Search NASA⌕ Search

SEARCH · Search NASA

Results for “Levelized Cost Of Electricity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Binderjet Additive Manufacturing for Complex Heat Exchanger Geometries

Concentrated Solar Power (CSP) systems play a role in the worlds development of renewable energy. Mirrors are used to concentrate sunlight that is converted into electricity or other forms of useful energy. CSP impact depends significantly on its overall economics. The U.S. Department of Energy’s (DOE’s) Solar Energy Technology Office (SETO) cost goals for 2030include $0.05/kWh levelized cost of electricity (LCOE) for a baseload plant [1]. The power cycle cost goal is $900/kWe [1]. The envisioned recompression supercritical carbondioxide (sCO2) power cycle includes four heat exchangers, which together are at least ¾ of the total power cycle cost. Meeting the cost target requires reducing the heat exchanger cost. The 260 bar and 588 °C heat exchanger requirements are challenging. Shell and tube heat exchangers can meet the requirements, but the size and cost are prohibitive. State-of-the-art diffusion bonded printed circuit heat exchanger designs are 3 m3 or larger and expensive to manufacture. Additive manufacturing enables novel heat exchanger geometries that can reduce heat exchanger size and mass [2]. Binderjet technology is an additive manufacturing modality. It selectively deposits binder material onto the powder bed to form a solid part one layer at a time. Once applied, the binder is cured, the remaining powder removed, and the part heat treated in steps to remove the binder, sinter the metal powder, and densify the part. The Binderjet printing process is more than 10x faster than the best-known metal additive modality, direct metal laser melting (DMLM), thus enabling 10x the part through-put rate [3]. The high throughput rate results in a low-cost manufacturing process capable of creating complex heat exchanger geometries. This paper introduces a complex heat exchanger geometry and methods of Binderjet processing to fabricate the geometry.

Barua, Ananda↗

Multiscale simulation of integrated energy system and electricity market interactions

Accelerating the deep decarbonization of the world's electric grids requires the coordination of complex energy systems and infrastructures across timescales from seconds to decades. Here, we present a new multiscale simulation framework that integrates process- and grid-centric modeling paradigms to better design, operate, and control integrated energy systems (IESs), which combine multiple technologies, in wholesale energy markets. Traditionally, IESs are analyzed with a process-centric paradigm such as levelized cost of electricity (LCOE) or annualized net revenue, ignoring important interactions with electricity markets. This framework explicitly models the complex interactions between an IES's bidding, scheduling, and control decisions and the energy market's clearing and settlement processes, while incorporating operational uncertainties. Through two case studies, we show the importance of understanding and quantifying complex resource-grid interactions. In case study 1, we demonstrate that optimized bidding from one resource shifts the profit distribution for all energy systems in the market. This result suggests new and more flexible IES technologies can disrupt the economics of all market participants, possibly leading to accelerated retirements of less flexible resources. Interestingly, the optimized bidding has little impact on grid-level aggregate statistics, such as total generation costs and renewable penetration rate. While aggregate modeling strategies may remain valid under some IES adoption scenarios for analysis focused on regional outcomes, direct comparisons of IES technologies at specific locations without considering these interactions may lead to misleading or incorrect conclusions. In case study 2, we consider the design and flexible operation of IESs that hybridize conventional generators with energy storage. Through a sensitivity analysis, we find that as the size of the storage system increases, the total number of start-ups for coal- and natural gas-based IESs reduced by 25% and 33.6%, and the total thermal generator ramping (i.e., mileage) reduced by 86.5% and 62.5%, respectively. This shows the primary benefit of storage may not be reduced operational costs (which do not change significantly) but fewer start-ups and less ramping, which may greatly simplify the design, operation, and control of carbon capture systems. The new modeling and optimization capabilities from this work enable the coupling of rigorous, dynamic process models with grid-level production cost models to quantitatively identify the nuanced interdependencies across these vast timescales that must be addressed to realize clean, safe, and secure energy production. Moreover, the proposed general multiscale simulation framework is applicable to all IES technologies and can be easily extended to consider other energy carriers (e.g., hydrogen, ammonia) and energy infrastructures (e.g., natural gas pipelines).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Potential Early Markets for Fusion Energy

