Search NASA⌕ Search

SEARCH · Search NASA

Results for “MAINTENANCE - AIRPLANES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Software maintenance in scientific and engineering environments: An introduction and guide

The purpose of software maintenance techniques is addressed. The aims of perfective, adaptive and corrective software maintenance are defined and discussed, especially in the NASA research environment. Areas requiring maintenance, and tools available for this, and suggestions for their use are made. Stress is placed on the organizational aspect of maintenance at both the individual and group level. Particular emphasis is placed on the use of various forms of documentation as the basis around which to organize. Finally, suggestions are given on how to proceed in the partial or complete absence of such documentation.

Wright, David↗

EMMA: The expert system for munition maintenance

Expert Missile Maintenance Aid (EMMA) is a first attempt to enhance maintenance of the tactical munition at the field and depot level by using artificial intelligence (AI) techniques. The ultimate goal of EMMA is to help a novice maintenance technician isolate and diagnose electronic, electromechanical, and mechanical equipment faults to the board/chassis level more quickly and consistently than the best human expert using the best currently available automatic test equipment (ATE). To this end, EMMA augments existing ATE with an expert system that captures the knowledge of design and maintenance experts. The EMMA program is described, including the evaluation of field-level expert system prototypes, the description of several study tasks performed during EMMA, and future plans for a follow-on program. This paper will briefly address several study tasks performed during EMMA. The paper concludes with a discussion of future plans for a follow-on program and other areas of concern.

Mullins, Barry E.↗

Maintenance = reuse-oriented software development

Maintenance is viewed as a reuse process. In this context, a set of models that can be used to support the maintenance process is discussed. A high level reuse framework is presented that characterizes the object of reuse, the process for adapting that object for its target application, and the reused object within its target application. Based upon this framework, a qualitative comparison is offered of the three maintenance process models with regard to their strengths and weaknesses and the circumstances in which they are appropriate. To provide a more systematic, quantitative approach for evaluating the appropriateness of the particular maintenance model, a measurement scheme is provided, based upon the reuse framework, in the form of an organized set of questions that need to be answered. To support the reuse perspective, a set of reuse enablers are discussed.

Basili, Victor R.↗

Human factors in aircraft maintenance and inspection

The events which have led to the intensive study of aircraft structural problems have contributed in no less measure to study of the human factors which influence aircraft maintenance and inspection. Initial research emphasis on aging aircraft maintenance and inspection has since broadened to include all aircraft types, both new and old. The role of today's aircraft maintenance workforce is indeed a complex one as it is strongly influenced by the need to maintain the broad technology mix embodied in the current fleet. Technicians must be equally adept at diagnosing and repairing "old-tech" 727, DC-9 type aircraft and "new-tech" 767, and MD-ll's. Their skills must include ability to repair sheet metal and composite materials; control cables and flyby-wire systems; round dials and glass cockpits. Their work performance is heavily influenced by others such as designers, technical writers, job card authors, schedulers and trainers. This paper describes activities concerning aircraft maintenance and inspection human factors.

Aging Aircraft↗

Maintenance and resupply in the unpressurized environment - Design and operational concepts for the Space Station Freedom logistics carriers

A significant percentage of the maintenance tasks for Space Station Freedom are anticipated to be conducted in the unpressurized environment. The maintenance concept for this environment essentially involves the removal and replacement of relatively large orbital replacement units (ORUs). Major constraints will be the on-orbit availability of both crew time and spare ORUs. The challenge presented to the program will be the performance of unpressurized cargo resupply that provides maximum cargo-carrying capability (mass and volume) and flexibility (type and quantity), while minimizing the impact to maintenance task times. The design of the logistics carriers is a critical component for successful resupply and maintenance operations, and to the success of Space Station Freedom.

Creps, Gary M.↗

TCMS operations and maintenance philosophy

The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

Buehler, David P.↗

XMM instrument on-board software maintenance concept

While the pre-launch responsibility for the production, validation and maintenance of instrument on-board software traditionally lies with the experimenter, the post-launch maintenance has been the subject of ad hoc arrangements with the responsibility shared to different extent between the experimenter, ESTEC and ESOC. This paper summarizes the overall design and development of the instruments on-board software for the XMM satellite, and describes the concept adopted for the maintenance of such software post-launch. The paper will also outline the on-board software maintenance and validation facilities and the expected advantages to be gained by the proposed strategy. Conclusions with respect to adequacy of this approach will be presented as well as recommendations for future instrument on-board software developments.

