Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Exploration Rover”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Mars Exploration Rovers Entry, Descent, and Landing Trajectory Analysis

The Mars Exploration Rover mission successfully landed two rovers "Spirit" and "Opportunity" on Mars on January 4th and 25th of 2004, respectively. The trajectory analysis performed to define the entry, descent, and landing (EDL) scenario is described. The entry requirements and constraints are presented, as well as uncertainties used in a Monte Carlo dispersion analysis to statistically assess the robustness of the entry design to off-nominal conditions. In the analysis, six-degree-of-freedom and three-degree-of-freedom trajectory results are compared to assess the entry characteristics of the capsule. Comparison of the preentry results to preliminary post-landing reconstruction data shows that all EDL parameters were within the requirements. In addition, the final landing position for both "Spirit" and "Opportunity" were within 15 km of the predicted landing location.

Desai, Prasun N.↗

Mars Exploration Rover Heat Shield Recontact Analysis

The twin Mars Exploration Rover missions landed successfully on Mars surface in January of 2004. Both missions used a parachute system to slow the rover s descent rate from supersonic to subsonic speeds. Shortly after parachute deployment, the heat shield, which protected the rover during the hypersonic entry phase of the mission, was jettisoned using push-off springs. Mission designers were concerned about the heat shield recontacting the lander after separation, so a separation analysis was conducted to quantify risks. This analysis was used to choose a proper heat shield ballast mass to ensure successful separation with low probability of recontact. This paper presents the details of such an analysis, its assumptions, and the results. During both landings, the radar was able to lock on to the heat shield, measuring its distance, as it descended away from the lander. This data is presented and is used to validate the heat shield separation/recontact analysis.

Raiszadeh, Behzad↗

Mars Exploration Rover parachute decelerator system program review

In the Mars Exploration Rover (MER) Mission, NASA returns to the red planet, following the extremely successful Mars Pathfinder in 1997. The mission will send two lander-rovers to the surface of Mars with separate launches in May and June, 2003. This paper describes the Parachute Decelerator System for the entry vehicle.

Mars Exploration Rover MER parachute decelerator s↗

What We Might Know About Gusev Crater if the Mars Exploration Rover Spirit Mission were Coupled with a Mars Sample Return Mission

The science instruments on the Mars Exploration Rover (MER) Spirit have provided an enormous amount of chemical and mineralogical data during more than 1450 sols of exploration at Gusev crater. The Moessbauer (MB) instrument identified 10 Fe-bearing phases at Gusev Crater: olivine, pyroxene, ilmenite, chromite, and magnetite as primary igneous phases and nanophase ferric oxide (npOx), goethite, hematite, a ferric sulfate, and pyrite/marcusite as secondary phases. The Miniature Thermal Emission Spectrometer (Mini-TES) identified some of these Fe-bearing phases (olivine and pyroxene), non- Fe-bearing phases (e.g., feldspar), and an amorphous high-SiO2 phase near Home Plate. Chemical data from the Alpha Particle X-Ray Spectrometer (APXS) provided the framework for rock classification, chemical weathering/alteration, and mineralogical constraints. APXS-based mineralogical constraints include normative calculations (with Fe(3+)/FeT from MB), elemental associations, and stoichiometry (e.g., 90% SiO2 implicates opalline silica). If Spirit had cached a set of representative samples and if those samples were returned to the Earth for laboratory analysis, what value is added by Mars Sample return (MSR) over and above the mineralogical and chemical data provided by MER?

Morris, Richard V.↗

Choosing Mars-Time: Analysis of the Mars Exploration Rover Experience

This paper focuses on the Mars Exploration Rover (MER) mission decision to work on Mars Time and the implications of that decision on the tactical surface operations process as personnel planned activities and created a new command load for work on each Martian sol. The paper also looks at tools that supported the complexities of Mars Time work, and makes some comparisons between Earth and Mars time scheduling.