We examine potential early markets for fusion energy and their projected cost targets, based on analysis and synthesis of many relevant, recent studies and reports. Seeking to provide guidance to ambitious fusion developers aspiring to enable commercial deployment before 2040, we examine cost requirements for fusion-generated electricity, process heat, and hydrogen production based on today’s market prices but with various adjustments relating to possible scenarios in 2035, such as ‘‘business-as-usual,’’ high renewables penetration, and carbon pricing up to 100 $/tCO 2 . Key findings are that fusion developers should consider focusing initially on high-priced global electricity markets and consider including integrated thermal storage, depending on techno-economic factors, in order to maximize revenue and compete in markets with high renewables penetration. Process heat and hydrogen production will be tough early markets for fusion, but may open up to fusion as markets evolve and if fusion’s levelized cost of electricity falls below 50 $/MWh e . Finally, we discuss potential ways for a fusion plant to increase revenue via cogeneration (e.g., desalination, direct air capture, or district heating) and to lower capital costs (e.g., by minimizing construction times and interest or by retrofitting coal plants).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal↗

Design and Technoeconomic Analysis of High-Temperature Particle Conveyance Components for a 100 MW e Concentrating Solar Power Plant

Levelized costs of electricity (LCOE) approaching the U.S. Department of Energy Solar Energy Technologies Office 2030 goal of 0.05 $/kWh may be achievable using Brayton power cycles that use supercritical CO2 as the working fluid and flowing solid particles with temperatures >700° C as the heat transfer media. The handling and conveyance of bulk solid particles at these temperatures in an insulated environment is a critical technical challenge that must be solved for this approach to be used. A design study was conducted at the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories in Albuquerque, NM, with the objective of identifying the technical readiness level, performance limits, capital and O&M costs, and expected thermal losses of particle handling and conveyance components in a particle-based CSP plant. Key findings indicated that chutes can be a low-cost option for particle handling but uncertainties in tower costs make it difficult to know whether they can be cost effective in areas above the receiver if tower heights must then be increased. Skips and high temperature particle conveyance technology are available for moving particles up to 640° C. This limits the use of mechanical conveyance above the heat exchanger and suggests vertical integration of the hot storage bin and heat exchanger to facilitate direct gravity fed handling of particles.

