Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maintenance engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Software Engineering Laboratory (SEL) Data Base Maintenance System (DBAM) user's guide and system description

The Software Engineering Laboratory (SEL) Data Base Maintenance System (DBAM) is explained. The various software facilities of the SEL, DBAM operating procedures, and DBAM system information are described. The relationships among DBAM components (baseline diagrams), component descriptions, overlay descriptions, indirect command file listings, file definitions, and sample data collection forms are provided.

Lo, P. S.↗

Commercial Aircraft Maintenance Experience Relating to Engine External Hardware

Airlines are extremely sensitive to the amount of dollars spent on maintaining the external engine hardware in the field. Analysis reveals that many problems revolve around a central issue, reliability. Fuel and oil leakage due to seal failure and electrical fault messages due to wire harness failures play a major role in aircraft delays and cancellations (D&C's) and scheduled maintenance. Correcting these items on the line requires a large investment of engineering resources and manpower after the fact. The smartest and most cost effective philosophy is to build the best hardware the first time. The only way to do that is to completely understand and model the operating environment, study the field experience of similar designs and to perform extensive testing.

Soditus, Sharon M.↗

Bioreactor perfusion system for the long-term maintenance of tissue-engineered skeletal muscle organoids

Three-dimensional skeletal muscle organ-like structures (organoids) formed in tissue culture by fusion of proliferating myoblasts into parallel networks of long, unbranched myofibers provide an in vivo-like model for examining the effects of growth factors, tension, and space flight on muscle cell growth and metabolism. To determine the feasibility of maintaining either avian or mammalian muscle organoids in a commercial perfusion bioreactor system, we measured metabolism, protein turnover. and autocrine/paracrine growth factor release rates. Medium glucose was metabolized at a constant rate in both low-serum- and serum-free media for up to 30 d. Total organoid noncollagenous protein and DNA content decreased approximately 22-28% (P < 0.05) over a 13-d period. Total protein synthesis rates could be determined accurately in the bioreactors for up to 30 h and total protein degradation rates could be measured for up to 3 wk. Special fixation and storage conditions necessary for space flight studies were validated as part of the studies. For example, the anabolic autocrine/paracrine skeletal muscle growth factors prostaglandin F2alpha (PGF2alpha) and insulin-like growth factor-1 (IGF-1) could be measured accurately in collected media fractions, even after storage at 37 degrees C for up to 10 d. In contrast, creatine kinase activity (a marker of cell damage) in collected media fractions was unreliable. These results provide initial benchmarks for long-term ex vivo studies of tissue-engineered skeletal muscle.

NASA Discipline Musculoskeletal↗

System Engineers and Decisions: It?s All about Knowledge

In order to guarantee that a system meets adequate levels of reliability and availability, system performances are continuously monitored and analyzed thanks to the technological advancements driving the Industry 4.0 revolution. An Industry 4.0 approach is typically based on advanced statistical, big data mining, machine learning, and internet-of-things methods designed to detect anomalies in the behavior of system, detect the most likely failure modes, and provide indications to system engineers on when maintenance activities should be performed before system performance are deemed unacceptable (which can be generated by diagnostic and prognostic methods). However, these analyses, which are designed to automatize and increase the efficacy of the system maintenance program, require large amount of data which can come in various forms: numeric, textual, images, sounds etc. Such data constitutes the historic knowledge benchmark to track system performances and support system engineer decisions. Here we claim that data is not sufficient to support this kind of analyses when applied to systems characterized by complex architectures and behaviors. Robust system engineer decisions require the ability to understand the system operational context that lies behind the observed data elements. In this respect, system models are in fact necessary to “put data in context” and capture relationships between data elements. Industry 4.0 methods require in fact contextual knowledge as a basis upon which hypotheses can be generated and assumptions tested. In our view, for complex systems, model-based system engineering (MBSE) models can afford this contextual knowledge, as they are typically used to describe systems architecture and dynamic behaviors. System knowledge is here intended as the blending of collected data and system architecture which takes the form of a “knowledge graph”. A knowledge graph is a database which consists of a large set of nodes (in our case an entity can be either a data or an MBSE element) which are linked to each other. The types of nodes and links follow a pre-defined topology, sometimes also refers as an ontology, that is designed to fit the actual decisions that needs to be performed. We show here how a knowledge graph can be defined to support system engineer maintenance decisions and how the same graph can be built based on system MBSE models and pre-processed data from numeric (through anomaly detections and diagnostic methods) and textual elements (through technical language processing TLP).

97 - MATHEMATICS AND COMPUTING↗

Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025

This report documents the operations, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) and its supporting infrastructure during FY2024. The METL facility had a very successful seventh year of operations while supporting the testing of multiple test article experiments in the facility. The METL facility continued supporting the Gear Test Assembly (GTA) testing and the Thermal Hydraulic Experimental Test Article (THETA) with the full testing with both the primary and secondary systems. Work to accommodate two additional experiments, a flow sensor test article (F-STAr) gripper test and a fuel handling gripper test article (GrTA) continued as they are expected to undergo testing in METL in FY2025. In addition, a new 18” test article, the Sample Testing Basket (STB) was used a few times to provide screening tests for sodium service materials. A fifth test vessel was installed in the location of Test Vessel 6, and a wet vapor nitrogen sodium processing system was developed and initially tested.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aerojet advanced engine concept

The future orbit transfer vehicle (OTV) requirements which dictate the need for a highly versatile, highly reliable, reusable propulsion module are discussed. To attain maximum operational economy, space-basing is essential. This requires a reusable, maintenance free engine. The design features of this space based engine are defined. A new engine cycle and its advantages allow all the maintenance goals to be attained. Rubbing contact and interpropellant seals and purges are eliminated when GO2 is used to drive the LO2 pump. The TPA design has only one moving part. The use of both GH2 and GO2 to drive the turbines lowers the turbine temperatures in addition lower GH2 temperatures and pressures improve chamber cooling and longer life. The use of GO2 as a turbine drive fluid is addressed. Space based engines require an integrated control and health monitoring system to improve system reliability and eliminate all scheduled maintenance. It is concluded that all OTV propulsion requirements can be fulfilled with a single engine. The technological developments required to demonstrate that engine are outlined.