Bass, Deborah S.↗

Working on Mars: Understanding How Scientists, Engineers and Rovers Interacted Across Space and Time during the Mars Exploration Rover (MER) Mission

This viewgraph presentation summarizes the scheduling and planning difficulties inherent in operating the Mars Exploration Rovers (MER) during the overlapping terrestrial day and Martian sol. The presentation gives special empahsis to communication between the teams controlling the rovers from Earth, and keeping track of time on the two planets.

Wales, Roxana C.↗

Near-surface temperatures at proposed Mars Exploration Rover land sites

Minimum nighttime temperature at the Mars Exploration Rover (MER) landing sites may limit power available for science activities and thus mission lifetime. Here, 1 m air temperature at the end of the nominal 90 sol primary mission are derived for the four primary and three previously considered MER landing sites based on Mars Global Surveyor Thermal Emmision Spectrometer thermal inertia and albedo, estimated opacity, and predictions of air temperature from a one-dimensional atmospheric model.

Mars atmosphere Mars Exploration Rover (MER) surfa↗

Brake Failure from Residual Magnetism in the Mars Exploration Rover Lander Petal Actuator

In January 2004, two Mars Exploration Rover spacecraft arrived at Mars. Each safely delivered an identical rover to the Martian surface in a tetrahedral lander encased in airbags. Upon landing, the airbags deflated and three Lander Petal Actuators opened the three deployable Lander side petals enabling the rover to exit the Lander. Approximately nine weeks prior to the scheduled launch of the first spacecraft, one of these mission-critical Lander Petal Actuators exhibited a brake stuck-open failure during its final flight stow at Kennedy Space Center. Residual magnetism was the definitive conclusion from the failure investigation. Although residual magnetism was recognized as an issue in the design, the lack of an appropriately specified lower bound on brake drop-out voltage inhibited the discovery of this problem earlier in the program. In addition, the brakes had more unit-to-unit variation in drop-out voltage than expected, likely due to a larger than expected variation in the magnetic properties of the 15-5 PH stainless steel brake plates. Failure analysis and subsequent rework of two other Lander Petal Actuators with marginal brakes was completed in three weeks, causing no impact to the launch date.

Jandura, Louise↗

Mars Exploration Rover Opportunity End of Mission Report

The Mars Exploration Rover (MER) Opportunity landed on Meridiani Planum on 25 January 2004 for a prime mission designed to last three months (90 sols). After more than fourteen years operating on the surface of Mars, the last communication from Opportunity occurred on sol 5111 (10 June, 2018) when a major dust storm reduced power on the solar panels to the point where further communications were not possible. Following the cessation of the dust storm several weeks later, the MER project radiated over 1000 commands to Mars in an attempt to elicit a response from the rover. Attempts were made utilizing the Deep Space Network X-Band and UHF relay via both Mars Odyssey and the Mars Reconnaissance Orbiter. Search and recovery efforts concluded on 12 February, 2019. It is the MER project’s assessment that the environmental window in which it would be most probable to recover Opportunity had passed by that time and that the rover would succumb to the extreme environmental conditions experienced during a winter on Mars. This report summarizes the major science accomplishments throughout the fourteen years of this mission, with a detailed focused on recent science accomplishments during the last extended mission (EM-11). This report also describes the mission engineering accomplishments and specific actions taken during the attempt to recover the vehicle after communications were lost during the major dust storm.

Callas, John L.↗

Mars Exploration Rover - a new standard for interplanetary navigation

The twin Mars Exploration Rovers, Spirit and Opportunity, arrived at Mars for landings respectively at Gusev Crater (on January 4, 2004) and Meridiani Planum (on January 25, 2004). During the development of the mission, the capability of the navigation system to deliver the landers within a particular accuracy played a major role in landing site selection. This process ultimately resulted in commitments to deliver each lander within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. Achieving atmospheric entry delivery accuracies consistent with this landing requirement necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, aggressive, mission-critical use of interferometric ADOR tracking data, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. Because these advances pressed the state -of -the art, innovative methods to verify the assumptions in the pre-launch covariance analyses were also developed. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly bettered the requirements.

