Search NASA⌕ Search

SEARCH · Search NASA

Results for “Marching learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Handling Qualities Flight Testing of the Stratospheric Observatory for Infrared Astronomy (SOFIA)

Airborne infrared astronomy has a long successful history, albeit relatively unknown outside of the astronomy community. A major problem with ground based infrared astronomy is the absorption and scatter of infrared energy by water in the atmosphere. Observing the universe from above 40,000 ft puts the observation platform above 99% of the water vapor in the atmosphere, thereby addressing this problem at a fraction of the cost of space based systems. The Stratospheric Observatory For Infrared Astronomy (SOFIA) aircraft is the most ambitious foray into the field of airborne infrared astronomy in history. Using a 747SP (The Boeing Company, Chicago, Illinois) aircraft modified with a 2.5m telescope located in the aft section of the fuselage, the SOFIA endeavors to provide views of the universe never before possible and at a fraction of the cost of space based systems. The modification to the airplane includes moveable doors and aperture that expose the telescope assembly. The telescope assembly is aimed and stabilized using a multitude of on board systems. This modification has the potential to cause aerodynamic anomalies that could induce undesired forces either at the cavity itself or indirectly due to interference with the empennage, both of which could cause handling qualities issues. As a result, an extensive analysis and flight test program was conducted from December 2009 through March 2011. Several methods, including a Lower Order Equivalent Systems analysis and pilot assessment, were used to ascertain the effects of the modification. The SOFIA modification was found to cause no adverse handling qualities effects and the aircraft was cleared for operational use. This paper discusses the history and modification to the aircraft, development of test procedures and analysis, results of testing and analysis, lessons learned for future projects and justification for operational certification.

Glaser, Scott T.↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Operational Integration Assessment (OIA) of Midterm UAM Operations: Class C Airspace Tabletop Exercise and Integration Checkpoint

The National Aeronautics and Space Administration (NASA), in collaboration with the Federal Aviation Administration (FAA), is conducting research into evolving today’s air traffic management system towards a more automated and operationally flexible airspace to accommodate Urban Air Mobility (UAM) operations at scale. UAM operations, enabled by electric Vertical Takeoff and Landing (eVTOL) aircraft, may change the role of aviation in the movement of people and goods and provide practical, cost-effective air transport in metropolitan areas. FAA UAM Concept of Operations v2.0 describes three evolutionary stages of UAM operations: Initial, Midterm, and Mature State operations. Midterm operations are comprised of many complex changes to the national airspace system (NAS). The Operational Integration Assessment (OIA) was created as a capability to address the need to study the progression and identify interdependencies of those changes that may occur during the midterm UAM operations timeframe. The OIA includes a series of tabletop exercises and integration checkpoints planned to explore various use cases from end-to-end, evaluated by NASA’s Air Traffic Management eXploration (ATM-X) project in partnership with the FAA’s William J. Hughes Technical Center (WJHTC) and industry partners. The use cases were exercised in an immersive, integrated live-virtual-constructive (LVC) airspace simulation environment, called the NASA/FAA Laboratory Integrated Test Environment (NFLITE), as part of an effort to learn how UAM operations can scale beyond the as-is NAS and through the transition to higher-tempo and highly automated operations of the future. This document describes the events of the tabletop exercise held from January 24-26, 2023, at the National Airspace Research & Technology Park (NARTP) in Egg Harbor Township, New Jersey, adjacent to the WJHTC and the subsequent integration checkpoint performed on March 28, 2023,at NASA Langley Research Center (LaRC) in Hampton, Virginia.

