Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leasing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Proceedings of the North Aleutian Basin information status and research planning meeting.

The North Aleutian Basin Planning Area of the Minerals Management Service (MMS) is a large geographic area with significant ecological and natural resources. The Basin includes most of the southeastern part of the Bering Sea continental shelf including all of Bristol Bay. The area supports important habitat for a wide variety of species and globally significant habitat for birds and marine mammals including federally listed species. Villages and communities of the Alaska Peninsula and other areas bordering or near the Basin rely on its natural resources (especially commercial and subsistence fishing) for much of their sustenance and livelihood. The offshore area of the North Aleutian Basin is considered to have important hydrocarbon reserves, especially natural gas. In 2006, the MMS released a draft proposed program, Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012 and an accompanying draft programmatic environmental impact statement (EIS). The draft proposed program identified two lease sales proposed in the North Aleutian Basin in 2010 and 2012, subject to restrictions. The area proposed for leasing in the Basin was restricted to the Sale 92 Area in the southwestern portion. Additional EISs will be needed to evaluate the potential effects of specific lease actions, exploration activities, and development and production plans in the Basin. A full range of updated multidisciplinary scientific information will be needed to address oceanography, fate and effects of oil spills, marine ecosystems, fish, fisheries, birds, marine mammals, socioeconomics, and subsistence in the Basin. Scientific staff at Argonne National Laboratory (Argonne) were contracted to assist the MMS Alaska Outer Continental Shelf (OCS) Region in identifying and prioritizing information needs related to the North Aleutian Basin and potential future oil and gas leasing and development activities. The overall approach focused on three related but separate tasks: (1) identification and gathering of relevant literature; (2) synthesis and summary of the literature; and (3) identification and prioritization of information needs. To assist in gathering this information, MMS convened the North Aleutian Basin Information Status and Research Planning Meeting, held in Anchorage, Alaska, from November 28 through December 1, 2006; this report presents a summary of that meeting. The meeting was the primary method used to gather input from stakeholders and identify information needs and priorities for future inventory, monitoring, and research related to potential leasing and oil and gas developments in the North Aleutian Basin.

02 PETROLEUM↗

Two-Way Option Contracts That Facilitate Adaptive Water Reallocation in the Western United States

Many water markets in the western United States (U.S.) have the ability to reallocate water temporarily during drought, often as short-term water rights leases from lower value irrigated activities to higher value urban uses. Regulatory approval of water transfers, however, typically takes time and involves high transaction costs that arise from technical and legal analyses, discouraging short-term leasing. This leads municipalities to protect against drought-related shortfalls by purchasing large volumes of infrequently used permanent water rights. High transaction costs also result in municipal water rights rarely being leased back to irrigators in wet or normal years, reducing agricultural productivity. This research explores the development of a multi-year two-way option (TWO) contract that facilitates leasing from agricultural-to-urban users during drought and leasing from urban-to agricultural users during wet periods. The modeling framework developed to assess performance of the TWO contracts includes consideration of the hydrologic, engineered, and institutional systems governing the South Platte River Basin in Colorado where there is growing competition for water between municipalities (e.g., the city of Boulder) and irrigators. The modeling framework is built around StateMod, a network-based water allocation model used by state regulators to evaluate water rights allocations and potential rights transfers. Results suggest that the TWO contracts could allow municipalities to maintain supply reliability with significantly reduced rights holdings at lower cost, while increasing agricultural productivity in wet and normal years. Additionally, the TWO contracts provide irrigators with additional revenues via net payments of option fees from municipalities.

54 ENVIRONMENTAL SCIENCES↗

Literature and information related to the natural resources of the North Aleutian Basin of Alaska.

