Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Mars Science Laboratory thermal control architecture

The Mars Science Laboratory (MSL) mission to land a large rover on Mars is being planned for launch in 2009. This paper will describe the basic architecture of the thermal control system, the challenges and the methods used to overcome them by the use of an innovative architecture to maximize the use of heritage from past projects while meeting the requirements for the design.

radioisotope↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, the NASA Mars Architecture Team (MAT) conducted a functional volume assessment of the Transit Habitat (TH). The TH has evolved substantially since that time and the current TH does not share the same internal configuration, but the insights gained from the assessment remain relevant. In virtually all architectures involving chemical, electric, or nuclear propulsion, the majority of the crew mission is spent aboard the TH. The Earth to Mars transit durations may vary from architecture to architecture, but all are on the order of hundreds of days, regardless of whether an opposition or conjunction class trajectory is selected, and regardless of whether the propulsion system is chemical, electric, or nuclear. Thus, the TH must provide capabilities appropriate to a very long duration. So, despite significant changes in the current Mars architecture over the past few years, this evaluation still provides useful recommendations in the form of habitability guidance that can be applied to current and future TH concepts. This assessment had six primary objectives: provide a sanity check to the BOC-derived TH layout; understand if we can fit the hardware and functional tasks in the volume; provide a high-level assessment of how aggressive the layout is; generate a list of challenges or assumptions necessary to make it work; generate a list of future work to refine understanding; and identify proposed requirements. All of this information is critical to drive habitat sizing studies and key architecture decisions. It was clear that a human-in-the-loop (HITL) evaluation of some kind would be necessary, but several challenges were immediately identified. The most information could be gleaned from a Desert Research and Technology Studies (DRATS) type of mission operations test (MOT), but the TH concept was too low fidelity to construct the type of prototype necessary to conduct a MOT, nor were their financial resources to do so. The next best option – and really the one most appropriate for the BOC’s stage of maturity – is a Virtual Reality (VR) walk-through evaluation. However, NASA was in a shutdown state due to the COVID-19 pandemic and the VR labs were inaccessible. As a result, a tabletop evaluation was created, using .jpg imagery from the ECM CAD model along with Excel-based datasheets. High-level crew living and working functions within the habitat were identified for evaluation. Questionnaires using Likert scales assessed acceptability of habitat functions and sim quality – the degree to which the function was represented in CAD. This enabled the evaluation to be conducted by personnel working remotely. Each function was evaluated individually along with several overarching habitability parameters and vehicle subsystems. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be related are also described. Final conclusions are described, including challenges or assumptions needed to make the TH design acceptable, future work needed to refine understanding of the TH, and proposed habitat requirements based on test data.

Transit Habitat↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, the NASA Mars Architecture Team (MAT) assessed the Enhanced Habitation Capability (EHC), the transit spacecraft that was part of what was then the current Mars human exploration architecture, the Basis of Comparison (BOC). This assessment had six primary objectives: provide a sanity check to the BOC-derived EHC layout; understand if we can fit the hardware and functional tasks in the volume; provide a high-level assessment of how aggressive the layout is; generate a list of challenges or assumptions necessary to make it work; generate a list of future work to refine understanding; and identify proposed requirements. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be evaluated are also described. Final conclusions are described, including challenges or assumptions needed to make the EHC design acceptable, future work needed to refine understanding of the EHC, and proposed habitat requirements based on test data. While NASA has since moved away from the BOC architecture, this assessment is still useful to inform the design of future Transit Habitats.

Mars Transit Habitat↗

Design of a Family of Mars Chemical Transportation Elements

NASA’s Mars Architecture Team (MAT) has recently developed a collection of concepts to assess the capabilities and constraints presented by architectures incorporating large-scale Mars In-Situ Resource Utilization (ISRU) propellant production. The focus of this manuscript is on the concept design of chemical propellant-based transportation systems including a dual role lander/ascent vehicle and an in-space transporter. Mission performance analyses performed during a recent design analysis cycle derived the 300,000 kg propellant production capacity utilized for preliminary concept designs of enabling surface ISRU systems, power systems, fluid handling systems, and their concept of operation, detailed in companion papers.

