Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maneuver plans”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Conjunction Assessment Screening Volume Sizing and Event Filtering in Light of Natural Conjunction Event Development Behaviors

Conjunction Assessment screening volumes used in the protection of NASA satellites are constructed as geometric volumes about these satellites, of a size expected to capture a certain percentage of the serious conjunction events by a certain time before closest approach. However, the analyses that established these sizes were grounded on covariance-based projections rather than empirical screening results, did not tailor the volume sizes to ensure operational actionability of those results, and did not consider the adjunct ability to produce data that could provide prevenient assistance for maneuver planning. The present study effort seeks to reconsider these questions based on a six-month dataset of empirical screening results using an extremely large screening volume. The results, pursued here for a highly-populated orbit regime near 700 km altitude, identify theoretical limits of screening volume performance, explore volume configuration to facilitate both maneuver remediation planning as well as basic asset protection, and recommend sizing principles that maximize volume performance while minimizing the capture of "chaff" conjunctions that are unlikely ever to become serious events.

screening volume↗

Navigation of the GRAIL Spacecraft Pair Through the Extended Mission at the Moon

The GRAIL extended mission (XM) dramatically expands the scope of GRAIL's gravity science investigation by flying the pair of spacecraft at the lowest orbit the flight team can safely support. From the perspective of the Navigation team, the low orbit altitude introduces new challenges. At this lower altitude, navigation is more sensitive to higher-order terms of the gravity field so that orbit determination solutions are more difficult and there is less certainty of achieving maneuver targets. This paper reports on the strategy and performance of the Navigation system for GRAIL's XM. On a weekly basis, the Navigation team provided reference trajectory updates, designed three maneuvers, and reconstructed the execution of those maneuvers. In all, the XM involved 55 planned maneuvers; five were canceled. The results of the Navigation team's efforts, in terms of maintaining the reference-trajectory targets, satisfying requirements, and achieving desired separation distances, are assessed.

orbit↗

Automated Target Planning for FUSE Using the SOVA Algorithm

The SOVA algorithm was originally developed under the Resilient Systems and Operations Project of the Engineering for Complex Systems Program from NASA s Aerospace Technology Enterprise as a conceptual framework to support real-time autonomous system mission and contingency management. The algorithm and its software implementation were formulated for generic application to autonomous flight vehicle systems, and its efficacy was demonstrated by simulation within the problem domain of Unmanned Aerial Vehicle autonomous flight management. The approach itself is based upon the precept that autonomous decision making for a very complex system can be made tractable by distillation of the system state to a manageable set of strategic objectives (e.g. maintain power margin, maintain mission timeline, and et cetera), which if attended to, will result in a favorable outcome. From any given starting point, the attainability of the end-states resulting from a set of candidate decisions is assessed by propagating a system model forward in time while qualitatively mapping simulated states into margins on strategic objectives using fuzzy inference systems. The expected return value of each candidate decision is evaluated as the product of the assigned value of the end-state with the assessed attainability of the end-state. The candidate decision yielding the highest expected return value is selected for implementation; thus, the approach provides a software framework for intelligent autonomous risk management. The name adopted for the technique incorporates its essential elements: Strategic Objective Valuation and Attainability (SOVA). Maximum value of the approach is realized for systems where human intervention is unavailable in the timeframe within which critical control decisions must be made. The Far Ultraviolet Spectroscopic Explorer (FUSE) satellite, launched in 1999, has been collecting science data for eight years.[1] At its beginning of life, FUSE had six gyros in two IRUs and four reaction wheels. Over time through various failures, the satellite has been left with one reaction wheel on the vehicle skew axis and two gyros. To remain operational, a control scheme has been implemented using the magnetic torque rods and the remaining momentum wheel.[2] As a consequence, there are attitude regions where there is insufficient torque authority to overcome environmental disturbances (e.g. gravity gradient torques). The situation is further complicated by the fact that these attitude regions shift inertially with time as the spacecraft moves through earth s magnetic field during the course of its orbit. Under these conditions, the burden of planning targets and target-to-target slew maneuvers has increased significantly since the beginning of the mission.[3] Individual targets must be selected so that the magnetic field remains roughly aligned with the skew wheel axis to provide enough control authority to the other two orthogonal axes. If the field moves too far away from the skew axis, the lack of control authority allows environmental torques to pull the satellite away from the target and can potentially cause it to tumble. Slew maneuver planning must factor the stability of targets at the beginning and end, and the torque authority at all points along the slew. Due to the time varying magnetic field geometry relative to any two inertial targets, small modifications in slew maneuver timing can make large differences in the achievability of a maneuver.

