Search NASASearch

SEARCH · Search NASA

Results for “Loop Heat Pipe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

523 records · Page 4

SAM Code Enhancements for Fission Product Tracking of Noble Gases and Metals in MSRs

This report documents fiscal year 2026 enhancements to the System Analysis Module (SAM) for modeling fission product transport in liquid-fueled molten salt reactors (MSRs). The work advances three principal areas: noble gas transport, noble metal deposition, and user interface improvements. The noble gas transport capability integrates drift-flux gas transport, Henry’s law two-film interphase mass transfer with pressure-based nucleation suppression, Knudsen-regime pore diffusion into porous graphite with a conjugate salt-graphite interface constraint, built-in material properties, five Sherwood-number mass transfer correlations including three derived from high-fidelity NekRS simulations, and xenon-135 reactivity feedback through SAM’s point-kinetics model. This work also presents a comprehensive verification test suite, including new analytically verified cases for pressure-dependent onset of interphase gas transfer in a stagnant vertical pipe, a postulated FLiBe-graphite Xe extraction permeator, a gravity riser with a fission-product source, and a descending pipe with gas redissolution driven by hydrostatic pressure. A machine learning framework for bubble rise velocity prediction in molten salt systems is developed and benchmarked on molten-salt and diverse aqueous bubble datasets. The best-performing fine-tuned transfer-learning networks achieve an 82% reduction in RMSE relative to the Clift correlation, and is implemented directly in SAM. The noble metal transport capability is developed, including a liquid-wall deposition model and a gas-surface flotation mechanism that transfers insoluble particles entrained by sparging gas to wetted structures. Verification tests and demonstration cases cover the surface deposition, flotation efflux, and flotation shedding. Finally, a new [SpeciesTransport] input structure replaces positional global vectors with selfcontained, order-independent, named species blocks, simplifies the specification of multiphase species and decay chains, and remains fully compatible with existing SAM input files. Together, these developments improve the physical fidelity, verification basis, and usability of SAM for system-level analyses of fissionproduct behavior in MSRs.

Mui, Travis (ORCID:0000000303736470)

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

Wetter, Michael [Lawrence Berkeley National Labora

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Ka-Band Monopulse Antenna-Pointing Systems Analysis and Simulation

NASA's Deep Space Network (DSN) has been using both 70-m and 34-m reflector antennas to communicate with spacecraft at S-band (2.3 GHz) and X-band (8.45 GHz). To improve the quality of telecommunication and to meet future mission requirements, JPL has been developing 34-m Ka-band (32-GHz) beamwave guide antennas. Presently, antenna pointing operates in either the open-loop mode with blind pointing using navigation predicts or the closed-loop mode with conical scan (conscan). Pointing accuracy under normal conscan operating conditions is in the neighborhood of 5 mdeg. This is acceptable at S- and X-bands, but not enough at Ka-band. Due to the narrow beamwidth at Ka-band, it is important to improve pointing accuracy significantly (approx. 2 mdeg). Monopulse antenna tracking is one scheme being developed to meet the stringent pointing-accuracy requirement at Ka-band. Other advantages of monopulse tracking include low sensitivity to signal amplitude fluctuations as well as single-pulse processing for acquisition and tracking. This article presents system modeling, signal processing, simulation, and implementation of Ka-band monopulse tracking feed for antennas in NASA/DSN ground stations.

V Y Lo

ER4047 Filler Wire Development - Initial Studies

This report describes the results of bead on pipe welding trials for the purpose of evaluating commercial off the shelf (COTS) 0.047” ER4047 filler material vendors for down selection of the of best candidate filler material for future Gas-metal Arc Welding (GMAW) development efforts. Four candidate COTS ER4047 filler wires were evaluated during this work - Astrolite, Alcotec, Hobart, and Lincoln. The storage condition of each of these filler wires was documented and visual inspection was performed.

36 MATERIALS SCIENCE

Exploration Extravehicular Mobility Unit 11 Foot Vacuum Chamber Upgrades Test Results

The Exploration Extravehicular Mobility Unit (xEMU) uncrewed 11 foot vacuum chamber testing evaluated the capabilities of the 11 foot vacuum chamber facility to support advanced spacesuit testing. The government reference design xEMU spacesuit provided a high-fidelity test article to demonstrate 11 foot vacuum chamber capabilities which included: gas loading of the chamber at varying simulated metabolic rates and open loop suit abort operations, Intravehicular Activity (IVA) vacuum access, consumables recharge, IVA vehicle-provided thermal loop cooling, and IVA vehicle-provided power. To demonstrate the xEMU airlock operations transitioning from IVA to EVA conditions without a test subject in the suit, test support equipment was developed to remotely actuate both the Exploration, Servicing, and Cooling Umbilical (ESCU) and the vacuum access umbilical. This test also evaluated the performance of the Exploration Portable Life Support System (xPLSS) at vacuum conditions. Data was collected and analyzed for carbon dioxide (CO2) scrubbing performance of the Rapid Cycle Amine (RCA) swingbed, for thermal regulation performance of the Suit Water Membrane Evaporator (SWME), and for sensor performance across the xPLSS. This paper will detail the findings of the testing performed with these upgrades which discussed previously laid out in ICES-2025-342.