The North Aleutian Basin Planning Area of the Minerals Management Service (MMS) is a large geographic area with significant natural resources. The Basin includes most of the southeastern part of the Bering Sea Outer Continental Shelf, including all of Bristol Bay. The area supports important habitat for a wide variety of species and globally significant habitat for birds and marine mammals, including several federally listed species. Villages and communities of the Alaska Peninsula and other areas bordering or near the Basin rely on its natural resources (especially commercial and subsistence fishing) for much of their sustenance and livelihood. The offshore area of the North Aleutian Basin is considered to have important hydrocarbon reserves, especially natural gas. In 2006, the MMS released a draft proposed program, 'Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012' and an accompanying draft programmatic environmental impact statement (EIS). The draft proposed program identified two lease sales proposed in the North Aleutian Basin in 2010 and 2012, subject to restrictions. The area proposed for leasing in the Basin was restricted to the Sale 92 Area in the southwestern portion. Additional EISs will be needed to evaluate the potential effects of specific lease actions, exploration activities, and development and production plans in the Basin. A full range of updated multidisciplinary scientific information will be needed to address oceanography, fate and effects of oil spills, marine ecosystems, fish, fisheries, birds, marine mammals, socioeconomics, and subsistence in the Basin. Scientific staff at Argonne National Laboratory were contracted to assist MMS with identifying and prioritizing information needs related to potential future oil and gas leasing and development activities in the North Aleutian Basin. Argonne focused on three related tasks: (1) identify and gather relevant literature published since 1996, (2) synthesize and summarize the literature, and (3) identify and prioritize remaining information needs. To assist in the latter task, MMS convened the North Aleutian Basin Information Status and Research Planning Meeting (the Planning Meeting) in Anchorage, Alaska, from November 28 through December 1, 2006. That meeting and its results are described in 'Proceedings of the North Aleutian Basin Information Status and Research Planning Meeting' (the Planning Meeting report)1. Citations for recent literature (1996-2006) to support an assessment of the impacts of oil and gas development on natural, cultural, and socioeconomic resources in the North Aleutian Basin were entered in a database. The database, a series of Microsoft Excel spreadsheets with links to many of the reference materials, was provided to MMS prior to the Planning Meeting and was made available for participants to use during the meeting. Many types of references were identified and collected from the literature, such as workshop and symposium proceedings, personal web pages, web pages of government and nongovernmental organizations, EISs, books and articles reporting research results, regulatory documents, technical reports, newspaper and newsletter articles, and theses and dissertations. The current report provides (1) a brief overview of the literature; (2) descriptions (in tabular form) of the databased references, including geographic area covered, topic, and species (where relevant); (3) synopses of the contents of the referenced documents and web pages; and (4) a full citation for each reference. At the Planning Meeting, subject matter experts with research experience in the North Aleutian Basin presented overviews of the area's resources, including oceanography, fish and shellfish populations, federal fisheries, commercial fishery economics, community socioeconomics, subsistence, seabirds and shorebirds, waterfowl, seals and sea lions, cetaceans, sea otters, and walruses. These presentations characterized the status of the resource, the current state of knowledge on the topic, and information needs related to an assessment of the effects of oil and gas development. An overview of each presentation and the presentation materials used at the meeting are provided in the Planning Meeting report. The reader should refer to that report as well as to the information presented in the current report for a more complete understanding of each resource.

02 PETROLEUM↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Financial Innovation Among the Community Wind Sector in the United States

