Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution

To leverage the fast-ramping capability of resources to provide great value to the grid, electricity system operators such as the Midcontinent Independent System Operator (MISO) continue to evolve their approaches for integrating energy storage resources, including pumpedstorage hydro (PSH), into the electricity markets. However, new challenges arise in modeling and optimizing these energy-limited resources across multiple market clearing processes and planning studies with uncertainties and imperfect information. For instance, current market practices of PSH owners specifying pumping/generating hours can result in sub-optimal generation dispatch. Letting grid operators optimize PSH with the consideration of multiple operating modes and energy limitation constraints can potentially bring economic benefits to both the system and the PSH owners. However, in multi-stage clearing process of electricity markets, utilizing the PSH flexibility to deal with realized uncertainties can cause deviation in the multi-stage scheduling processes. The resulting financial risks from the schedule deviation may not be acceptable to PSH owners. In addition, to effectively utilize this energy limited resource, the state of charge (SOC) constraints of PSH needs to be continuously optimized and the marginal cost of deviation need to reflect the expected cost to purchase or sell energy at future times to compensate for deviations. This project aims to develop a prototype enhanced PSH model and improved price signals in the multi-stage market clearing process with proper consideration of the unique characteristics of PSH, in order to better align underlying PSH capabilities with evolving grid needs, particularly including the needs for more frequent and larger cycling to manage variability and uncertainty from renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land-Based Wind Market Report: 2022 Edition

The U.S. Department of Energy's 2022 edition of its Land-Based Wind Market Report provides an overview of key trends in the U.S. wind power market, with a focus on 2021. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Despite ongoing supply chain challenges, wind energy in 2021 continued to see strong growth, technology improvements, and low prices in the U.S. Key highlights include: Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a strong pace in 2021, with the 13.4 GW of new additions representing a $\$20$ billion investment and 32% of all newly added U.S. generation capacity. Wind energy output rose to account for more than 9% of the entire nation’s electricity supply. At least 247 GW of wind are seeking transmission interconnection; 77 GW of this capacity are offshore wind and 19 GW are hybrid plants that pair wind with storage or solar PV. Wind project performance has increased over the decades: The average capacity factor among recently built projects was nearly 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2011, no turbines employed blades that were 115 meters in diameter or larger, but in 2021, 89% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices averaged $\$800$–$\$950$/kW in 2021, a 5% to 10% increase from the year prior but substantially lower than in 2010. The average installed cost of wind projects in 2021 was $\$1,500$/kW, down more than 40% since the peak in 2010, though relatively stable in recent years. The lowest costs were found in Texas and the (non-ISO) West. Wind energy prices are on the rise, but generally remain low, around $\$20$/MWh in the interior of the country with higher prices in the West and East. After topping out above $\$75$/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped—though supply-chain pressures have resulted in increased prices in recent years. In the interior ‘wind belt’ of the country, recent pricing is around $\$20$/MWh. In the West and East, prices tend to average above $\$30$/MWh. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind increased in 2021, averaging $\$16$/MWh in MISO, $\$19$/MWh in SPP, $\$23$/MWh in NYISO, $\$31$/MWh in ERCOT, $\$33$/MWh in PJM, $\$44$/MWh in ISO-NE, and $\$48$/MWh in CAISO. The average levelized cost of wind energy was $\$32$/MWh for plants built in 2021: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography. The national average stood at $\$32$/MWh in 2021—down substantially historically, though relatively stable in recent years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. The health and climate benefits of wind in 2021 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of over $\$90$/MWh-wind for plants built in 2021.

17 WIND ENERGY↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Average and Marginal Capacity Credit Values of Renewable Energy and Battery Storage in the United States Power System

As deployment of renewable resources and storage continue to significantly grow in the coming decades, these technologies will play increasingly important roles in maintaining power systems' resource adequacy. Few analyses so far offer comprehensive comparisons of forward-looking average and marginal capacity credits of variable renewable energy and storage in the U.S. interconnections across a wide range of possible futures. To fill this research gap, we quantify the average and marginal capacity credits of solar PV, onshore and offshore wind, and batteries between 2026 and 2050 across the U.S power systems to examine the temporal trends, spatial patterns, and trade-offs between these two capacity accreditation approaches. Across technologies, capacity credits of solar PV most clearly follow downward trends over time, reflecting the significant rise in solar PV generation share as the grid decarbonizes. While battery storages' generation shares also rise significantly over time, their capacity credits always remain stably high due to their capabilities to be dispatched strategically during critical periods to maintain reliability. On the other hand, capacity credits of wind technologies in general follow slight upward trends as their generation shares level off. There are strong spatial variabilities of both average and marginal capacity credits across technologies, but capacity credits of solar PV displaying the most obvious spatial patterns with high capacity credits concentrating in wind-rich, solar-poor regions in SPP, PJM, and MISO, suggesting potential reliability benefits of interconnection-wide planning for renewable energy deployments. Additionally, except for offshore wind, average capacity credits of all other renewable technologies tend to be higher than their marginal capacity credits, indicating that existing renewable resources tend to be accredited higher than new resources at almost any time.