Robert Marsch

Exploration Extravehicular Mobility Unit (xEMU) 11 Foot Vacuum Chamber Upgrades Test Results

The Exploration Extravehicular Mobility Unit (xEMU) uncrewed 11 foot vacuum chamber testing evaluated the capabilities of the 11 foot vacuum chamber facility to support advanced spacesuit testing. The government reference design xEMU spacesuit provided a high-fidelity test article to demonstrate 11 foot vacuum chamber capabilities which included: gas loading of the chamber at varying simulated metabolic rates and open loop suit abort operations, Intravehicular Activity (IVA) vacuum access, consumables recharge, IVA vehicle-provided thermal loop cooling, and IVA vehicle-provided power. To demonstrate the xEMU airlock operations transitioning from IVA to EVA conditions without a test subject in the suit, test support equipment was developed to remotely actuate both the Exploration, Servicing, and Cooling Umbilical (ESCU) and the vacuum access umbilical. This test also evaluated the performance of the Exploration Portable Life Support System (xPLSS) at vacuum conditions. Data was collected and analyzed for carbon dioxide (CO2) scrubbing performance of the Rapid Cycle Amine (RCA) swingbed, for thermal regulation performance of the Suit Water Membrane Evaporator (SWME), and for sensor performance across the xPLSS. This paper will detail the findings of the testing performed with these upgrades which discussed previously laid out in ICES-2025-342.

Robert F Marsch

Toward an AI-Powered Software Pipeline for Real-Time Tracking and Analysis of Wildfire and Smoke

Real-time tracking of wildfires and smoke is crucial for effective response, minimizing damage, protecting lives, and efficiently managing resources during fire emergencies. We develop a web-based AI-powered pipeline that detects wildfires in aerial video and estimates deployment-relevant behavior metrics, including cumulative burned area, burned-area growth rate, fire spread direction, and smoke dispersion. The system combines a YOLO-based detector with YCbCr-based fire segmentation, HSV-based smoke segmentation, Farneback optical flow, and centroid-based spatiotemporal tracking. Using ground sampling distance (GSD), pixel-level fire masks are converted to physical burned-area measurements by correlating fire pixel counts with camera altitude and tilt angle. We benchmark YOLO variants and non-YOLO baselines (GoogLeNet, CNN, DBN, Autoencoder, U-Net, and AlexNet) on the IEEE FLAME dataset and a newly created aerial frame dataset, Wildfire-DB. Cross-dataset evaluation uses a strict threshold-transfer protocol: decision thresholds are selected on FLAME validation and transferred unchanged to Wildfire-DB to quantify generalization under domain shift. YOLOv6 achieves the strongest cross-dataset frame-level fire detection on Wildfire-DB (ROC-AUC 0.8200, PR-AUC 0.8044, and transferred-threshold F1 0.7596). For tracking-oriented deployment requiring oriented localization, YOLO11-OBB provides the most reliable cross-dataset behavior among OBB-capable models while remaining computationally feasible. To analyze the feasibility of UAV deployment, we further measure inference efficiency using synchronized GPU and CPU power logs on a fixed workload of 1569 frames. YOLO-family models process the video in 5.73–12.47 seconds with net energy of 1247.28–1775.39 J, substantially lower latency and energy than heavier classification and reconstruction baselines. Overall, model optimality depends on operational objectives: YOLOv6 is best for cross-dataset detection robustness, whereas YOL...

Color segmentation

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING

Mu2e Production Target Thermal Test Project

The Mu2e experiment requires a production target that is capable of operating under extreme thermal conditions caused by an 8 GeV proton beam. This project’s objective supports the development of the Mu2e Pro- duction Target by testing the Stickman model’s thermal behavior. Angel Flores Luviano has assisted Jonathan Williams in progressing this project by contributing to the development of a Radiative Cooling Test Fixture (RCTF) that will be used to evaluate the thermal behavior of the new production target model. Engineering calculations were performed to an- alyze thermal performance and pressure drop within the cold well and wa- ter cooling circuit. These calculations also determined the optimal sizing for key components of the water system. An engineering note was made to document these calculations. CAD models of the water circuit piping, thermocouple mounting bars, and radiator chimney were developed, and prototype test rig components were fabricated using 3D printing. Future work will focus on continued RCTF development which includes control system integration, heater hardware design, and interfaces that can be scaled up to increase thermal capacity.

Flores Luviano, Angel Augusto [Unlisted, US]

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water

Preliminary Design and Implementation of the Baseline Digital Baseband Architecture for Advanced Deep Space Transponders

The baseline design and implementation of the digital baseband architecture for advanced deep space transponders is investigated and identified. Trade studies on the selection of the number of bits for the analog-to-digital converter (ADC) and optimum sampling schemes are presented. In addition, the proposed optimum sampling scheme is analyzed in detail. Descriptions of possible implementations for the digital baseband (or digital front end) and digital phase-locked loop (DPLL) for carrier tracking are also described.