UAM↗

Extended Life Testing of Duplex Ball Bearings

Sierra Nevada Corporation’s Space Systems performed bearing life testing for the Scan Mirror Motor/Encoder Assembly (SMMA), part of the Scan Mirror Assembly on-board the Aerosol Polarimetry Sensor (APS) on the NASA Glory Spacecraft. The baseline bearing life test duration extended beyond the launch date for the Glory Spacecraft; a risk that the program was willing to undertake with the understanding that if any anomalies or failures occurred before the required life was achieved, then the mission objectives or operating profile could be modified on orbit to take those results into account. Even though the Glory Spacecraft failed to reach orbit during its launch in March of 2011, the bearing life testing was continued through a mutual understanding of value between Sierra Nevada Corporation and our customer; with a revised goal of testing to failure rather than completing a required number of life cycles. Life testing thus far has not only exceeded the original mission required life, but has also exceeded the published test data for Cumulative Degradation Factor (CDF) from NASA/CR-2009-215681. Many lessons were learned along the way regarding long life testing. The bearing life test has been temporarily suspended due to test support equipment issues.

Mobley, Jeffrey↗

Project S'COOL

The Students Clouds Observations On-Line or S'COOL project was piloted in 1997. It was created with the idea of using students to serve as one component of the validation for the Clouds and the Earth's Radiant Energy System (CERES) instrument which was launched with the Tropical Rainfall Measuring Mission (TRMM) in November, 1997. As part of NASA's Earth Science Enterprise CERES is interested in the role clouds play in regulating our climate. Over thirty schools became involved in the initial thrust of the project. The CERES instrument detects the location of clouds and identifies their physical properties. S'COOL students coordinate their ground truth observations with the exact overpass of the satellite at their location. Their findings regarding cloud type, height, fraction and opacity as well as surface conditions are then reported to the NASA Langley Distributed Active Archive Center (DAAC). The data is then accessible to both the CERES team for validation and to schools for educational application via the Internet. By March of 1998 ninety-three schools, in nine countries had enrolled in the S'COOL project. Joining the United States participants were from schools in Australia, Canada, France, Germany, Norway, Spain, Sweden, and Switzerland. The project is gradually becoming the global project envisioned by the project s creators. As students obtain the requested data useful for the scientists, it was hoped that students with guidance from their instructors would have opportunity and motivation to learn more about clouds and atmospheric science as well.

Green, Carolyn J.↗

Activate/Inhibit KGCS Gateway via Master Console EIC Pad-B Display

My internship consisted of two major projects for the Launch Control System.The purpose of the first project was to implement the Application Control Language (ACL) to Activate Data Acquisition (ADA) and to Inhibit Data Acquisition (IDA) the Kennedy Ground Control Sub-Systems (KGCS) Gateway, to update existing Pad-B End Item Control (EIC) Display to program the ADA and IDA buttons with new ACL, and to test and release the ACL Display.The second project consisted of unit testing all of the Application Services Framework (ASF) by March 21st. The XmlFileReader was unit tested and reached 100 coverage. The XmlFileReader class is used to grab information from XML files and use them to initialize elements in the other framework elements by using the Xerces C++ XML Parser; which is open source commercial off the shelf software. The ScriptThread was also tested. ScriptThread manages the creation and activation of script threads. A large amount of the time was used in initializing the environment and learning how to set up unit tests and getting familiar with the specific segments of the project that were assigned to us.

Computer Programming↗

Fourth NASA Goddard Conference on Mass Storage Systems and Technologies

This report contains copies of all those technical papers received in time for publication just prior to the Fourth Goddard Conference on Mass Storage and Technologies, held March 28-30, 1995, at the University of Maryland, University College Conference Center, in College Park, Maryland. This series of conferences continues to serve as a unique medium for the exchange of information on topics relating to the ingestion and management of substantial amounts of data and the attendant problems involved. This year's discussion topics include new storage technology, stability of recorded media, performance studies, storage system solutions, the National Information infrastructure (Infobahn), the future for storage technology, and lessons learned from various projects. There also will be an update on the IEEE Mass Storage System Reference Model Version 5, on which the final vote was taken in July 1994.