25 ENERGY STORAGE↗

Empirical Indicators of Transmission Value in the Southeast United States

Concurrent differences in energy price between different parts of the electric grid are a key indicator of the value of additional transmission. In areas without a wholesale electricity market, such as the Southeast, an alternative indicator to price is the Federal Energy Regulatory Commission’s (FERC) system lambda data. This economic metric represents the minimized marginal production costs of thermal generators, including fuel and other variable operation and maintenance expenses. Balancing Authorities report a single system lambda for their entire balancing area. Most Southeastern lambdas exhibit sufficient price variation to support a transmission valuation analysis, although incomplete accounting of congestion costs or scarcity rents during peak load hours may underestimate the true value of transmission capacity. With transmission value defined as the annual average hourly absolute price difference between two regions and FERC’s system lambda data used as a price proxy, we find the following results in the Southeast region during 2012-2023 (reported in $\$2024$/MWh): Intra‐regional findings: Annual averages historically span $\$2$–$\$28$/MWh and average $\$12$/MWh in SERTP and span $\$4$–$\$19$/MWh and average $\$9$/MWh in FRCC, disregarding transmission value driven by anomalous data. The ranges of transmission value reported here are large, spanning an order of magnitude in some cases. Much of this variation is driven by year-to-year changes, with 2022 having a particularly high intra-regional transmission value due to elevated natural gas prices. Inter‐regional corridors: Annual average transmission values across three broader regions range from $\$6$ to $\$28$/MWh with a long-term average of $\$11$/MWh. Much of the transmission value is concentrated in a small portion of hours. Across all regions, severe weather—particularly polar vortex events in January 2018, February 2021, and December 2022—drives the largest price spreads. Seasonal patterns also emerge, with summer afternoons and fall mornings contributing consistently to transmission value, as for example between MISO and SOCO in 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Wind Ramping Product Formulations in a Ramp-Constrained Power Grid

Flexible ramping products are designed to compensate the variability and uncertainty of load and intermittent generation. Since their market implementation by the California Independent System Operator (CAISO) and Midcontinent System Operator (MISO), flexible ramping products have garnered much attention. However, it is still unclear how to best formulate wind power plants’ participation in the ramping requirement. This paper investigates different wind ramping product formulations and increasing wind power penetration in the context of a security-constrained unit commitment (SCUC) model. We demonstrate that the ramping model that captures both the intra- and inter-temporal output ramp capability of individual wind power plants reflects the true ramp contribution of the wind fleet. With increasing wind penetration, wind generation curtailments can support the grid’s ramping needs. In addition, we found that increased wind penetration has the potential of lowering ramping and production costs. Numerical case studies performed on the TAMU 2000-bus synthetic network support the findings.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

The transmission ramifications of social and environmental siting considerations on wind energy deployment

Increasing the capacity of wind power is critical to achieving climate goals, however its continued deployment faces environmental and social siting challenges. For example, the United States government is increasingly emphasizing the importance of a just energy transition by considering the social impacts of energy and environmental justice (EEJ). In this study, we investigate the impact of considering available EEJ metrics and environmental impacts into siting wind power and transmission by applying SimWIND PRO . SimWIND PRO is an infrastructure optimization tool that can site wind energy technologies and transmission by concurrently considering wind resource potential, transmission costs, EEJ, and environmental impacts. We demonstrate the impacts of considering EEJ and environmental factors in the context of Midcontinent Independent System Operator’s (MISO) western region, which includes some of the best wind energy potential in the United States. We show that prioritizing EEJ and environmental considerations in wind deployment can result in exponentially more transmission deployment for the same amount of wind power delivered, and results in selecting different wind farm sites. Our results also show that, depending on how it is considered, it is possible that constraining sites based on EEJ and environmental factors can reduce the available capacity of wind energy enough that energy transition capacity targets cannot be met.

17 WIND ENERGY↗

Offshore Wind Farm Turbine and Energy Storage Optimization

Abstract This paper evaluates the technical and economic feasibility of repurposing decommissioned offshore oil and gas platforms as electrical substations for offshore wind projects in the U.S. Gulf of America, a region characterized by relatively low and highly variable wind speeds, extensive legacy offshore infrastructure, and exposure to merchant electricity markets. A unified techno-economic framework is developed using the Repurposing Offshore Infrastructure for Continued Energy (ROICE) Economic Model (REM) to integrate Gulfspecific wind resource assessment, commercial wind turbine performance, offshore infrastructure cost modeling, and wholesale electricity market exposure. Gulf wind speed data are vertically extrapolated to turbine hub height and combined with manufacturer power curves to compute annual energy production and capacity factors across a broad portfolio of commercial turbines, enabling identification of turbine designs best suited for low-wind offshore environments. Hourly electricity price data from the Midcontinent Independent System Operator (MISO) day-ahead market are incorporated to characterize revenue potential, price volatility, and the temporal alignment between wind generation and market conditions. In addition, a conceptual framework for offshore battery energy storage system (BESS) integration is developed to support future investigation of market-responsive energy shifting at repurposed platforms. Results from the turbine evaluation demonstrate that machines with lower cut-in wind speeds and earlier ‘rated-power’ characteristics significantly outperform larger, industry-standard offshore turbines for the same net power under Gulf wind conditions, underscoring the need for region-specific technology selection. Market analysis further reveals substantial price variability and limited intrinsic alignment between wind production and high-price periods, motivating consideration of operational flexibility mechanisms. While storage optimization is not implemented in this study, the REM framework establishes a transparent and replicable foundation for co-evaluating turbine selection, infrastructure constraints, and market exposure, providing a practical pathway for assessing the potential role of repurposed offshore platforms in enabling economically viable offshore wind development in the Gulf of America.