Heatwole, Scott↗

Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

Good, Susan M.↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Cassini spacecraft is now in its second Saturn tour extension, the Solstice Mission. By emphasizing propellant preservation over minimizing maneuver cycles, the Cassini Project is meeting the challenge of mission completion in 2017. Since June 2012, 18 of 21 maneuvers were performed to closely maintain the prescribed trajectory, saving downstream propellant. These and other maneuvers during the third year of the Solstice Mission (June 2012 to August 2013) are highlighted in this paper: 31 planned maneuvers targeted to 11 Titan flybys and the last planned Rhea encounter. An assessment of the updated maneuver execution-error models will also be presented.

Cassini↗

LANDSAT-5 orbit adjust maneuver report

The orbit adjust maneuvers performed to raise the LANDSAT 5 spacecraft to mission altitude, synchronize it with the required groundtrack, and properly phase the spacecraft with LANDSAT-4 to provide an 8 day full Earth coverage cycle are described. Maneuver planning and evaluation procedures, data and analysis results for all maneuvers performed to date, the frozen orbit concept, and the phasing requirement between LANDSAT-4 and LANDSAT-5 are also examined.

Hassett, P. J.↗

An interactive tool for design and support of lunar, gravity assist, and libration point trajectories

The 'Swingby' interactive tool for design, analysis, and support of maneuver planning for missions that involve transfers to the moon, the lunar orbits, multiple-gravity assists, and the libration-point orbits, runs on a PC and uses pull-down and pop-up menus to allow users to change physical constants and select perturbations for inclusion. Swingby can also target by ascertain parameters, or allow the computer to generate goals on the basis of mission requirements. Rapid mission analyses, operational maneuvers, and contingency plans are thereby obtainable.

Carrico, J.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

A geostationary longitude acquisition planning algorithm

The paper is concerned with the phase of the geosynchronous mission termed station acquisition, which involves the maneuvering of a spacecraft to its geostationary longitude by means of the spacecraft propulsion system. An algorithm which assists in maneuver planning is described, and examples of its use are presented. The algorithm can be applied when sequences of more than three maneuvers are to be expected. While, in general, three maneuvers are sufficient to achieve the desired end conditions when orbital mechanics are the only consideration, operational considerations may add constraints resulting in an increased number of maneuvers required.

Petruzzo, C. J.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Human Spaceflight Trajectory Operations: A Case Study from STS-132/ULF4

Prior to the launch of the STS-132/ULF4 mission, the International Space Station (ISS) Flight Control Team was alerted to the approach of a space debris with a predicted time of closest approach approximately 1 hr after Space Shuttle docking. As a result, the ISS team considered performing a collision avoidance maneuver prior to the Space Shuttle s approach. The purpose of this presentation will be to use this case study to illustrate best practices of the human spaceflight trajectory operations team. The presentation will begin with an overview of the roles of the real-time ISS and Space Shuttle trajectory flight control teams. Then, the STS-132/ULF4 case study will be used to illustrate the issues and lessons learned involved in performing Space Shuttle rendezvous maneuver planning and execution. Specific elements of the STS-132 Space Shuttle rendezvous maneuver profile that can be used to provide mission assurance in cases of trajectory uncertainty will be described and discussed. Additionally, this case study will be used to provide context for identifying lessons learned in an operational environment that requires technical and decision-making coordination between two control center teams with two potentially maneuvering space vehicles.