Peccia, N.↗

Integrated Logistics Support Analysis of the International Space Station Alpha, Background and Summary of Mathematical Modeling and Failure Density Distributions Pertaining to Maintenance Time Dependent Parameters

The process of predicting the values of maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle costs, spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability and maintenance support costs. There are two types of parameters in the logistics and maintenance world: a. Fixed; b. Variable Fixed parameters, such as cost per man hour, are relatively easy to predict and forecast. These parameters normally follow a linear path and they do not change randomly. However, the variable parameters subject to the study in this report such as MTBF do not follow a linear path and they normally fall within the distribution curves which are discussed in this publication. The very challenging task then becomes the utilization of statistical techniques to accurately forecast the future non-linear time dependent variable arisings and events with a high confidence level. This, in turn, shall translate in tremendous cost savings and improved availability all around.

Sepehry-Fard, F.↗

TOPEX/Poseidon orbit maintenance for the first five years

The TOPEX/Poseidon orbit maintenance strategy was changed following launch to include the effects of observed unmodeled, and hence anomalous, along-track accelerations. The anomalous force causes the semi-major axis, a, to either increase (called "boost") or decrease ("deboost" or "decay") depending on the satellite attitude and solar array pitch angle offset. Although this force is the most uncertain parameter in ground track prediction, it has been used as a passive technique for orbit maintenance, thereby reducing the number of propulsive maneuvers, enhancing maneuver spacing, and to place maneuvers at convenient times. This passive technique was first demonstrated in May 1993. The TOPEX/Poseidon orbit has been uniquely maintained using both passive (non-propulsive) and active (propulsive) maneuvers. Furthermore, the orbit has been maintained using only the passive technique since the ninth orbit maintenance maneuver on January 15, 1996. Only nine orbit maintenance maneuvers have been required to maintain the ground track, including verification site over flights, since achieving the operational orbit on September 21, 1992 (mission requirement: 95% within +/- l km). During this period, a has varied within 7,714,429 +/- 7 m, while the inclination i periodically fluctuated in the range 66.0408 deg. +/- 0.0040 deg. The frozen orbit (required e < 0.001 and omega approximately equals to 90 deg.) has been maintained without any dedicated eccentricity maneuvers. The frozen eccentricity vector has completed two periodic cycles and it is currently tracing its third cycle (period approximately equals 26.7 months).

Bhat, R. S.↗

Spacecraft Onboard Software Maintenance: An Effective Approach which Reduces Costs and Increases Science Return

Flight software (FSW) is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are dealing almost entirely with onboard software. This software, even more than ground/flight communications systems, is expected to perform perfectly at all times during all phases of on-orbit mission life. Due to the fact that FSW can be reconfigured and reprogrammed to accommodate new spacecraft conditions, the on-orbit FSW maintenance team is usually significantly responsible for the long-term success of a science mission. Failure of FSW can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to staffing on-orbit software maintenance, namely: (1) using the original developers, (2) using mission operations personnel, or (3) assembling a Center of Excellence for multi-spacecraft on-orbit FSW support. This paper explains a National Aeronautics and Space Administration, Goddard Space Flight Center (NASA/GSFC) experience related to the roles of on-orbit FSW maintenance personnel. It identifies the advantages and disadvantages of each of the three approaches to staffing the FSW roles, and demonstrates how a cost efficient on-orbit FSW Maintenance Center of Excellence can be established and maintained with significant return on the investment.

Shell, Elaine M.↗

Four-Formation In-Track Configuration Maintenance Strategy

The aim of this paper is to present the analysis conducted by CNES for the maintenance of a formation made of several LEO satellites (typically 4) in several planes (typically 2), 100 km or so apart from each other. The along-track separations between the satellites have to be controlled to within 15 km thanks to orbit correction maneuvers supposed to be performed every 2 weeks. The main difficulty is related to solar activity which is expected to be close to its maximum for the entire mission s lifespan. As a matter of fact, a high solar activity makes orbit prediction harder, and makes it impossible to keep the altitude of the formation constant. Thus, a specific relative maintenance strategy had to be devised in order to meet the mission's requirements. The first part provides a few elements on the mission analysis process that has taken place. The method used for the evaluation of the maneuver frequency is detailed, based on the evaluation of the effects of atmospheric drag on the orbit. The second part is dedicated to the maintenance strategy that has been designed, and particularly to the computation of the reference orbits and of the velocity increments that enable the in-track inter-satellite distances to be maintained within the desired bounds. Finally a few simulation results are presented; they enable the performance of the maintenance strategy to be checked in a more realistic context.