14 SOLAR ENERGY↗

Dual-loop Solvent-based CCS for Net Negative CO 2 Emissions with Lower Cost

This final technical report details the successful design, construction, and operational validation of an innovative dual-loop CO 2 capture technology designed to achieve deep decarbonization (>99%) from Natural Gas Combined Cycle (NGCC) power plants that results in the electricity with carbon intensity of approximate 42 kg CO 2 -eq/MWh, less than the electricity produced by solar PV. The integrated process couples a primary aqueous solvent (in this project, a water lean solvent – WLS) absorption loop for bulk CO 2 removal with a secondary potassium hydroxide (KOH) polishing loop featuring electrochemical regeneration. This architecture leverages the higher exergy efficiency of the primary loop while utilizing the fastest kinetic of the secondary loop to capture dilute residual CO 2 , achieving an overall capture rate of 99.9% and co-producing pure hydrogen after moisture being condensed and dehydrated. Technical feasibility was established through a comprehensive 2,000-hour experimental campaign on a bench-scale fully-integrated unit (using 4” absorber and 4” stripper) with the feeding flue gas flowrate in the range of 8-20 cfm, confirming the attainment of Technology Readiness Level (TRL) 4. The project executed extensive parametric testing followed by 1,000 hours of continuous steady-state testing, demonstrating exceptional process stability with the electrochemical regenerator exhibiting less than a 10% reduction in electrical conductivity over the duration of the campaign. Operational characterization gathering on the bench unit revealed distinct energy profiles for the hybrid system: the primary loop required approximately 280 kJ mol -1 for bulk removal, while the polishing loop required approximately 1,600 kJ mol -1 specifically when reducing dilute CO 2 concentrations from ~740 ppm down to <50 ppm. (Please note those energy values/numbers can only be viewed as relative relationship and should not be extrapolated as absolute values required for CO 2 capture). Furthermore, dynamic testing validated the system’s flexibility for utility applications, demonstrating a rapid process response time of <30 minutes to changes in flue gas flowrate. Emission monitoring confirmed that the dual-loop architecture effectively mitigates solvent losses, utilizing a water wash to remove entrained aerosols to <1 ppm. The Techno-Economic Analysis (TEA) indicates a cost of capture of $\$$59.3/tonne and a Levelized Cost of Electricity (LCOE) of 71.7 $\$$/MWh at the overall capture efficiency of 99.8% of total carbon in the flue gas stream, with sensitivity analysis identifying an economic optimum when the primary loop captures 97% of the total CO 2 . A Life Cycle Assessment (LCA) confirms the technology’s potential for net-negative emissions, determining a Global Warming Potential (GWP) of 52 kg CO 2 -eq/MWh—significantly lower than the baseline—which further decreases to 42 kg CO 2 -eq/MWh when crediting the displacement of conventional hydrogen production.

03 NATURAL GAS↗

In-situ determination of moisture- and temperature-driven deflection of an encapsulated Si photovoltaic cell

Module reliability and service lifetime are critical factors in improving photovoltaic system performance and reducing the levelized cost of electricity (LCOE). Soldering and lamination of the cell impart residual stresses that persist over time and superimpose additional loads during operation. This paper demonstrates the use of X-ray Topography (XRT) to image in-situ the dynamic response of a glass/backsheet mini-module upon drying at elevated temperature after saturation at humidity levels compatible with accelerated testing. The local water content in the encapsulant is also determined in-situ over time via Water Reflectometric Detection (WaRD), with diffusion of water in the front (glass side) and rear (backsheet side) resolved. As water diffuses out from the back of the glass/backsheet module, the cell curves towards the backsheet concomitantly. Here we find that the cell edges deflect 40μm out-of-plane with respect to its center while the encapsulant dries, compared to ~100 μm deflection when heating from 25°C to 85°C. The local cell deflections (changes in cell orientation) are correlated with the dynamic loss of water in the backside encapsulant. We conclude that the observed cell deflections are the result of hygroscopic stress induced by the encapsulant upon moisture outdiffusion. Therefore, the cell experiences a continually changing stress state and curvature dependent on local humidity and temperature. Depending on cell architecture and interconnection, this “breathing” mode of the cell may induce wear out and fatigue of the interconnects, affect the electrical connection of cracked pieces or cause failure near the interconnected edges of two cells.

14 SOLAR ENERGY↗

Gen3 Gas Phase System Development and Demonstration (Final Technical Report)

Work undertaken in this project seeks to transform the current baseline technology – which is a collection of related but separately developed components and concepts – into a unified and operating test facility and an accompanying preliminary commercial design. This project is motivated by the primary goal of developing a system to absorb concentrated solar energy and deliver it into thermal energy storage at temperatures above 700°C, thereby enabling integration with a high-efficiency supercritical carbon dioxide (sCO 2 ) power cycle to achieve or exceed a levelized cost of electricity (LCOE) target of 6 ¢ per kilowatt-hour electric (kW e -hr). The proposed baseline solution utilizes a high-temperature gas phase (GP) system interfacing with a two-tank particle thermal energy storage (TES) and intermediate heat exchangers to supply sCO 2 at 20-25 megapascals (MPa) and 700°C at the turbine inlet.