Cutri-Kohart, Rebecca↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗

SCATHA mission termination report

The SCATHA (Spacecraft Charging at High Altitudes) satellite was operated from the Consolidated Space Test Center in Sunnyvale, California from February 1979 to May 1991. It was a spin stabilized vehicle in a highly eccentric orbit that collected data on spacecraft charging. The purpose of such data gathering was to predict and/or model the effects of the Earth's magnetic field on synchronous and near synchronous satellites. During the majority of its lifetime, attitude precession maneuvers were done every 10-15 days to maintain solar panel orientation. Maneuver planning was difficult due to the structural characteristics of SCATHA. It is cylindrically shaped and has seven booms ranging in length from 2 to 50 meters. These precession maneuvers induced predictable nutation that damped out after a few days. Eventually fuel began running low due to these frequent maneuvers. Experiments that had required the spin axis be in the orbit plane had already been turned off or had collected all their data. To increase the vehicle lifetime, the spin axis was moved to ecliptic normal. While this stopped the need for frequent attitude maneuvering (only two per year required now), this movement of the spin axis caused nutation that would not damp out for the remainder of the mission. This phase of the mission, with the ecliptic normal orientation, lasted for approximately three years. Although nutation never damped, data gathering was uninterrupted. In late 1990, when SCATHA's transmitter became seriously degraded, the Air Force decided to turn SCATHA off. This would only be done after the satellite was made 'safe'. The most difficult part of making the vehicle safe was quickly purging the fuel. Several plans were considered. The selected plan was to perform a series of 20 degree attitude precession maneuvers (3 days apart to allow for the worst nutation to damp) until the fuel was depleted. Although this sounded simple, the actual execution proved difficult. This was due to a nearly complete lack of available telemetry data, large undamped motion of the long booms, inadequacies in attitude determination software, and an error in the fuel level calculation software. This paper discusses the various proposed termination plans and execution of the selected one. Attitude determination methodologies, nutation from maneuvers, and effects of the flexible booms on the termination mission are presented and analyzed from a satellite analyst point of view.

Stakkestad, Kjell↗

Cassini Maneuver Experience Through the Last Icy Satellite Targeted Flybys of the Mission

The Cassini spacecraft will reach its spectacular end-of-mission in September 2017, after having spent a successful twenty years in space gathering invaluable scientific data about Saturn, its rings, and moons. Cassini has flown the most complex gravity-assist trajectory ever designed, which requires frequent maneuvering to achieve the desired targets. After so many years in operation the propellant is starting to dwindle, making it of paramount importance that the maneuvers be designed to prioritize preserving propellant. This paper highlights the strategies for 50 planned maneuvers during twelve Titan flybys and the last Dione and Enceladus flybys of the mission.

Hernandez, Sonia↗

Libration Orbit Eclipse Avoidance Maneuver Study for the James Webb Space Telescope Mission

Mission analysis of libration orbit trajectories at Sun-Earth/Moon L2 typically includes predictions of lunar and Earth eclipses during the mission life-time. The NASA James Webb Space Telescope (JWST) trajectory, by design, avoids these eclipses by pruning its launch window. In an off-nominal scenario where an eclipse is predicted, a maneuver strategy is needed. In this paper, trade studies are examined for JWST that characterize the burn magnitude, location, and epochs of multiple maneuver plans to avoid an eclipse. The results enable analysts to explore the space of feasible maneuver strategies during routine operations.

Maneuver design↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021. This paper will provide the original plan, requirements and restriction, and the plan changes that were made to adjust to this condition. The document will also discuss lessons learned.

flight dynamics↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021.

flight dynamics↗