In the relatively brief history of utility-scale wind generation, the 'community wind' sector - defined here as consisting of relatively small utility-scale wind power projects that are at least partly owned by one or more members of the local community - has played a vitally important role as a 'test bed' or 'proving ground' for wind turbine manufacturers. In the 1980s and 1990s, for example, Vestas and other now-established European wind turbine manufacturers relied heavily on community wind projects in Scandinavia and Germany to install - and essentially field-test - new turbine designs. The fact that orders from community wind projects seldom exceeded more than a few turbines at a time enabled the manufacturers to correct any design flaws or manufacturing defects fairly rapidly, and without the risk of extensive (and expensive) serial defects that can accompany larger orders. Community wind has been slower to take root in the United States - the first such projects were installed in the state of Minnesota around the year 2000. Just as in Europe, however, the community wind sector in the U.S. has similarly served as a proving ground - but in this case for up-and-coming wind turbine manufacturers that are trying to break into the broader U.S. wind power market. For example, community wind projects have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010),1 Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Just as it has provided a proving ground for new turbines, so too has the community wind sector in the United States served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the 'partnership flip structure' - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adapted by the broader wind market. More recently, a handful of community wind projects built in the United States over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures. These projects include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into 'New Markets Tax Credits' using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind financing structures that could serve as useful examples for other projects - both community and commercial wind alike. This new wave of financial innovation occurring in the community wind sector has been facilitated by policy changes, most of them recent. Most notably, the American Recovery and Reinvestment Act of 2009 ('the Recovery Act') enables, for a limited time, wind power (and other types of) projects to elect either a 30% investment tax credit ('ITC') or a 30% cash grant (the 'Section 1603 grant') in lieu of the federal incentive that has historically been available to wind projects in the U.S. - a 10-year production tax credit ('PTC'). This flexibility, in turn, enables wind power projects to pursue lease financing for the first time - leasing is not possible under the PTC. Because they are based on a project's cost rather than energy generation, the 30% ITC and Section 1603 grant also reduce performance risk relative to the PTC - this, too, is an important enabler of lease financing. Finally, by providing a cash rather than tax incentive, the Section 1603 grant alone reduces (but does not eliminate) the need for tax appetite among project owners. All of these policy changes can be particularly useful to community wind projects, and have helped to support the different financial structures mentioned above. This special report - which is distilled from a longer Berkeley Lab report - briefly describes just two of these innovative new financing structures: the sale/leaseback structure used in Minnesota and the intrastate offering conducted in South Dakota. Readers interested in more detail on these two structures, as well as the other three projects not covered here, are encouraged to reference the full Berkeley Lab report.

17 WIND ENERGY↗

Solar Technology Center

The Department of Energy, Golden Field Office, awarded a grant to the UNLV Research Foundation (UNLVRF) on August 1, 2005 to develop a solar and renewable energy information center. The Solar Technology Center (STC) is to be developed in two phases, with Phase I consisting of all activities necessary to determine feasibility of the project, including design and engineering, identification of land access issues and permitting necessary to determine project viability without permanently disturbing the project site, and completion of a National Environmental Policy Act (NEPA) Environmental Assessment. Phase II is the installation of infrastructure and related structures, which leads to commencement of operations of the STC. The STC is located in the Boulder City designated 3,000-acre Eldorado Valley Energy Zone, approximately 15 miles southwest of downtown Boulder City and fronting on Eldorado Valley Drive. The 33-acre vacant parcel has been leased to the Nevada Test Site Development Corporation (NTSDC) by Boulder City to accommodate a planned facility that will be synergistic with present and planned energy projects in the Zone. The parcel will be developed by the UNLVRF. The NTSDC is the economic development arm of the UNLVRF. UNLVRF will be the entity responsible for overseeing the lease and the development project to assure compliance with the lease stipulations established by Boulder City. The STC will be operated and maintained by University of Nevada, Las Vegas (UNLV) and its Center for Energy Research (UNLV-CER). Land parcels in the Eldorado Valley Energy Zone near the 33-acre lease are committed to the construction and operation of an electrical grid connected solar energy production facility. Other projects supporting renewable and solar technologies have been developed within the energy zone, with several more developments in the horizon.

14 SOLAR ENERGY↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Malheur River Wildlife Mitigation Project : 2008 Annual Report.