14 SOLAR ENERGY↗

Mining G.O.L.D. (Geothermal Opportunities Leveraged Through Data): Exploring Synergies Between the Geothermal and Mining Industries

This report analyzes potential collaborations between the geothermal and locatable mineral industries (focused on the portion of the Basin and Range Province within Nevada, United States of America). The objectives of this study included analyzing: 1. The type and quality of data collected by the locatable mineral industry to determine feasibility for geothermal resource exploration; 2. The regulatory pathways and potential barriers that could prevent development of geothermal resources discovered via a mining claim (and vice versa) in the United States; 3. The historical development of geothermal resources discovered via mineral exploration data in the United States and illustrations of co-located mining and geothermal power projects; 4. The value propositions for both the locatable mineral and the geothermal industries to collaborate. This article concludes that many of the data collected by the mining industry as part of locatable mineral exploration (e.g., copper, gold, lithium) would also be useful for identifying and developing previously unknown geothermal resources (and in some notable cases, already have led to geothermal resource development). In addition, for minimal costs, the mining industry could catalogue these data and potentially monetize the data itself or use the data in the future to develop a geothermal project. Leveraging these locatable mineral data to develop geothermal resources and/or co-located minerals and geothermal resources would represent significant cost savings when compared to developing geothermal resources under a business-as-usual scenario as well as compared to current generating technologies (e.g., diesel-powered generators) employed at remote mining operations. Ultimately, leveraging mining industry data, knowledge, and expertise serves to effectively expand the geothermal exploration workforce, increase the rate of geothermal resource discovery, and potentially reduce geothermal electricity's levelized cost of energy (LCOE) by 23%-29%.

15 GEOTHERMAL ENERGY↗

Recyclable Design for Retaining High Solar Absorptivity of the Media in CSP

Efficient thermal energy storage is pivotal to lowering the levelized cost of electricity (LCOE) for Concentrating Solar Power (CSP) plants. In solid-particle systems, however, prolonged high-temperature service degrades particle solar absorptivity, eroding overall efficiency. This project demonstrates a hydrogen-assisted recovery process that reliably restores absorptivity to >90 %, offering a practical route to sustain long-term CSP performance. Bench-scale investigations mapped the reduction kinetics of optically faded particles across hydrogen concentrations, temperatures, and residence times. Coupling mass-spectrometric monitoring with machine-learning optimization minimized energy demand while maximizing absorptivity gain. The resulting process window—moderate hydrogen partial pressures, 15–30 min dwell times, and temperatures well below initial calcination levels—cuts energy consumption well below that of incumbent re-blackening methods. A prototype recovery reactor processed multiple 2 kg batches with repeatable outcomes, confirming scalability and operational robustness. Integrated techno-economic analysis indicates material and operating cost reductions exceeding 15 % relative to conventional particle replacement or chemical re-coating, translating directly into lower LCOE for next-generation CSP facilities. By uniting fundamental reaction-kinetics insight with pragmatic engineering, this work advances the solid-particle pathway, delivering a cost-effective, field-deployable solution to one of CSP’s key durability challenges and strengthening the commercial outlook for high-temperature renewable power.

14 SOLAR ENERGY↗

Why Wideband Gap Needs Techno-Economics

The wideband gap community when discussing projects antidotally refers to the cost of the technology, frequently noting the higher wideband gap upfront cost in comparison to the incumbent state of art. Other technologies such as photovoltaics have embraced techno-economics analysis (TEA) as a method of analytically articulating the impacts of research advancements on system performance and lifetime costs. Our TEA shows the potential impact of research advancements on Gallium Oxide (Ga2O3) and Silicon Carbide (SiC) wafer manufacturing cost, the impact on the levelized cost of electricity (LCOE) when using a SiC based solar inverter, and lastly how the high cost of devices (SiC in this case) can be offset by other system cuts, such as the footprint and cooling reductions in a 1MW variable frequency motor drive. The specific goal is to show analytically the lifetime cost and performance benefits of adopting wideband gap technology whether it is at the device level or it is cumulative benefit though a simplified balance of system.