Kobler, Benjamin↗

Aerobracking the ExoMars TGO: the JPL Navigation Experience

In October 2016, ESA’s Trace Gas Orbiter entered into orbit around Mars. The transfer from its initial 24-hour elliptical orbit into the final 2-hour science orbit was helped by means of 952 aerobraking passes between March 2017 and February 2018. For this first aerobraking operation by European Space Operations Centre (ESOC), a dedicated partnership was organized between ESOC and NASA’s Jet Propulsion Laboratory (JPL) to allow for JPL navigation team’s support during the TGO aerobraking operations. The Mission Design and Navigation section at JPL supported the mission by providing consulting in aerobraking navigation operations and independent orbit determination solutions during TGO’s aerobraking. This paper discusses the JPL Navigation team’s experience, challenges faced, and lessons learned during TGO’s aerobraking at Mars. Topics include the collaboration between the two navigation teams, configuration of orbit determination for aero drag passes, arrangement of automated orbit determination, and reporting processes.

Young, Brian↗

Psychological Selection of NASA Astronauts for International Space Station Missions

During the relatively short-duration Space Shuffle missions, a psychological support program for the astronauts has not been required. Such missions primarily require providing occasional communication with family members by means of audio, video or e-mail, and some diversions such as CD players. During the NASA-Mir Program, conducted from March 1995 through June 1998, mission duration increased to 4-6 months. As a result of these changes it was necessary for NASA to establish an operational Human Behavior and Performance Group (HBPG) to develop and implement a comprehensive program of psychological support. The Mir experience provided the opportunity to develop and implement a psychological support program for long-duration space missions. Many factors influence the support program, including individual preferences, mission duration, and environmental factors such as habitable and personal areas. Lessons learned from the Mir experience are being applied to improve the ISS psychological support program plan. This presentation will address which includes various preflight, in-flight, and post-flight support activities and tools that NASA's HBPG will provide to astronauts and their families for ISS missions.

VanderArk, Steve↗

Recent Developments to the Porous Microstructure Analysis (PuMA) Software

Introduction The Porous Microstructure Analysis (PuMA) software is an open source framework for image-based simulation, primarily used to determine effective properties based on material microstructure. PuMA was originally developed for the study of NASA thermal protection materials; however, many of the solvers in PuMA have applicability to a broad range of materials science applications. PuMA version 3.2 computes material surface area, pore diameters, effective thermal conductivity, continuum and rarefied tortuosity, and permeability. For anisotropic materials, PuMA can estimate material orientation and compute anisotropic thermal conductivity and elasticity. In this talk, a brief overview of the PuMA software and underlying methods will be presented, as well as some recent and ongoing developments, including the use of immersed boundary methods for image-based simulation and the development of a new weave segmentation tool, called TomoSAM. Cut-Cell method for heat and mass transfer For simulations on complex microstructures, traditional unstructured meshing techniques often prove to be difficult and time-intensive. Voxel-based solvers, which represent the surface as a staircase structure, are relatively simple to implement but can lose accuracy when feature resolution is poor. In this work, we present a novel 3D cut-cell method for solving the variable coefficient Poisson equation on complex microstructures, suitable for the determination of effective thermal conductivity or tortuosity of a material. The method uses a Marching Cubes/Marching Squares surface reconstruction to create cut-cells and determine geometric quantities. A flux-correction method is extended to 3D, with least squares gradient reconstruction, to solve for the boundary fluxes in the cut-cells. Verification cases show the solver achieves globally 2nd order accuracy on complex microstructures. TomoSAM TomoSAM, a module of the PuMA software, has been developed as a plugin for 3D Slicer, a software platform used for 3D image processing and visualization. It utilizes the Segment Anything Model (SAM), a deep learning model capable of identifying objects and generating image masks based on minimal user input. This feature enables efficient segmentation of complex 3D datasets, particularly of woven materials, from tomography or similar imaging methods, reducing the need for manual segmentation.