In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

13 HYDRO ENERGY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

U.S. Department of Energy Office of Legacy Management Legacy Uranium Mine Site Reclamation - Lessons Learned - 12384

The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features contained within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Capacity Density Considerations for Offshore Wind Plants in the United States

The United States is a rapidly emerging market for offshore wind energy, with a project pipeline estimated at over 52 GW as of May 31, 2023 (Musial et al. 2023). The capacity density, measured in megawatts per square kilometer (MW/km 2 ), is a crucial parameter for estimating the magnitude of the development pipeline and the nameplate potential of existing lease areas. The offshore wind energy industry is comprised of diversity of participants, including developers, governmental bodies, investors, environmental advocacy groups, and researchers. These various stakeholders use capacity density in different ways as a key metric for evaluating the potential of individual offshore wind lease area or even a section of ocean space. This report presents our assessment of capacity density values in the current pipeline of emerging U.S. offshore wind farms and a detailed list of the main factors that influence capacity density. This understanding is critical for planning of future lease areas, for estimating the technical resource potential for offshore wind on the U.S. outer continental shelf (OCS), and for estimating ocean space requirements needed for meeting state and national goals for a carbon neutral energy transition.

17 WIND ENERGY↗

Challenges and Opportunities for Floating Offshore Wind Energy in Ultradeep Waters of the Central Atlantic

This study, funded under an interagency agreement between the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) and Bureau of Ocean Energy Management (BOEM), is intended to provide BOEM with key information to inform their decision making about current and future leasing in the Central Atlantic region of the United States. The report will also benefit state governments, developers, research institutions, and the public which are seeking technical and market-based information about the unique aspects of the offshore wind energy development along the outer continental shelf of the Central Atlantic region of the United States. The study provides a broad top-level assessment of the key challenges and opportunities that are unique to offshore wind energy development in the Central Atlantic region. It focuses on BOEM's Central-Atlantic region Call areas. The research is based on the most current technology, deployment, and stakeholder information available to NREL. The topics include assessments of the physical environment, current leasing status and major stakeholder issues, state and federal energy policy, an assessment of future leasing requirements based on state targets, status and limitations of the technology, and supply chain status. The primary intent is to inform the readers about the prospects for deploying offshore wind in the designated deep water Call areas, E and F, identified by BOEM. The report makes recommendations regarding development in these regions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Class I cultural resource overview for oil shale and tar sands areas in Colorado, Utah and Wyoming.

In August 2005, the U.S. Congress enacted the Energy Policy Act of 2005, Public Law 109-58. In Section 369 of this Act, also known as the 'Oil Shale, Tar Sands, and Other Strategic Unconventional Fuels Act of 2005', Congress declared that oil shale and tar sands (and other unconventional fuels) are strategically important domestic energy resources that should be developed to reduce the nation's growing dependence on oil from politically and economically unstable foreign sources. The Bureau of Land Management (BLM) is developing a Programmatic Environmental Impact Statement (PEIS) to evaluate alternatives for establishing commercial oil shale and tar sands leasing programs in Colorado, Wyoming, and Utah. This PEIS evaluates the potential impacts of alternatives identifying BLM-administered lands as available for application for commercial leasing of oil shale resources within the three states and of tar sands resources within Utah. The scope of the analysis of the PEIS also includes an assessment of the potential effects of future commercial leasing. This Class I cultural resources study is in support of the Draft Oil Shale and Tar Sands Resource Management Plan Amendments to Address Land Use Allocations in Colorado, Utah, and Wyoming and Programmatic Environmental Impact Statement and is an attempt to synthesize archaeological data covering the most geologically prospective lands for oil shale and tar sands in Colorado, Utah, and Wyoming. This report is based solely on geographic information system (GIS) data held by the Colorado, Utah, and Wyoming State Historic Preservation Offices (SHPOs). The GIS data include the information that the BLM has provided to the SHPOs. The primary purpose of the Class I cultural resources overview is to provide information on the affected environment for the PEIS. Furthermore, this report provides recommendations to support planning decisions and the management of cultural resources that could be impacted by future oil shale and tar sands resource development.