14 SOLAR ENERGY↗

Techno-Economic Performance of Eavor Loop 2.0

This project evaluated techno-economic performance for a sample Eavor-Loop 2.0 design for electricity production and direct-use heating. The Eavor-Loop 2.0 design investigated is a 7.5-km deep closed-loop geothermal system consisting of 12 laterals for a total of more than 90 km of downhole well and lateral length. Both a high geothermal gradient scenario of 60 degrees C/km and a low geothermal gradient scenario of 30 degrees C/km were considered. With pure water injected at 60 degrees C and 80 kg/s, reservoir simulations with the Slender-Body Theory simulator indicate average production temperatures over a 30-year lifetime of ~125 degrees C and ~210 degrees C for the low and high geothermal gradient scenario, respectively. These correspond to heat production of ~22 M Wth and ~51 M Wth, respectively. Using IPSEpro simulations, we find average power production of ~2.2 M We and ~8.6 M We, respectively, for a subcritical organic Rankine cycle power plant with air-cooled condensers. Cost estimates indicate the overall capital and levelized costs are dominated by the lateral drilling cost. Obtaining a levelized cost of electricity below $70/M Wh requires a geothermal gradient of 60 degrees C/km, a discount rate below 9%, and lateral drilling cost below $400/m. A well cost model indicates that ~$400/m for the Eavor-Loop 2.0 design investigated can be obtained for a drilling rate of penetration about 40 ft/hr (with bit life of 50 hours), and omitting casing and cement. Traditional (geothermal) well drilling has achieved these drilling rate conditions, including the Utah FORGE project where the rate of penetration has exceeded 50 ft/hr in granite. However, it is unclear if these conditions are still valid for drilling the Eavor-Loop 2.0 laterals (i.e., ~82 km of laterals at 4 to 7.5-km vertical depth with rock temperatures up to 460 degrees C), as such downhole completion has never been developed before. Competitive levelized cost of heat values ($1.2-$8.2/GJ) are calculated, even for the low geothermal gradient scenario (30 degrees C/km) and lateral drilling cost of $600/m.

advanced geothermal system↗

Hydrogen Carriers for Renewable Microgrid System Applications

Utility-scale energy storage can help improve grid reliability, reduce costs, and promote faster adoption of intermittent sources such as solar and wind. This paper analyzes the technical aspects and economics of standalone microgrids operating on intermittent power combined with hydrogen energy storage. It explores the feasibility of using dibenzyltoluene (DBT) as a liquid organic hydrogen carrier to absorb excess energy during periods of high supply and polymer electrolyte fuel cells to generate electrical energy during periods of low supply. A comparative analysis is conducted on three power demand scenarios (industrial, residential, and office), in conjunction with three alternative energy sources: solar, wind and wind–solar mix. A mixed system of solar and wind energy can maintain an annual average efficiency above 70%, except for residential power demand, which lowered the efficiency to 67%. A balanced combination of wind and solar power was the most cost-effective option. The current levelized cost of electricity (LCOE) for industrial power demand was estimated to 15 ¢/kWh, and it is projected to decrease to 9 ¢/kWh in the future. For residential power demand, the LCOE was 45% higher due to the demand profile. In comparison, battery storage is significantly more expensive than hydrogen storage, even with future cost projections, increasing the LCOE between 60 and 120 ¢/kWh.

