Crop Environment for the Resupply and Extension of Space missions (CERES)
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
An extensive trade study was conducted to evaluate primary mirror substrate design architectures for the HabEx mission baseline 4-meter off-axis telescope. The study’s purpose is not to produce a final design, but rather to established a design methodology for matching the mirror’s properties (mass and stiffness) with the mission’s optical performance specifications (static dynamic wavefront error, WFE). The study systematically compares the effect of proven design elements (closed-back vs. open-back vs. partial-back; meniscus vs. flat back vs. shaped back; etc.), which can be implemented with proven space mirror materials (ULE and Zerodur), on static and dynamic WFE. Additionally, the study compares static and dynamic WFE of each substrate point design integrated onto three and six point mounts.
Future activities of NASA will include the long-term (10 - 30 years) operation of space vehicles. For this reason, there will be an urgent need to provide the basic technology for space vehicle thermal control surfaces and their functional maintenance for future long-term missions. One of the problems arising in connection with such missions is related to contamination which can degrade operational design parameters of critical and thermal control surfaces. All Space Based Payloads will arrive on orbit with a certain level of contamination from ground handling, and, on orbit, will be subjected to some level of contamination over their mission life. For the extension of mission life, it appears practical to institute surface refurbishment procedures for contaminated and degraded surfaces. Potential resurfacing methods are evaluated, taking into account three potential processes. The most promising of these is a cleaning procedure based on the utilization of atomic oxygen.
The Boeing Company under the teaming agreement with the Northrop Grumman Systems Corporation and in compliance with the NASA Phase 1 contract, had the responsibilities for the CEV architecture development of the Environmental control and life support (ECLS) system under the NASA Phase 1 contract. The ECLS system was comprised of the various subsystems which provided for a shirt-sleeve habitable environment for crew to live and work in the crew module of the CEV. This architecture met the NASA requirements to ferry cargo and crew to ISS, and Lunar sortie missions, with extensibility to long duration missions to Moon and MARS. This paper provides a summary overview of the CEV ECLS subsystems which was proposed in compliance with the contract activities.
The extensive use of zeolites and their impact on the world's economy leads to many efforts to characterize their structure, and to improve the knowledge base for nucleation and growth of these crystals. The Zeolite Crystal Growth (ZCG) experiment on USML-2 aims to enhance the understanding of nucleation and growth of zeolite crystals while attempting to provide a means of controlling the defect concentration in microgravity. Zeolites A, X, Beta, and Silicalite were grown during the 16-day USML-2 mission. The solutions where the nucleation event was controlled yielded larger and more uniform crystals of better morphology and purity than their terrestrial/control counterparts. Space-grown Beta crystals were free of line defects while terrestrial/controls had substantial defects.
Extensive ground and air data were collected on 3 May 1979. These data are being processed. We are awaiting quick look imagery for this date. If spacecraft data looks good, we will order CCT's and proceed with the analysis. There are no author-identified significant results in this report.
Previous investigations have extensively explored crew missions to and from Mars, with a prevailing approach termed the 'conjunction' class, necessitating an approximately 500-day stay at Mars for a cost-effective return. However, this configuration results in a mission duration exceeding 1000 days (roughly 3 years). In order to reduce crew health and surface operations risks, a shortened mission duration of 850 days is being explored by using a short ~30 day Mars surface stay and a ‘opposition’ class approach. A non-nuclear approach is possible by combining solar electric propulsion and a chemical stage. While past mission concepts for the conjunction missions also used solar electric propulsion they limited the SEP power to <700 kW. In order to achieve the 850 day round trip more SEP power is needed. A 1MW class SEP-Chem vehicle was found sufficient to perform the 850 day mission. The biggest challenge for the design will be the large, high power solar arrays, mainly from their deployment and stability. This work describes the design of the SEP-Chem vehicle, assembled in a Near Rectilinear Halo Orbit (NRHO) and employing super-heavy class and the Space Launch System (SLS) launchers.
Gemini and Apollo Earth Orbital flights as precursors to Apollo extension and ORL Earth Orbital missions
A one year follow-on to the Galileo Europa Mission (GEM) has been proposed. This extension to GEM begins in October 1999 and consists of six encounters, the first two overlapping with the last two encounters in GEM.
