bay heat rejection capacity are reported. A 6-battery system simulation breadboard is described, and test results are presented.

Baggett, Randy M.

Hubble space telescope onboard battery performance

The performance of six 88 Ah Nickel-Hydrogen (Ni-H2) batteries that are used onboard in the Hubble Space Telescope (Flight Spare Module (FSM) and Flight Module 2 (FM2)) is discussed. These batteries have 22 series cells per battery and a common bus that would enable them to operate at a common voltage. It is launched on April 24, 1990. This paper reviews: the cell design, battery specification, system constraints, operating parameters, onboard battery management, and battery performance.

Rao, Gopalakrishna M.

Hubble Space Telescope On-orbit NiH2 Battery Performance

This paper summarizes the Hubble Space Telescope (HST) nickel-hydrogen (NiH2) battery performance from launch to the present time. Over the life of HST vehicle configuration, charge system degradation and failures together with thermal design limitations have had a significant effect on the capacity of the HST batteries. Changes made to the charge system configuration in order to protect against power system failures and to maintain battery thermal stability resulted in undercharging of the batteries. This undercharging resulted in decreased usable battery capacity as well as battery cell voltage/capacity divergence. This cell divergence was made evident during on-orbit battery capacity measurements by a relatively shallow slope of the discharge curve following the discharge knee. Early efforts to improve the battery performance have been successful. On-orbit capacity measurement data indicates increases in the usable battery capacity of all six batteries as well as improvements in the battery cell voltage/capacity divergence. Additional measures have been implemented to improve battery performance, however, failures within the HST Power Control Unit (PCU) have prevented verification of battery status. As this PCU fault prevents the execution of on-orbit capacity testing, the HST Project has based the battery capacity on trends, which utilizes previous on-orbit battery capacity test data, for science mission and servicing mission planning. The Servicing Mission 38 (SM-3B) in March 2002 replaced the faulty PCU. Following the servicing mission, on-orbit capacity test resumed. A summary of battery performance is reviewed since launch in this paper.

Rao, Gopalakrishna M.

Air Force Phillips Laboratory Battery Program overview

Battery development and testing efforts at Phillips Laboratory fall into three main categories: nickel hydrogen, sodium sulfur, and solid state batteries. Nickel hydrogen work is broken down into a Low Earth Orbit (LEO) Life Test Program, a LEO Pulse Test Program, and a Hydrogen Embrittlement Investigation. Sodium sulfur work is broken down into a Geosynchronous Earth Orbit (GEO) Battery Flight Test and a Hot Launch Evaluation. Solid state polymer battery work consists of a GEO Battery Development Program, a Pulse Power Battery Small Business Innovation Research (SBIR), and an in-house evaluation of current generation laboratory cells. An overview of the program is presented.

House, Shaun

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Returning an Entire Near-Earth Asteroid in Support of Human Exploration Beyond Low-Earth Orbit

This paper describes the results of a study into the feasibility of identifying, robotically capturing, and returning an entire Near-Earth Asteroid (NEA) to the vicinity of the Earth by the middle of the next decade. The feasibility of such an asteroid retrieval mission hinges on finding an overlap between the smallest NEAs that could be reasonably discovered and characterized and the largest NEAs that could be captured and transported in a reasonable flight time. This overlap appears to be centered on NEAs roughly 7 m in diameter corresponding to masses in the range of 250,000 kg to 1,000,000 kg. The study concluded that it would be possible to return a approx.500,000-kg NEA to high lunar orbit by around 2025. The feasibility is enabled by three key developments: the ability to discover and characterize an adequate number of sufficiently small near-Earth asteroids for capture and return; the ability to implement sufficiently powerful solar electric propulsion systems to enable transportation of the captured NEA; and the proposed human presence in cislunar space in the 2020s enabling exploration and exploitation of the returned NEA. Placing a 500-t asteroid in high lunar orbit would provide a unique, meaningful, and affordable destination for astronaut crews in the next decade. This disruptive capability would have a positive impact on a wide range of the nation's human space exploration interests. It would provide a high-value target in cislunar space that would require a human presence to take full advantage of this new resource. It would offer an affordable path to providing operational experience with astronauts working around and with a NEA that could feed forward to much longer duration human missions to larger NEAs in deep space. It represents a new synergy between robotic and human missions in which robotic spacecraft would retrieve significant quantities of valuable resources for exploitation by astronaut crews to enable human exploration farther out into the solar system. The capture, transportation, examination, and dissection of an entire NEA would provide valuable information for planetary defense activities that may someday have to deflect a much larger near-Earth object. Transportation of the NEA to lunar orbit with a total flight time of 6 to 10 years would be enabled by a ~40-kW solar electric propulsion system with a specific impulse of 3,000 s. The flight system could be launched to low-Earth orbit (LEO) on a single Atlas V-class launch vehicle, and return to lunar orbit a NEA with at least 28 times the mass launched to LEO. Longer flight times, higher power SEP systems, or a target asteroid in a particularly favorable orbit could increase the mass amplification factor from 28-to-1 to 70-to-1 or greater. The NASA GRC COMPASS team estimated the full life-cycle cost of an asteroid capture and return mission at approx.$2.6B.