PEM electrolysis↗

Pros and Cons Analysis of HALEU Utilization in Example Fuel Cycles

The Systems Analysis and Integration campaign assessed the pros and cons of high-assay low-enriched uranium (HALEU) utilization in advanced reactors and associated fuel cycles. The assessment was done for three example fuel cycles at equilibrium states: once-through, limited recycle, and continuous recycle (CR) starting with HALEU. Front- and back-end fuel cycle parameters and the Levelized Cost of Fuel (LCF), which is the Levelized Cost of Electricity excluding reactor cost, of the three example fuel cycles were calculated using a single Analysis Example Reactor. The pros and cons of HALEU utilization were assessed by normalizing the fuel cycle parameters and LCF to a unit of electricity generation (GWe-year) and comparing them with a Basis of Comparison. In this study, a sodium-cooled reactor with sodium-bonded metallic fuel having a burnup of ~100 GWd/t was used as the Analysis Example Reactor because its technology readiness level is high, and the burnup and fuel enrichment are in the middle of those ranges of advanced reactor concepts that are under development. The current once-through Light Water Reactors (OT-LWRs) with <5% low-enriched uranium and 50 GWd/t burnup were used as the Basis of Comparison. In addition, a series of sensitivity analyses was conducted by varying burnup, enrichment, fuel forms, and reactor types to capture the design variations in two once-through Advanced Reactor Demonstration Program (ARDP) reactors, Natrium with sodium-free metallic fuel having a burnup of ~150 GW/t and Xe-100 with Tristructural-Isotropic (TRISO) pebble fuel having a burnup of ~168 GWd/t.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-economic and environmental assessment of solar-based electrical vehicles charging stations integrated with hydrogen production

With the growing interest in adopting both commercial and residential electric vehicles (EVs) utilizing green renewable energy, the techno-economic assessment of EV charging stations with solar energy is a critical aspect of the transition to sustainable transportation. However, battery storage capacity for variable solar energy production is becoming increasingly less cost-effective due to the higher Lithium price. Complementing solar energy production and battery storage, the potential of combining green hydrogen fuel energy integration with solar energy for EV charging stations can provide a sustainable alternative to reach carbon-free transportation. This research aims to assess the technical and economic viability of grid-connected Photovoltaic (PV)-based EV charging stations across Kentucky based on existing EV load profiles. The study considers different PV system sizes, locations, orientations, and the impact of net metering policies and electricity tariffs on the profitability of the PV systems. Further, using excess PV energy, Lithium-Ion batteries will be charged, which will be assessed considering the techno-economic and environmental impacts of green EV charging stations. To further enhance green renewable energy production, we also investigated the feasibility of on-grid PV-based EV charging stations with Lithium-Ion batteries charged during low tariff periods. In comparison with these scenarios, we studied the potential benefits of integrating green hydrogen energy production using excess solar energy with and without governmental incentives. Furthermore, we assess the environmental impact of these green EV charging stations across Kentucky. Our study indicates that EV stations across Kentucky have similar techno-economic feasibility with insignificant deviation in the levelized cost of electricity, payback period, and PV energy fraction with/without Li-Ion batteries. However, with green hydrogen production, the marginal H 2 production cost indicates the first scenario (on-grid PV energy charging) is the most significant, roughly 10 USD/Kg, which is similar to 1.5 times higher than the second (charging during low-tariff periods) and the third scenarios (power grid to satisfy the demand deficit - approximately 6.5 USD/Kg). From the environmental perspective, the second scenario would be a good option for either hybrid EV/H 2 or EV charging stations in Kentucky, factoring in the hydrogen production cost and the carbon footprint.

08 HYDROGEN↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Powdermet CRADA for VELOCITI Voucher (CRADA Final Report)

NLR shall develop a model of an electric thermal energy storage (ETES) system in the System Advisor Model (SAM) framework that uses a salt and particle slurry developed by PowderMet as the thermal energy storage medium. The ETES shall consist of a recuperated sCO 2 Brayton cycle using 2-tank indirect thermal energy storage and an electric heater for heat input. The salt slurry uses chloride salt and operates at a maximum temperature of 500-720°C. The ETES uses dry air cooling. The salt slurry will be modeled as a sensible heat storage medium and as a latent heat storage medium. NLR will use the model to do parametric analysis of the factors affecting the performance (ex., round trip efficiency) of the ETES system. NLR will work with PowderMet to estimate the costs of system components and total system costs, with the levelized cost of electricity (LCOE) as the primary cost metric.

14 SOLAR ENERGY↗