This paper presents several concepts of chemical-propulsion Space Vehicles (SVs) for manned Mars landing missions. For vehicle sizing purposes, several specific missions were chosen from opportunities in the late 1990's and early 2000's, and a vehicle "system" concept is then described which is applicable to the full range of missions and opportunities available. In general, missions utilizing planetary opposition alignments can he done with smaller vehicles than those utilizing planetary opposition alignments (reference I) The conjunction missions have a total mission time of about 3 years, including a required stay-time of about 60 days. Both types of missions might be desirable during a Mars program, the opposition type for early low-risk missions and/or for later unmanned cargo missions, and the conjunction type for more extensive science/exploration missions and/or for Mars base activities. Since the opposition missions appeared to drive the SV size more severely, there were probably more cases examined for them. Some of the concepts presented utilize all-propulsive braking, some utilize an all aerobraking approach, and some are hybrids. Weight statements are provided for various cases. The aerobraking cases have significant advantages in size and weight. Cryogenic propellants were used for the main propulsive elements in all cases, due to their significant weight advantage over storable propellants (reference 1). Extensive use is made of existing propulsive elements and other systems. Most of the work was done on O-g vehicle concepts, but partial-g and 1-g concepts are also provided and discussed. A recommendation is added that efforts be made to find ways to offset the long-term O-g effects on the crew, other than providing a g-field for the total SV or spacecraft, since this causes significant design and operations impacts. Several options for habitable elements are shown, such as large-diameter modules and Space Station (SS) types of modules. The latter were used as a reference because of their cost advantage as existing elements Several options are shown for the Mars landing vehicle, and a landing "system" is recommended which makes use of a large aeroshell to allow landing of payloads of various sizes and shapes over the course of a multi-year program. Because of the large size and weight of the SV it will be necessary to launch individual elements and assemble them in low Earth orbit (LEO). A configuration of one potential assembly concept is provided.
The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.
Steering system and control circuit for Lunar Surface Vehicle /LSV/ - Apollo project
This paper will describe the benefits of execution of the Asteroid Redirect Mission as an early mission in deep space, demonstrating solar electric propulsion, deep space robotics, ground and on-board navigation, docking, and EVA. The paper will also discuss how staging in trans-lunar space and the elements associated with this mission are excellent building blocks for subsequent deep space missions to Mars or other destinations.
No abstract available
Lunar dust is an abrasive regolith that can cause critical damage to hardware and crew. Its morphology and chemical makeup differs from typical earth dust due to space weathering effects. Current space missions require extensive air filtration of lunar dust to ensure mission success; as such filtration testing is paramount in verifying the dust-removal capabilities of the system. Previous testing at NASA GRC consisted of two stages: testing a flat high efficiency particulate air (HEPA) media sheet at various pressure ranges (Stage 1) and testing a pleated HEPA filter at different humidity and dust levels (Stage 2). This testing was done to buy-down risk when testing the flight-qualification HEPA filter for the proposed Stage 3 test. Stage 3 testing used a flight-ready HEPA filter to measure its performance characteristics to verify programmatic requirements. This included measuring lunar dust loading versus pressure drop performance and establishing a maximum capacity based on the allowable pressure drop, determining the HEPA filter efficiency utilizing two separate methodologies, and assessing if the lunar dust caused the HEPA filter to experience any damage. Additionally, dust removal from the HEPA filter was performed using a vacuum to ascertain if the filter life can be prolonged. These test results will aid the program in verifying programmatic requirements and ensuring risk buydown before this HEPA filter takes flight.
Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.
Many Spacelab payloads could significantly benefit from an extension of the duration of sortie missions beyond the nominal seven days. However, longer sortie missions require the addition of Shuttle or Spacelab mission extension kits, which results in a significant reduction in allowable scientific payload weight. An analysis of extended-duration sortie missions was performed. Payload requirements and detailed descriptions of Shuttle and Spacelab baselines were the primary inputs to the analysis. Payload benefits from extended-duration missions were established by surveying payload requirements and interviewing discipline specialists. The net weight available to Spacelab payloads as a function of mission length was derived. The impacts on Shuttle and Spacelab to provide extended-duration mission support and the corresponding impacts on payloads were established. Several alternatives to baseline systems and operations were studied as possibilities to increase available payload weight.
Human exploration of the solar system will include missions lasting years at a time. Such missions mandate extensive regeneration of life support consumables with efficient utilization of local planetary resources. As missions durations extend beyond one or two years, regenerable human life support systems which supply food and recycle air, water, and wastes become feasible; resupply of large volumes and masses of food, water, and atmospheric gases become unrealistic. Additionally, reduced dependency on resupply or self sufficiency can be an added benefit to human crews in hostile environments far from the security of Earth. Comparisons of resupply and regeneration will be discussed along with possible scenarios for developing and implementing human life support systems on the Moon and Mars.