Tomography↗

Recent Developments to the Porous Microstructure Analysis (PuMA) Software

The Porous Microstructure Analysis (PuMA) software is an open source framework for image-based simulation, primarily used to determine effective properties based on material microstructure. PuMA was originally developed for the study of NASA thermal protection materials; however, many of the solvers in PuMA have applicability to a broad range of materials science applications. PuMA version 3.2 computes material surface area, pore diameters, effective thermal conductivity, continuum and rarefied tortuosity, and permeability. For anisotropic materials, PuMA can estimate material orientation and compute anisotropic thermal conductivity and elasticity. In this talk, a brief overview of the PuMA software and underlying methods will be presented, as well as some recent and ongoing developments, including the use of immersed boundary methods for image-based simulation and the development of a new weave segmentation tool, called TomoSAM. Cut-Cell method for heat and mass transfer For simulations on complex microstructures, traditional unstructured meshing techniques often prove to be difficult and time-intensive. Voxel-based solvers, which represent the surface as a staircase structure, are relatively simple to implement but can lose accuracy when feature resolution is poor. In this work, we present a novel 3D cut-cell method for solving the variable coefficient Poisson equation on complex microstructures, suitable for the determination of effective thermal conductivity or tortuosity of a material. The method uses a Marching Cubes/Marching Squares surface reconstruction to create cut-cells and determine geometric quantities. A flux-correction method is extended to 3D, with least squares gradient reconstruction, to solve for the boundary fluxes in the cut-cells. Verification cases show the solver achieves globally 2nd order accuracy on complex microstructures. TomoSAM TomoSAM, a module of the PuMA software, has been developed as a plugin for 3D Slicer, a software platform used for 3D image processing and visualization. It utilizes the Segment Anything Model (SAM), a deep learning model capable of identifying objects and generating image masks based on minimal user input. This feature enables efficient segmentation of complex 3D datasets, particularly of woven materials, from tomography or similar imaging methods, reducing the need for manual segmentation.

Tomography↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

Sauerwein, Timothy A.↗

Shuttle Shortfalls and Lessons Learned for the Sustainment of Human Space Exploration

Much debate and national soul searching has taken place over the value of the Space Shuttle which first flew in 1981 and which is currently scheduled to be retired in 2010. Originally developed post-Saturn Apollo to emphasize affordability and safety, the reusable Space Shuttle instead came to be perceived as economically unsustainable and lacking the technology maturity to assure safe, routine access to low earth orbit (LEO). After the loss of two crews, aboard Challenger and Columbia, followed by the decision to retire the system in 2010, it is critical that this three decades worth of human space flight experience be well understood. Understanding of the past is imperative to further those goals for which the Space Shuttle was a stepping-stone in the advancement of knowledge. There was significant reduction in life cycle costs between the Saturn Apollo and the Space Shuttle. However, the advancement in life cycle cost reduction from Saturn Apollo to the Space Shuttle fell far short of its goal. This paper will explore the reasons for this shortfall. Shortfalls and lessons learned can be categorized as related to design factors, at the architecture, element and sub-system levels, as well as to programmatic factors, in terms of goals, requirements, management and organization. Additionally, no review of the Space Shuttle program and attempt to take away key lessons would be complete without a strategic review. That is, how do national space goals drive future space transportation development strategies? The lessons of the Space Shuttle are invaluable in all respects - technical, as in design, program-wise, as in organizational approach and goal setting, and strategically, within the context of the generational march toward an expanded human presence in space. Beyond lessons though (and the innumerable papers, anecdotes and opinions published on this topic) this paper traces tangible, achievable steps, derived from the Space Shuttle program experience, that must be a part of any 2l century initiatives furthering a growing human presence beyond earth.

Zapata, Edgar↗

X-43A Final Flight Observations

The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

Grindle, Laurie↗

The OSIRIS-Rex Asteroid Sample Return: Mission Operations Design

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.