Schoenman, L.↗

Lean Stability augmentation study

An analytical and experimental program was conducted to investigate techniques and develop technology for improving the lean combustion limits of premixing, prevaporizing combustors applicable to gas turbine engine main burners. Three concepts for improving lean stability limits were selected for experimental evaluation among twelve approaches considered. Concepts were selected on the basis of the potential for improving stability limits and achieving emission goals, the technological risks associated with development of practical burners employing the concepts, and the penalties to airline direct operating costs resulting from decreased combustor performance, increased engine cost, increased maintenance cost and increased engine weight associated with implementation of the concepts. Tests of flameholders embodying the selected concepts were conducted.

Mcvey, J. B.↗

Deploying Extended Reality (XR) for Digital Operations and Maintenance (O&M) at the Mechanisms Engineering Test Loop (METL)

This report documents the preliminary efforts to digitize operation and maintenance (O&M) activities for the Mechanisms Engineering Test Loop (METL). METL became operational in September 2018 with the mission to provide an ecosystem for Advanced Reactor Development (ARD). METLs flagship facility’s primary purpose is conducting small to intermediate scale tests for Sodium Fast Reactors (SFR). Its resemblance to commercial SFR’s intermediate heat transport system, prototypic operating conditions, and industrial construction practices/materials provides the overarching benefit of establishing a proving ground for emerging operations and maintenance (O&M) activities such as incorporating Extended Reality (XR) applications throughout the program lifecycle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Facility Condition Assessments to Identify Actions Related to Infrastructure

To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.

Rubert, Kennedy F.↗

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Schwabacher, Mark A.↗

Hillsborough County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Hillsborough County used the Clear Sky Decision Support Toolkit to analyze solar + storage as an additional resiliency feature at its Brandon Support Operation Complex (BSOC). During normal operations, the BSOC houses water utility administration services and workspaces for water and wastewater engineers, facilities maintenance, and environmental management staff. During emergency management activation, the BSOC serves as an emergency hub for Emergency Support Function 3 (ESF-3), which includes public utilities, public works, and engineering staff support members. The BSOC is designated as a critical facility by the County.

14 SOLAR ENERGY↗

Engine Development Design Margins Briefing Charts

New engines experience durability problems after entering service. The most prevalent and costly is the hot section, particularly the high-pressure turbine. The origin of durability problems can be traced back to: 1) the basic aero-mechanical design systems, assumptions, and design margins used by the engine designers, 2) the available materials systems, and 3) to a large extent, aggressive marketing in a highly competitive environment that pushes engine components beyond the demonstrated capability of the basic technology available for the hardware designs. Unfortunately the user must operate the engine in the service environment in order to learn the actual thrust loading and the time at max effort take-off conditions used in service are needed to determine the hot section life. Several hundred thousand hours of operational service will be required before the demonstrated reliability of a fleet of engines or the design deficiencies of the engine hot section parts can be determined. Also, it may take three to four engine shop visits for heavy maintenance on the gas path hardware to establish cost effective build standards. Spare parts drive the oerator's engine maintenance costs but spare parts also makes lots of money for the engine manufacturer during the service life of an engine. Unless competition prevails for follow-on engine buys, there is really no motivation for an OEM to spend internal money to improve parts durability and reduce earnings derived from a lucrative spare parts business. If the hot section life is below design goals or promised values, the OEM migh argue that the engine is being operated beyond its basic design intent. On the other hand, the airframer and the operator will continue to remind the OEM that his engine was selected based on a lot of promises to deliver spec thrust with little impact on engine service life if higher thrust is used intermittently. In the end, a standoff prevails and nothing gets fixed. This briefing will propose ways to hold competing engine manufacturers more accountable for engine hot section design margins during the entire Engine Development process as well as provide tools to assess the design temperature margins in the hot section parts of Service Engines.

Bentz, Chuck↗

CELCAP: A Computer Model for Cogeneration System Analysis

A description of the CELCAP cogeneration analysis program is presented. A detailed description of the methodology used by the Naval Civil Engineering Laboratory in developing the CELCAP code and the procedures for analyzing cogeneration systems for a given user are given. The four engines modeled in CELCAP are: gas turbine with exhaust heat boiler, diesel engine with waste heat boiler, single automatic-extraction steam turbine, and back-pressure steam turbine. Both the design point and part-load performances are taken into account in the engine models. The load model describes how the hourly electric and steam demand of the user is represented by 24 hourly profiles. The economic model describes how the annual and life-cycle operating costs that include the costs of fuel, purchased electricity, and operation and maintenance of engines and boilers are calculated. The CELCAP code structure and principal functions of the code are described to how the various components of the code are related to each other. Three examples of the application of the CELCAP code are given to illustrate the versatility of the code. The examples shown represent cases of system selection, system modification, and system optimization.

Source record↗