Lamy, Alain↗

A Proposed Approach for Prioritizing Maintenance at NASA Centers

The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.

Dunn, Steven C.↗

Shuttle Repair Tools Automate Vehicle Maintenance

Successfully building, flying, and maintaining the space shuttles was an immensely complex job that required a high level of detailed, precise engineering. After each shuttle landed, it entered a maintenance, repair, and overhaul (MRO) phase. Each system was thoroughly checked and tested, and worn or damaged parts replaced, before the shuttle was rolled out for its next mission. During the MRO period, workers needed to record exactly what needed replacing and why, as well as follow precise guidelines and procedures in making their repairs. That meant traceability, and with it lots of paperwork. In 2007, the number of reports generated during electrical system repairs was getting out of hand-placing among the top three systems in terms of paperwork volume. Repair specialists at Kennedy Space Center were unhappy spending so much time at a desk and so little time actually working on the shuttle. "Engineers weren't spending their time doing technical work," says Joseph Schuh, an electrical engineer at Kennedy. "Instead, they were busy with repetitive, time-consuming processes that, while important in their own right, provided a low return on time invested." The strain of such inefficiency was bad enough that slow electrical repairs jeopardized rollout on several occasions. Knowing there had to be a way to streamline operations, Kennedy asked Martin Belson, a project manager with 30 years experience as an aerospace contractor, to co-lead a team in developing software that would reduce the effort required to document shuttle repairs. The result was System Maintenance Automated Repair Tasks (SMART) software. SMART is a tool for aggregating and applying information on every aspect of repairs, from procedures and instructions to a vehicle s troubleshooting history. Drawing on that data, SMART largely automates the processes of generating repair instructions and post-repair paperwork. In the case of the space shuttle, this meant that SMART had 30 years worth of operations that it could apply to ongoing maintenance work. According to Schuh, "SMART standardized and streamlined many shuttle repair processes, saving time and money while increasing safety and the quality of repairs." Maintenance technicians and engineers now had a tool that kept them in the field, and because SMART is capable of continually evolving, each time an engineer put it to use, it would enrich the Agency-wide knowledge base. "If an engineer sees something in the work environment that they could improve, a repair process or a procedure, SMART can incorporate that data for use in future operations," says Belson.

Source record↗

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

NASA Critical Facilities Maintenance Assessment

Critical Facilities Maintenance Assessment (CFMA) was first implemented by NASA following the March 2000 overtest of the High Energy Solar Spectroscopic Imager (HESSI) spacecraft. A sine burst dynamic test using a 40 year old shaker failed. Mechanical binding/slippage of the slip table imparted 10 times the planned force to the test article. There was major structural damage to HESSI. The mechanical "health" of the shaker had not been assessed and tracked to assure the test equipment was in good working order. Similar incidents have occurred at NASA facilities due to inadequate maintenance (e.g., rainwater from a leaky roof contaminated an assembly facility that housed a spacecraft). The HESSI incident alerted NASA to the urgent need to identify inadequacies in ground facility readiness and maintenance practices. The consequences of failures of ground facilities that service these NASA systems are severe due to the high unit value of NASA products.

maintenance↗

Staffing Strategies for Maintenance of Critical Software Systems at the Jet Propulsion Laboratory

The Mission Design and Navigation Software Group at the Jet Propulsion Laboratory (JPL) maintains mission critical software systems. We have good empirical data and models for maintenance demand—when defects will occur, how many and how severe they will be, and how much effort is needed to address them. However, determining the level of staffing needed to address maintenance issues is an ongoing challenge and is often done ad-hoc. There are two common strategies are (1) reactive – add/remove staff as needed to respond to maintenance issues, and (2) capacitive – retain a given staff size to address issues as they occur, proactively address issues and prevent defects.

software maintenance↗

Detection of structural deterioration and associated airline maintenance problems

Airline operations involving the detection of structural deterioration and associated maintenance problems are discussed. The standard approach to the maintenance and inspection of aircraft components and systems is described. The frequency of inspections and the application of preventive maintenance practices are examined. The types of failure which airline transport aircraft encounter and the steps taken to prevent catastrophic failure are reported.

Henniker, H. D.↗

Operation and maintenance, fire rescue air-pack. Volume 2: Communications

The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.

Source record↗