Sensor On-orbit Calibration and Characterization Using Spacecraft Maneuvers

Spacecraft flight operations often require activities that involve different kinds of maneuvers for orbital adjustments (pitch, yaw, and roll). Different maneuvers, when properly planned and scheduled, can also be applied to support and/or to perform on-board sensor calibration and characterization. This paper uses MODIS (Moderate Resolution Imaging Spectroradiometer) as an example to illustrate applications of spacecraft maneuvers for Earth-observing sensors on-orbit calibration and characterization. MODIS is one of the key instruments for NASA's Earth Observing System (EOS) currently operated on-board the EOS Terra and Aqua spacecraft launched in December 1999 and May 2002, respectively. Since their launch, both Terra and Aqua spacecraft have made a number of maneuvers, specially the yaw and roll maneuvers, to support the MODIS on-orbit calibration and characterization. For both Terra and Aqua MODIS, near-monthly spacecraft roll maneuvers are executed for lunar observations. These maneuvers are carefully scheduled so that the lunar phase angles are nearly identical for each sensor's lunar observations. The lunar observations are used to track MODIS reflective solar bands (RSB) calibration stability and to inter-compare Terra and Aqua MODIS RSB calibration consistency. To date, two sets of yaw maneuvers (each consists of two series of 8 consecutive yaws) by the Terra spacecraft and one set by the Aqua spacecraft have been performed to validate MODIS solar diffuser (SD) bi-directional reflectance factor (BRF) and to derive SD screen transmission. Terra spacecraft pitch maneuvers, first made on March 26, 2003 and the second on April 14, 2003 (with the Moon in the spacecraft nadir view), have been applied to characterize MODIS thermal emissive bands (TEB) response versus scan angle (RVS). This is particularly important since the pre-launch TEB RSV measurements made by the sensor vendor were not successful. Terra MODIS TEB RVS obtained from pitch maneuvers have been used in the current LIB calibration algorithm. Lunq observations from pitch maneuvers also provided information to cross-calibrate MODIS with other sensors (MISR and ASTER) on the same platform. We will provide a summary of MODIS maneuver activities and their applications for MODIS calibration and characterization. The results and lessons learned discussed in this paper from MODIS maneuver activities will provide useful insights into future spacecraft and sensor operation.

Xiong, X.↗

ACTS Operations Extended Through a University-Based Consortium

The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. This was determined to be viable, and in the fall of 2000, NASA announced that it would consider extending operations. On March 19, 2001, NASA, the Ohio Board of Regents, and the Ohio University signed a Space Act Agreement to continue ACTS operations for 2 more years with options to extend operations up to a total of 4 years. To accomplish this, the Ohio University has formed a university-based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), and acts as the managing member. The Ohio University is responsible for the full reimbursement of NASA's operations costs, and does this through consortium membership. NASA retains the operating license of the spacecraft and has two contractors supporting spacecraft and master control station operations. This flexible arrangement between NASA and academia allows the education community to access a large communications satellite for learning about spacecraft operations and to use the system's transponders for communications applications. It also allows other organizations, such as commercial companies, to become consortium members and use the ACTS wideband Ka-band (30/20 GHz) payload. From the consortium members, six areas of interest have been identified.

Bauer, Robert A.↗

Global Impact of COVID-19 Restrictions on the Atmospheric Concentrations of Nitrogen Dioxide and Ozone

Social-distancing to combat the COVID-19 pandemic has led to widespread reductions in air pollutant emissions. Quantifying these changes requires a business-as-usual counterfactual that accounts for the synoptic and seasonal variability of air pollutants. We use a machine learning algorithm driven by information from the NASA GEOS-CF model to assess changes in nitrogen dioxide (NO2) and ozone (O3) at 5,756 observation sites in countries from January through June 2020. Reductions in NO2 coincide with timing and intensity of COVID-19 restrictions, ranging from 60% in severely affected cities (e.g., Wuhan, Milan) to little change (e.g., Rio de Janeiro, Taipei). On average, NO2 concentrations were (13-23) % lower than business as usual from February 2020 onward. China experienced the earliest and steepest decline, but concentrations since April have mostly recovered and remained within 5% to the business-as-usual estimate. NO2 reductions in Europe and the US have been more gradual with a halting recovery starting in late March. We estimate that the global NOx (NO+NO2) emission reduction during the first 6 months of 2020 amounted to 3.1 (2.6-3.6) TgN, equivalent to 5.5(4.7-6.4) % of the annual anthropogenic total. The response of surface O3 is complicated by competing influences of non-linear atmospheric chemistry. While surface O3 increased by up to 50% in some locations, we find the overall net impact on daily average O3 between February -June 2020 to be small. However, our analysis indicates a flattening of the O3 diurnal cycle with an increase in nighttime ozone due to reduced titration and a decrease in daytime ozone, reflecting a reduction in photochemical production.

Christoph A Keller↗