04 OIL SHALES AND TAR SANDS↗

Crossing the Barriers: An Analysis of Land Access Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including access to land. Activities required for accessing land, such as environmental review and private and public leasing can take a considerable amount of time and can delay or prevent project development. This paper discusses the impacts to available geothermal resources and deployment caused by land access challenges, including tribal and cultural resources, environmentally sensitive areas, biological resources, land ownership, federal and state lease queues, and proximity to military installations. In this analysis, we identified challenges that have the potential to prevent development of identified and undiscovered hydrothermal geothermal resources. We found that an estimated 400 MW of identified geothermal resource potential and 4,000 MW of undiscovered geothermal resource potential were either unallowed for development or contained one or more significant barriers that could prevent development at the site. Potential improvement scenarios that could be employed to overcome these barriers include (1) providing continuous funding to the U.S. Forest Service (USFS) for processing geothermal leases and permit applications and (2) the creation of advanced environmental mitigation measures. The model results forecast that continuous funding to the USFS could result in deployment of an additional 80 MW of geothermal capacity by 2030 and 124 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The creation of advanced environmental mitigation measures coupled with continuous funding to the USFS could result in deployment of an additional 97 MW of geothermal capacity by 2030 and 152 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The small impact on potential deployment in these improvement scenarios suggests that these 4,400 MW have other barriers to development in addition to land access. In other words, simply making more resources available for development does not increase deployment; however, impacts to deployment could increase when coupled with other improvements (e.g., permitting, market and/or technology improvements).

15 GEOTHERMAL ENERGY↗

Build Out to Save Money - Small Office

This fact sheet for small office leases provides guidance on how property teams, leasing agents, and brokers can communicate the value of considering energy efficiency during tenant improvements.

small office, commercial real estate, lease, leasi↗

Build Out to Save Money

This fact sheet for large office leases provides guidance on how property teams, leasing agents, and brokers can communicate the value of considering energy efficiency during tenant improvements.

large office, commercial real estate, lease, leasi↗

Wind power production from very large offshore wind farms

In this work, we provide the first quantitative assessment of power production and wake generation from offshore wind energy lease areas along the U.S. east coast. Deploying 15-MW wind turbines, with spacing equal to the European average, yields electricity production of 116 TWh/year or 3% of current national supply. However, power production is reduced by one-third due to wakes caused by upwind wind turbines and wind farms. Under some flow conditions whole wind-farm wakes can extend up to 90 km downwind of the largest lease areas, and the frequency-weighted average area with a 5% velocity deficit is 2.6 times the footprint of the lease areas. Simulations including maritime corridors demonstrate reduction in the wake effects leading to power-efficiency gains and may offer contingent benefits. First-order scaling rules are developed that describe how “wake shadows” from large offshore wind farms scale with prevailing meteorology and wind turbine installed densities.

15 MW↗

Finding Large Aperture Fractures in Geothermal Resource Areas Using a Three-Component Long-Offset Surface Seismic Survey, PSInSAR and Kinematic Structural Analysis

The DOE cost-share program applied innovative and cutting edge seismic surveying and processing, permanent scatter interferometry-synthetic aperture radar (PSInSAR) and structural kinematics to the exploration problem of locating and mapping largeaperture fractures (LAFs) for the purpose of targeting geothermal production wells. The San Emidio geothermal resource area, which is under lease to USG, contains production wells that have encountered and currently produce from LAFs in the southern half of the resource area (Figure 2). The USG lease block, incorporating the northern extension of the San Emidio geothermal resource, extends 3 miles north of the operating wellfield. The northern lease block was known to contain shallow thermal waters but was previously unexplored by deep drilling. Results of the Phase 1 exploration program are described in detail in the Phase 1 Final Report (Teplow et al., 2011). The DOE cost shared program was completed as planned on September 30, 2014. This report summarizes results from all of Phase 1 and 2 activities.

15 GEOTHERMAL ENERGY↗