Mars↗

Design of a Family of Mars Chemical Transportation Elements

NASA’s Mars Architecture Team (MAT) has recently developed a collection of concepts to assess the capabilities and constraints presented by architectures incorporating large-scale Mars In-Situ Resource Utilization (ISRU) propellant production. The focus of this manuscript is on the concept design of chemical propellant-based transportation systems including a dual role lander/ascent vehicle and an in-space transporter. Mission performance analyses performed during a recent design analysis cycle derived the 300,000 kg propellant production capacity utilized for preliminary concept designs of enabling surface ISRU systems, power systems, fluid handling systems, and their concept of operation, detailed in companion papers.

Mars↗

The Nation's Vision for Exploration: An Update

I.Current key activities: a) Constellation Level2-System Engineering. b) Lunar Architecture Team (LAT)2-technology assessment and architectural option for the lander. c) Mars Architecture Team-system engineering support, Science integration, precursor program planning. d) Lunar Lander Project Core Team-GN&C and Flight system engineering. e) Technology program-supporting multiple projects in robotics, power systems, aero entry technology. f) Mission Operation Project-Mission operations system engineering. g) Advanced Environmental Monitoring Instruments. H. Lunar Reconnaissance Orbiter instrument (Diviner). II. Mission Proposals a) Lunar Sample return. b) Lunar Gravity field mapper.

space exploration↗

Summary of Martian Dust Filtering Challenges and Current Filter Development

Traditional air particulate filtering in manned spaceflight (Apollo, Shuttle, ISS, etc.) has used cleanable or replaceable catch filters such as screens and High-Efficiency Particulate Arrestance (HEPA) filters. However, the human mission to Mars architecture will require a new approach. It is Martian dust that is the particulate of concern but the need also applies to particulates generated by crew. The Mars Exploration Program Analysis Group (MEPAG) high-lighted this concern in its Mars Science, Goals, Objectives, Investigations and Priorities document [7], by saying specifically that one high priority investigation will be to "Test ISRU atmospheric processing systems to measure resilience with respect to dust and other environmental challenge performance parameters that are critical to the design of a full-scale system." By stating this as high priority the MEPAG is acknowledging that developing and adequately verifying this capability is critical to success of a human mission to Mars. This architecture will require filtering capabilities that are highly reliable, will not restrict the flow path with clogging, and require little to no maintenance. This paper will summarize why this is the case, the general requirements for developing the technology, and the status of the progress made in this area.

O'Hara, William J., IV↗

Human Exploration of Mars Design Reference Architecture 5.0

This paper provides a summary of the Mars Design Reference Architecture 5.0 (DRA 5.0), which is the latest in a series of NASA Mars reference missions. It provides a vision of one potential approach to human Mars exploration. The reference architecture provides a common framework for future planning of systems concepts, technology development, and operational testing as well as Mars robotic missions, research that is conducted on the International Space Station, and future lunar exploration missions. This summary the Mars DRA 5.0 provides an overview of the overall mission approach, surface strategy and exploration goals, as well as the key systems and challenges for the first three human missions to Mars.

Mars exploration↗

Decision Space Modeling: Trade Space Ontology

As the National Aeronautics and Space Administration (NASA) works to develop a crewed Moon to Mars Architecture, it is dealing with a large decision space consisting of the overlay of human exploration architectures for both the Moon and for Mars. Efforts are underway to enable reasoning, analysis, and deliberation on this decision space. A critical first step is to develop a model of the decision space, which will then allow for various methods and techniques to be applied in support of the larger architecture decision-making process. The Trade Space Ontology consists of a set of terminologies and relations (an ontology) and a MagicDraw resource that enables documentation of decisions and alternatives. It also provides a means by which decisions and alternatives can be traced to other Systems Engineering artifacts. For documenting alternatives, the Trade Space Ontology adapts the Morphological Matrix methodology to The Systems Modeling Language (SysML) through a profile; custom diagrams are also implemented to simplify the profile's use. With the profile and custom diagrams, system architects can specify options for architecture attributes, as well as compatibility between them, in a compact visual format. While the approach shares similarities to a trade tree, the emphasis at this stage is less on enumerating specific combinations of options and instead on specifying the options and their compatibility. Enumeration of alternatives is performed by an external analysis that operates on an output file from a model constructed using the Trade Space Ontology. For decisions, the Trade Space Ontology provides a way to model generic precedence relationships as well as documenting inputs and outputs. These may include what alternatives, criteria, and rationale are understood to be relevant for each decision. Importantly, the decision-making side of the Trade Space Ontology is defined at a more general level, such that it can be adapted to the specific terms in use by projects and programs at NASA. However, this adaptability also means that less capability is provided ``out-of-the-box'' from installation. Currently the resource includes plugin functionality to enumerate paths through generic precedence relationships between decisions and to export these paths to a spreadsheet. Custom dependency stereotypes are included in the profile to indicate the cross-cutting relationships between the trade space and the architecture decisions, providing a means to map which parts of the trade space enumerate alternatives for a decision, and to identify how the output of a decision may modify the trade space through pruning or down-selection. While the motivating use case for this resource is in human exploration architectures, the broad applicability of the Morphological Matrix methodology indicates that the Trade Space Ontology should also be useful for other activities and tasks at the agency.