asteroid mining

Manned Mars Systems Study

A study is underway to determine attractive system options, perform trade studies, and provide comparative data for astronaut missions to Mars. Because of an emphasis in this work on deriving requirements and candidates for the transportation and facility infrastructure for such missions, all relevant technologies and mission constraints are also being considered. These include on-orbit assembly, trajectory type, launch opportunities, propellant storage, crew size, cabin pressure, artificial gravity, life-support systems, radiation hazards, power/energy storage, thermal control, human factors, communications, abort scenarios, landing techniques, exploration strategies and science activities. It is planned to scope several example missions and to identify enabling and significantly enhancing technologies for accomplishing the goals of the human exploration of Mars.

Benton C Clark

Ulysses navigation

Ulysses, a cooperative NASA and ESA project, measures charged and neutral particles, magnetic fields, and electromagnetic wave emissions from the Sun's polar regions and the out of elliptic heliospheric environment. ESA supplied the spacecraft and one half of the instruments, and is in control of the spacecraft and its attitude. NASA supplied the power supply, one half of the instruments, the launch vehicle, and tracks the spacecraft and performs the navigation. Orbit determination results mapped to the time of Jupiter's arrival show improved accuracy and consistency over the course of the mission to date. Solar radiation pressure model uncertainties are major contributors to orbit determination errors, but are being estimated more accurately as data are accumulated.

H. J. Gordon

Laser Beam Welding Advancements for In-Space Servicing, Assembly, and Manufacturing

NASA is currently working to develop in-space servicing, assembly, and manufacturing (ISAM) capabilities for low Earth orbit and the lunar surface. One crucial technology for this effort is laser beam welding. Laser systems can perform joining, cleaning, cutting, and repair activities, which will enable the construction of large in-space structures that could not fit on a single launch vehicle, such as trusses for solar panels, radiators, or communications infrastructure. Multiple projects studying laser welding for space applications are currently underway at NASA Marshall Space Flight Center. One of these, the DIsk-Shaped Configurable and Modular vAcuum uNit (DISCMAN), is a compact vacuum chamber designed to support parameter development for laser welding in microgravity. It contains a rotating platen with weld samples made from aluminum, steel, and titanium, a high-power infrared laser, and integrated pumps for pulling vacuum inside the sample cartridge. The DISCMAN payload is planned to launch to the International Space Station, where welds will be performed under sustained microgravity inside the Bishop Airlock. Another effort underway at Marshall is the Lunar Assembly and Servicing by Autonomous Robotics (LASAR) initiative. This project uses a space-rated robotic arm equipped with a laser weld head, wire feeder, and multiple cameras to perform welds in a thermal vacuum chamber simulating the lunar surface environment. Some of these welds are done on snowflake joints, which are specially designed to slot together to join segments of trussN structures, allowing for the construction of tall surface infrastructure. DISCMAN, LASAR, and other projects are being carried out to advance the technological maturity of in-space laser beam welding, collect data to inform computational models, and learn reliable processes for creating weld joints in space. This work supports NASA’s greater goals to expand humanity’s presence in low Earth orbit, establish a permanent moon base, and eventually send crewed missions to Mars and beyond.

Robotics

Laser Beam Welding Advancements for In-Space Servicing, Assembly, and Manufacturing

