Search NASA⌕ Search

SEARCH · Search NASA

Results for “Management planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Savannah River Site nuclear materials management plan FY 2017-2031

The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclear Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Invasive Plant Management Plan for the Oak Ridge Reservation

Invasive non-native plant species have become one of the greatest ecological threats across the country and around the world. Actively managing incursions of invasive plants is crucial to maintaining ecosystems, protecting natural resources, and ensuring proper function of facilities and their support infrastructures, power lines and other utility rights-of-way (ROWs), communications structures, roadways, and waterways. Invasive plants can threaten cultural resources, public and private properties, forests, wetlands, and other natural areas through increased risks of fire and storm damage, as well as decrease native plant diversity, particularly disrupting vital habitats of threatened and endangered species, both plant and animal. In 2000, the Federal Plant Protection Act came into effect. Under this Act, federal agencies are required to develop and coordinate an undesirable plants management program for control of invasive plants on federal lands under each agency’s respective jurisdiction. The agency must adequately fund the undesirable plants management program using an Integrated Pest Management Plan. Additionally, each agency is required to implement cooperative agreements with local and state agencies, as well as other federal agencies, to manage undesirable plants on federal lands under the agency’s jurisdiction. The US Department of Energy (DOE) takes its responsibility for addressing invasive and undesirable plant issues very seriously. Many DOE sites have programs to control invasive pest plant species. DOE has taken a proactive stance toward invasive plant control, and the Invasive Plant Management Plan— created to meet regulatory requirements of federal laws, executive orders, presidential memos, contracts, and agreements on DOE’s Oak Ridge Reservation (ORR)—has been in effect since 2004. This document represents the second revision of this plan.

59 BASIC BIOLOGICAL SCIENCES↗

On the effectiveness in implementing a waste-management-plan method in construction

The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

Zeidler, Janet↗

Program Management Plan EnCore ® Accident Tolerant Fuel (ATF) Program

This Program Management Plan (PMP) is developed to support Westinghouse’s vision of developing and commercializing the Accident Tolerant Fuel. The near term goal of this Program is to deliver 2 fuel assemblies that consists of LTRs for Exelon Byron Unit 2 in spring of 2019. The longer term goal of this program is deployment of LTAs in 2022 of a mixture of coated zirconium cladding and SiC cladding with ADOPT and U3Si2 fuels. This is a high complexity program and is one of the largest research and development programs in Westinghouse and as such, the project scope is expected to change continuously. Integrated change control will be invoked as necessary. The Program consists of multiple funding streams (internal through Westinghouse innovation funding), external (through the DOE). The DOE funding consists of two phases: 1. Phase 2 – funded by DOE award number DE-NE0008222. 2. Phase 2B – funded by DOE – Westinghouse proposal reference # LTR-AMER-MKG-18-826, Rev. 1, August 23, 2018 (10/18 to 2/21), Award No. DE-NE0008824. 3. Cost share contributions from Westinghouse and program partners.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools. - Highlights: • We assessed the effectiveness of Environmental Management Plans (EMPs) for major developments, focusing on delivery of mitigation and monitoring. • EIA and Environmental Management Systems (EMS) post-consent are weakly linked. • The use of EMPs varies significantly in practise, partly due to the range of terminology used. • Linkages are hampered by poor communication and follow-up • More detailed guidance on how EMPs can successfully link with EMS is required.

54 ENVIRONMENTAL SCIENCES↗

National Renewable Energy Laboratory Wildland Fire Management Plan (August 2022-August 2025): February-August 2022

The National Renewable Energy Laboratory (NREL) is located in a moderate wildfire risk region. The region has a history of damaging wildland fire activity and is also susceptible to changing environmental conditions (drought, elevated temperatures) that may lead to an increase in wildfire frequency and consequence over time. An integrated, site-wide wildland fire management plan is required by the Department of Energy and is to be consistent with the Federal Wildland Fire Management Policy. The NREL Wildland Fire Management Plan (WFMP) provides an integrated approach to reducing risk to wildland fire at NREL. The goals of the WFMP are to protect human health and safety, protect NREL facilities and research, enhance community protection, diminish risk and consequences of wildland fires, and maintain the health of the ecosystem. The WFMP accomplishes these goals through the use of tools such as fire behavior modeling, fire growth modeling, a structure ignition risk assessment, and through the application of robust fire prevention, emergency management, and environmental programs. The NREL WFMP was developed in a collaborative manner with input from regional stakeholders including cities, counties, local fire departments, and other governmental agencies. The WFMP provides for recommendations to reduce overall wildland fire risk to life safety and property at NREL.

54 ENVIRONMENTAL SCIENCES↗

Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory

Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2015 update retains the management guidelines from the 1999 HMP for listed species, updates some descriptive information, and adds the New Mexico Meadow Jumping Mouse (Zapus hudsonius luteus) and Yellow-billed Cuckoo (Coccyzus americanus) which were federally listed in 2014 (Keller 2015: USFWS consultation number 02ENNM00- 2015-I-0538).

54 ENVIRONMENTAL SCIENCES↗

Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

Tompkins, F. G.↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use or with monitoring data.

54 ENVIRONMENTAL SCIENCES↗

Configuration and Data Management Plan for the Thermophysics Facilities

This document establishes the Configuration and Data Management Plan for the Thermophysics Facilities Branch (TSF) and describes the implementation of the plan within the organization. Its intent is to control and document changes to facility hardware, software, and facility operating procedures; to control changes to Quality System documents; to ensure that all documents and drawings are current; and to provide for quick retrieval of facility information and documentation while safeguarding original records and documents.

Jeanne A Dominguez↗

An Approach to Data Management Planning for Protected Data Projects

This report describes what is required in a data management plan for data that needs to be protected in some fashion. Here we provide an overview of what a data manager should consider, including the data ingestion and various extract-transform-load processes, metadata considerations and documentation, to what might need to be accounted for in the event of data loss. In addition, this report includes two appendices: forms that, when filled out, make the user compliant with DOE data management requirements as well as additional requirements for handling protected data at ORNL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