Trade Tree↗

Direct Energy Conversion for Low Specific Mass In-Space Power and Propulsion

"Changing the game" in space exploration involves changing the paradigm for the human exploration of the Solar System, e.g, changing the human exploration of Mars from a three-year epic event to an annual expedition. For the purposes of this assessment an "annual expedition" capability is defined as an in-space power & propulsion system which, with launch mass limits as defined in NASA s Mars Architecture 5.0, enables sending a crew to Mars and returning them after a 30-day surface stay within one year, irrespective of planetary alignment. In this work the authors intend to show that obtaining this capability requires the development of an in-space power & propulsion system with an end-to-end specific mass considerably less than 3 kg/kWe. A first order energy balance analysis reveals that the technologies required to create a system with this specific mass include direct energy conversion and nuclear sources that release energy in the form of charged particle beams. This paper lays out this first order approximation and details these conclusions.

Scott, John H.↗

An Integrated Hybrid Transportation Architecture for Human Mars Expeditions

NASA's Human Spaceflight Architecture Team is developing a reusable hybrid transportation architecture that uses both chemical and electric propulsion systems on the same vehicle to send crew and cargo to Mars destinations such as Phobos, Deimos, the surface of Mars, and other orbits around Mars. By applying chemical and electrical propulsion where each is most effective, the hybrid architecture enables a series of Mars trajectories that are more fuel-efficient than an all chemical architecture without significant increases in flight times. This paper presents an integrated Hybrid in-space transportation architecture for piloted missions and delivery of cargo. A concept for a Mars campaign including orbital and Mars surface missions is described in detail including a system concept of operations and conceptual design. Specific constraints, margin, and pinch points are identified for the architecture and opportunities for critical path commercial and international collaboration are discussed.

Merrill, Raymond G.↗

Mars Design Reference Architecture 5.0 Study: Executive Summary

The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

Drake, Bret G.↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

Mission Design Considerations for Mars Cargo of the Human Spaceflight Architecture Team's Evolvable Mars Campaign

Recent NASA interest in human missions to Mars has led to an Evolvable Mars Campaign by the agency's Human Architecture Team. Delivering the crew return propulsion stages and Mars surface landers, SEP based systems are employed because of their high specific impulse characteristics enabling missions requiring less propellant although with longer transfer times. The Earth departure trajectories start from an SLS launch vehicle delivery orbit and are spiral shaped because of the low SEP thrust. Previous studies have led to interest in assessing the divide in trip time between the Earth departure and interplanetary legs of the mission for a representative SEP cargo vehicle.

mars missions↗

A Rigid Mid-Lift-to-Drag Ratio Approach to Human Mars Entry, Descent, and Landing

Current NASA Human Mars architectures require delivery of approximately 20 metric tons of cargo to the surface in a single landing. A proposed vehicle type for performing the entry, descent, and landing at Mars associated with this architecture is a rigid, enclosed, elongated lifting body shape that provides a higher lift-to-drag ratio (L/D) than a typical entry capsule, but lower than a typical winged entry vehicle (such as the Space Shuttle Orbiter). A rigid Mid-L/D shape has advantages for large mass Mars EDL, including loads management, range capability during entry, and human spaceflight heritage. Previous large mass Mars studies have focused more on symmetric and/or circular cross-section Mid-L/D shapes such as the ellipsled. More recent work has shown performance advantages for non-circular cross section shapes. This paper will describe efforts to design a rigid Mid-L/D entry vehicle for Mars which shows mass and performance improvements over previous Mid-L/D studies. The proposed concept, work to date and evolution, forward path, and suggested future strategy are described.

Cerimele, Christopher J.↗