02 PETROLEUM↗

NREL Price Series Developed for the ARPA-E FLECCS Program

The price data for four regions (CAISO, ERCOT, MISO-W, and PJM-W) are developed using the ReEDS to PLEXOS conversion as described in (Gagnon et al. 2020). The reference ReEDS case chosen is based on the 2020 Standard Scenario Mid-case, which uses the 2020 ReEDS model version (Cole et al. 2020; Ho et al. 2021). All ReEDS model inputs use 2020 Standard Scenarios Mid-case assumptions except for CO2 prices, which are implemented as linearly increasing CO2 price trajectories beginning at $0/tCO2 in 2020 and ending at either $100/tCO2 or $150/tCO2 in 2035 to dive capacity expansion towards a low-carbon system that could support CCS deployment. However, these scenarios also prohibit CCS deployment in this time frame so that resulting price data are not influenced by the deployment and operation of CCS itself. Implementing the ReEDS to PLEXOS conversion tool, PLEXOS is then simulated using the 2035 ReEDS infrastructure for both CO2 price scenarios, with the following model version and setup: PLEXOS Version: 8.2 Solver: Xpress-MP 35.01.01 Mixed integer optimization relative gap 1% System configuration: • Total number of nodes: 134 (consistent with ReEDS balancing areas) • Line losses enforced using piecewise linear approximation • Energy dump was enabled Price data is aggregated to the ISO/RTO level using load-weighted averages. References: Cole, Wesley, Sean Corcoran, Nathaniel Gates, Daniel Mai, Trieu, and Paritosh Das. 2020. “2020 Standard Scenarios Report: A U.S. Electricity Sector Outlook.” NREL/TP-6A20-77442. Golden, CO: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy21osti/77442.pdf. Gagnon, Pieter, Will Frazier, Elaine Hale, and Wesley Cole. 2020. “Cambium Documentation: Version 2020.” NREL/TP-6A20-78239. National Renewable Energy Lab. (NREL), Golden, CO (United States). https://doi.org/10.2172/1734551. Ho, Jonathan, Jonathon Becker, Maxwell Brown, Patrick Brown, Ilya (ORCID:0000000284917814) Chernyakhovskiy, Stuart Cohen, Wesley (ORCID:000000029194065X) Cole, et al. 2021. “Regional Energy Deployment System (ReEDS) Model Documentation: Version 2020.” NREL/TP-6A20-78195. Golden, CO: National Renewable Energy Laboratory. https://doi.org/10.2172/1788425.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tornadoes and downbursts in the context of generalized planetary scales

In order to cover a wide range of horizontal dimensions of airflow, the paper proposes a series of five scales, maso, meso, miso (to be read as my-so), moso and muso arranged in the order of the vowels, A, E, I, O, U. The dimensions decrease by two orders of magnitude per scale, beginning with the planet's equator length chosen to be the maximum dimension of masoscale for each planet. Mesoscale highs and lows were described on the basis of mesoanalyses, while sub-mesoscale disturbances were depicted by cataloging over 20,000 photographs of wind effects taken from low-flying aircraft during the past 15 years. Various motion thus classified into these scales led to a conclusion that extreme winds induced by thunderstorms are associated with misoscale and mososcale airflow spawned by the parent, mesoscale disturbances.

Fujita, T. T.↗

MN Solar Pathways: Solar Potential Analysis of Minnesota-sited generation

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Clean Power Research completed a scenario-based analysis that estimates and optimizes the levelized cost of capacity for resource additions to generate 10% of Minnesota’s electricity from solar by 2025 and 70% of Minnesota’s electricity from solar and wind by 2050, using generation resources located only in Minnesota. The analysis concludes that it can be cheaper to overbuild solar + wind and curtail surplus than to store all generation. The analysis described in this report was followed by a second analysis completed in 2020 that used the same modeling framework from the Minnesota study to analyze high renewables penetrations across the Midcontinent Independent System Operator(MISO) region.

14 SOLAR ENERGY↗

Integration of Energy Storage in Fossil Energy Power Plants (ES-FE) Market Analysis

This analysis consists of identifying the economic signals for the integration of ES-FE concepts in major Independent System Operators (ISOs), such as Mid-Continent (MISO), Electric Reliability Council of Texas (ERCOT), California (CAISO), and Pennsylvania, Jersey, Maryland Power Pool (PJM). This piece of work came from our interest in understanding how and at what level an electricity market would renumerate a fossil energy power plant that integrates energy storage, meaning a fossil power plant that adds any type of energy storage to their power plant.

Pena-Cabra, Ivonne A.↗

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