T M Nguyen

Secondary-Side Active Rectifier Synchronization and Control in LCC-LC Compensated Inductive Power Transfer Systems

This paper proposes a communication-less synchronization and output power control strategy for LCC-LC compensated inductive power transfer systems with a secondaryside active rectifier. By replacing the passive rectifier with an active bridge, the proposed architecture eliminates the need for a separate secondary-side DC-DC converter and enables direct regulation of battery power. The key challenge in such a system is achieving robust synchronization of the secondary active bridge with the primary inverter without access to primary-side signals. To address this issue, the secondary-side variables are analyzed and the current through the secondary series inductor is identified as a load-independent synchronization variable with a fixed phase relationship to the primary excitation. A fixed-frequency second order generalized (SOGI)-based phase locked loop (PLL) is used to estimate the switching phase and frequency, and a phase-shift-based output power controller is developed using a phasor-transformer model of the active bridges. A modified control formulation is further introduced to remove phase-dependent loop-gain variation and simplify controller design. Simulation results validate the proposed method under both fixed and varying switching-frequency conditions, demonstrating successful frequency tracking from 82 kHz to 88 kHz and accurate output power regulation over a wide operating range. The proposed method offers a compact and effective solution for high-power IPT systems by enabling secondary-side synchronization and control without wireless communication or an additional DC-DC conversion stage.

Fernandes, Arnold Anthony [ORNL] (ORCID:0009000631

Properties of a Ni19.5Pd30Ti50.5 High-Temperature Shape Memory Alloy in Tension and Compression

Potential applications involving high-temperature shape memory alloys have been growing in recent years. Even in those cases where promising new alloys have been identified, the knowledge base for such materials contains gaps crucial to their maturation and implementation in actuator and other applications. We begin to address this issue by characterizing the mechanical behavior of a Ni 19.5 Pd 30 Ti 50.5 high-temperature shape memory alloy in both uniaxial tension and compression at various temperatures. Differences in the isothermal uniaxial deformation behavior were most notable at test temperatures below the martensite finish temperature. The elastic modulus of the material was very dependent on strain level; therefore, dynamic Young’s Modulus was determined as a function of temperature by an impulse excitation technique. More importantly, the performance of a thermally activated actuator material is dependent on the work output of the alloy. Consequently, the strain-temperature response of the Ni 19.5 Pd 30 Ti 50.5 alloy under various loads was determined in both tension and compression and the specific work output calculated and compared in both loading conditions. It was found that the transformation strain and thus, the specific work output were similar regardless of the loading condition. Also, in both tension and compression, the strain-temperature loops determined under constant load conditions did not close due to the fact that the transformation strain during cooling was always larger than the transformation strain during heating. This was apparently the result of permanent plastic deformation of the martensite phase with each cycle. Consequently, before this alloy can be used under cyclic actuation conditions, modification of the microstructure or composition would be required to increase the resistance of the alloy to plastic deformation by slip.

High-Temperature Shape Memory Alloy

Lunar Nuclear Reactor Neutron Fluence and Gamma Dose Estimates

NASA aims to deploy a fission reactor on the lunar surface by 2030 to generate 100 kWe of power for at least 10 years without maintenance or refueling. To assess system and subsystem survivability according to those requirements, a model of the reactor pallet was created in the radiation transport code MCNP to determine the neutron fluences and gamma doses that the materials and systems would be exposed to. The model was based on the 2025 government design. The model indicated that the control drum motors, Brayton cycle engines, and pipes and valves would be exposed to neutron fluences of 1×10 15 – 1×10 16 n/cm 2 per year and gamma doses ranging from 10 to 500 Mrad per year. The electronics box housing the instrumentation and control elements is expected to receive 1×10 14 – 1×10 15 n/cm 2 per year and gamma doses in the range of 1–5 Mrad per year. These doses necessitate that the control drum motors, Brayton cycle engines, valve components, control electronics, and other components be radiation-hardened (>10 16 n/cm 2 and >10 Mrad gamma dose) or additionally shielded to survive the 10-year lunar mission.

Radiation-Hardened Materials

What is the Quark-Gluon Plasma made of?

This article surveys our present understanding of the internal structure of the fully developed quark-gluon plasma at temperatures outside the crossover region. The theoretical part of the review covers perturbative and nonperturbative approaches to quark-gluon plasma structure, in particular, hard-thermal loop effective theory, lattice QCD and the functional renormalization group. The phenomenological part of the review scrutinizes the information that has been derived from bulk observables and hard probes in relativistic heavy ion collisions in terms of how it informs our knowledge about the structure of the quark-gluon plasma. The final section lists possible avenues for future progress.

FOS: Physical sciences