NASA is currently working to develop in-space servicing, assembly, and manufacturing (ISAM) capabilities for low Earth orbit and the lunar surface. One crucial technology for this effort is laser beam welding. Laser systems can perform joining, cleaning, cutting, and repair activities, which will enable the construction of large in-space structures that could not fit on a single launch vehicle, such as trusses for solar panels, radiators, or communications infrastructure. Multiple projects studying laser welding for space applications are currently underway at NASA Marshall Space Flight Center. One of these, the DIsk-Shaped Configurable and Modular vAcuum uNit (DISCMAN), is a compact vacuum chamber designed to support parameter development for laser welding in microgravity. It contains a rotating platen with weld samples made from aluminum, steel, and titanium, a high-power infrared laser, and integrated pumps for pulling vacuum inside the sample cartridge. The DISCMAN payload is planned to launch to the International Space Station, where welds will be performed under sustained microgravity inside the Bishop Airlock. Another effort underway at Marshall is the Lunar Assembly and Servicing by Autonomous Robotics (LASAR) initiative. This project uses a space-rated robotic arm equipped with a laser weld head, wire feeder, and multiple cameras to perform welds in a thermal vacuum chamber simulating the lunar surface environment. Some of these welds are done on snowflake joints, which are specially designed to slot together to join segments of trussN structures, allowing for the construction of tall surface infrastructure. DISCMAN, LASAR, and other projects are being carried out to advance the technological maturity of in-space laser beam welding, collect data to inform computational models, and learn reliable processes for creating weld joints in space. This work supports NASA’s greater goals to expand humanity’s presence in low Earth orbit, establish a permanent moon base, and eventually send crewed missions to Mars and beyond.

Manufacturing

Battery Control Boards for Li-Ion Batteries on Mars Exploration Rovers

Rechargeable Lithium-ion batteries have been operating successfully on both Spirit and Opportunity rovers for the last two years, which includes six months of Assembly Launch and Test Operations (ATLO), seven months of cruise and about eleven months of surface operations. The Battery Control Boards designed and fabricated in-house would protect cells against overcharge and over-discharge and provide cell balance. Their performance has thus far been quite satisfactory. The ground data o the mission simulation battery project little capacity loss of less than 3% during cruise and 180 sols. Batteries are poised to extend the mission beyond six months, if not a couple of years.

Ewell, R.

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

NRHO

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design

Mars Sample Retrieval Lander Thermal Protection System Design

The Mars Sample Return (MSR) Sample Retrieval Lander (SRL) was slated to launch in 2031 and enter Mars’ atmosphere after a 15-month cruise. After several iterations of vehicle design and trajectories, the latest mission architecture included a 4.72-meter diameter entry capsule entering the Martian atmosphere at 8 km/s, marking a 3.5x increase in kinetic energy when entering the atmosphere in comparison to Mars 2020. Designed to be the heaviest and fastest vehicle to enter Mars’ atmosphere, SRL required slim mass margins, and as such, the thermal protection system (TPS) design methodology needed to be tailored appropriately. The entry capsule aeroshell is composed of a heatshield, backshell, parachute support cone, and parachute lid, as shown in Fig. 1.

Hannah Alpert

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris

The Active Asteroids Citizen Science Program: Overview and First Results

Abstract We present the Citizen Science program Active Asteroids and describe discoveries stemming from our ongoing project. Our NASA Partner program is hosted on the Zooniverse online platform and launched on 2021 August 31, with the goal of engaging the community in the search for active asteroids—asteroids with comet-like tails or comae. We also set out to identify other unusual active solar system objects, such as active Centaurs, active quasi-Hilda asteroids (QHAs), and Jupiter-family comets (JFCs). Active objects are rare in large part because they are difficult to identify, so we ask volunteers to assist us in searching for active bodies in our collection of millions of images of known minor planets. We produced these cutout images with our project pipeline that makes use of publicly available Dark Energy Camera data. Since the project launch, roughly 8300 volunteers have scrutinized some 430,000 images to great effect, which we describe in this work. In total, we have identified previously unknown activity on 15 asteroids, plus one Centaur, that were thought to be asteroidal (i.e., inactive). Of the asteroids, we classify four as active QHAs, seven as JFCs, and four as active asteroids, consisting of one main-belt comet (MBC) and three MBC candidates. We also include our findings concerning known active objects that our program facilitated, an unanticipated avenue of scientific discovery. These include discovering activity occurring during an orbital epoch for which objects were not known to be active, and the reclassification of objects based on our dynamical analyses.

Astronomy & Astrophysics

Deployment and retrieval mechanism redesigned for Spartan spacecraft on the STS

The Spartan Release Engage Mechanism (REM) is a system designed to restrain the Spartan spacecraft during Space Transportation System (STS) launch and landing. The mechanism is designed to allow deployment and retrieval of the Spartan free flyer spacecraft from the shuttle payload bay. Because current Spartan spacecraft payloads are much heavier than payloads intended for the original REM, an extensive redesign, analysis, and test program was necessary. Also, increased emphasis on safety in the post-Challenger era prompted a reevaluation of possible failures. Much of the design effort focused on improving the latch mechanism gearbox. Key concerns were effective gear lubrication, thermal gradients at the gearbox mounts, operation at thermal extremes, and gear-train failure contingencies. Increased concern for reliability led to the design of an Extra Vehicular Activity (EVA) backup latch system.

Greg Galloway