navigation↗

Mars Exploration Rover thermal test program overview

In January 2004, two Mars Exploration Rovers (MER) landed on the surface of Mars to begin their mission as robotic geologists. A year prior to these historic landings, both rovers and the spacecraft that delivered them to Mars, were completing a series of environmental tests in facilities at the Jet Propulsion Laboratory. This paper describes the test program undertaken to validate the thermal design and verify the workmanship integrity of both rovers and the spacecraft. The spacecraft, which contained the rover within the aeroshell, were tested in a 7.5 m diameter thermal vacuum chamber. Thermal balance was performed for the near earth (hot case) condition and for the near Mars (cold case) condition. A solar simulator was used to provide the solar boundary condition on the solar array. IR lamps were used to simulate the solar heat load on the aeroshell for the off-sun attitudes experienced by the spacecraft during its cruise to Mars. Each rover was tested separately in a 3.0 m diameter thermal vacuum chamber over conditions simulating the warmest and coldest expected Mars diurnal temperature cycles. The environmental tests were conducted in a quiescent nitrogen atmosphere at a pressure of 8 to 10 Torr. In addition to thermal balance testing, the science instruments on board the rovers were tested successfully in the extreme environmental conditions anticipated for the mission. A solar simulator was not used in these tests.

thermal vacuum test↗

Preliminary Assessment of Mars Exploration Rover Landing Site Predictions

Selection of the Mars Exploration Rover (MER) landing sites took place over a three year period in which engineering constraints were identified, 155 possible sites were downselected to the final two, surface environments and safety considerations were developed, and the potential science return at the sites was considered. Landing sites in Gusev crater and Meridiani Planum were selected because they appeared acceptably safe for MER landing and roving and had strong morphologic and mineralogical indicators of liquid water in their past and thus appeared capable of addressing the science objectives of the MER missions, which are to determine the aqueous, climatic, and geologic history of sites on Mars where conditions may have been favorable to the preservation of evidence of possible pre-biotic or biotic processes. Engineering constraints important to the selection included: latitude (10 N-15 S) for maximum solar power; elevation (<-1.3 km) for sufficient atmosphere to slow the lander; low horizontal winds, shear and turbulence in the last few kilometers to minimize horizontal velocity; low 10-m scale slopes to reduce airbag spinup and bounce; moderate rock abundance to reduce abrasion or stroke-out of the airbags; and a radar-reflective, load-bearing and trafficable surface safe for landing and roving that is not dominated by fine-grained dust. In selecting the MER landing sites these engineering constraints were addressed via comprehensive evaluation of surface and atmospheric characteristics from existing remote sensing data and models as well as targeted orbital information acquired from Mars Global Surveyor and Mars Odyssey. This evaluation resulted in a number of predictions of the surface characteristics of the sites, which are tested in this abstract. Relating remote sensing signatures to surface characteristics at landing sites allows these sites to be used as ground truth for the orbital data, is essential for selecting and validating landing sites for future missions, and is required for correctly interpreting the surfaces and materials globally present on Mars.

Golombek, M.↗

Mars Exploration Rover Mission

This viewgraph presentation reviews the Mars Exploration Rover Mission. The design of the Rover along with the Athena science payload is also described. Photographs of the Gusev Crater and Meridiani rocks are also shown.

Cohen, Barbara A.↗

Thermal Design and Flight Experience of the Mars Exploration Rover Spacecraft Computer-Controlled, Propulsion Line Heaters

The viewgraph presentation examines propulsion line heater design and problems in the Mars Rover. Topics include a Mars Exploration Rover (MER) project description and MER spacecraft configuration, mission overview, MER cruise stage hardware, thermal design drivers in the propulsion lines, propulsion line control set points prior to launch, MER A and B flight trajectories, MER A early and mid cruise flight experience, MER A and B mid cruise flight experience, MER B late cruise flight experience, and lessons learned

propulsion lines↗

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