Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The INTEGRAL Mission: Status and Science

Since its launch on October 17, 2002, the INTErnational Gamma-Ray Astrophysics Laboratory (INTEGRAL) mission has been producing exciting scientific results. I will present a brief overview of the INTEGRAL mission including its complement of scientific instruments and its current operational status. This will set the stage for the scientific talks that follow. I will then discuss opportunities for US investigator participation including the NASA INTEGRAL Guest Investigator Program and support services available through the US INTEGRAL Guest Observer Facility.

Sturner, Steven J.↗

EOS Terra Mission Status Constellation MOWG

These presentation slides present the current status of the Terra spacecraft and the future maneuver plans for the rest of Terra's mission life.

Terra Spacecraft Status and Furture Plans↗

Gravity Recovery and Interior Laboratory (GRAIL) Mission: Status at the Initiation of the Science Mapping Phase

The Gravity Recovery And Interior Laboratory (GRAIL) mission, a component of NASA's Discovery Program, launched successfully from Cape Canaveral Air Force Station on September 10, 2011. The dual spacecraft traversed independent, low-energy trajectories to the Moon via the EL-1 Lagrange point and inserted into elliptical, 11.5-hour polar orbits around the Moon on December 31, 2011, and January 1, 2012. The spacecraft are currently executing a series of maneuvers to circularize their orbits at 55-km mean altitude. Once the mapping orbit is achieved, the spacecraft will undergo additional maneuvers to align them into mapping configuration. The mission is on track to initiate the Science Phase on March 8, 2012.

Zuber, Maria T.↗

SMAP MISSION STATUS AND PLAN

The National Aeronautics Space Administration’s (NASA’s) Soil Moisture Active Passive (SMAP) mission will be completing its first extension phase in August 2020. The uncertainty of SMAP soil moisture products is ≤ 0.04 m3/m3. During the first extension phase, SMAP data have been used to advance our understanding of water, energy and carbon cycles. Significant progress has also been made to transition the use of SMAP data to operational communities. In particular, the United States Air Force (USAF) and United States Department of Agriculture (USDA)Foreign Agriculture Service (FAS) have included SMAP data in their operational forecast systems. The SMAP project has been performing a recalibration of radiometer data using four years of cold sky maneuver data. The recalibrated data and updated soil moisture and freeze/thaw products will be presented during the meeting. The SMAP project is preparing an extension proposal to continue the data acquisition and processing activities for another three years (2021-2023) and also identifying additional activities for 2024-2026. We will describe the activities for the second extension phase, including plans for SMAPVEX20 and ’22 field campaigns.

Simon H. Yueh↗

ICESat-2 Mission: Status, Outlook, and Contributions to Polar Science

The Ice, Cloud and land Elevation Satellite-2 (ICESat-2) mission carries the Advanced Topographic Laser Altimeter System (ATLAS) lidar to measure the changing height of Earth surface. After more than 3 years of science data collection, ATLAS has emitted well over a trillion laser pulses and continues to operate nominally. The ICESat-2 data products were initially released in May 2019, and have been used in over 150 peer-reviewed publications to date. Recent community white papers have noted the importance of ice elevation measurements for the coming decades, and as CryoSat-2 has entered it’s second decade and future missions are uncertain, ICESat-2 will be a critical part of the Earth System Observatory for the 2020s. In the polar regions, ICESat-2 has enabled year-round sea ice freeboard measurements as well as ice sheet elevation changes on seasonal, annual, and decadal time scales when combined with other missions. These data enable measurement of change at fine spatial and temporal scales to help understand or characterize the processes driving these observations. As of this presentation, Release 005 is the current version of the along-track data products, including surface-specific products for sea ice, land ice, ground and canopy height, ocean, and inland water heights. In addition, first versions of gridded data products for land ice, sea ice, and ocean are all available. Data spans the start of the mission (14 October 2018) through early 2022. The ICESat-2 project has also begun to produce and distribute QuickLook products with a nominal 3-day latency (as opposed to the ~45-day latency of the final data products). Initial versions of these QuickLook products have elevation accuracy of ~3 meters, and geolocation accuracy of ~50 meters. All products are available through the National Snow and Ice Data Center (nsidc.org). This presentation will summarize the current state and health of the observatory, current state of the ICESat-2 data products, data product quality assessment, and outlook for the future.

ICESat-2↗

TSIS-2 Mission Status

The Total and Spectral Solar Irradiance Sensor – 2 (TSIS-2) is a Class D free-flyer mission under development by NASA to provide continuity with TSIS-1 in the measurement of total and spectral solar irradiance, with a planned launch in 2025. Two instruments—the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM)—are provided by the Laboratory for Atmospheric and Space Physics (LASP) of the University of Colorado. The spacecraft is provided by General Atomics (GA) of Centennial, CO. LASP and GA both provide elements of the ground system. Launch will be on a Falcon9 rocket provided by SpaceX. The status of the project development is described, including some challenges that the team has faced in reaching this point.

TSIS-2↗

EOS Terra: Mission Status Constellation MOWG

General information regarding the current health and status of the EOS (Earth Observing System) Terra Spacecraft. Updates to activities accomplished since the last MOWG (Mission Operations Working Group) and future maneuver plans are included as well.

Terra Spacecraft Status↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is shown during this 9th day of the Space Shuttle Mission to the International Space Station. Paul Hill talks about the status of the transfers of critical items to the International Space Station and transfers back from the International Space Station into the Multi-Purpose Logistics Module (MPLM). Hill also presents footage of the crew cabin blanket survey procedure. Mark Ferring talks in detail about the primary International Space Station task on the External Stowage Platform (ESP). The status of the external stowage platform installation, removal of grapple fixture, gap filler removal task, and Materials International Space Station Experiment (MISSE) 5 payload installation is discussed by Cindy Begley. She also presents footage of Steve Robinson's spacewalk before the gap filler task and during the removal of the gap filler. The Capture of ESP-2 is also presented. The presentation ends with a question and answer period from the news media

Source record↗

First Spacelab mission status and lessons learned

There are 38 experiments and/or facilities currently under development, or undergoing testing, which will be incorporated into Spacelab for its first mission. These experiments cover a range of scientific disciplines which includes atmospheric research, life sciences, space plasma research, materials science, and space industrialization technology. In addition to the full development of individual experiments, the final design of the integrated payload and the development of all requisite integration hardware have been accomplished. Attention is given to the project management lessons learned during payload integration development.

Craft, H. G., Jr.↗

SMAP Mission Status, New Products, and Extended-Phase Goals

NASA's Soil Moisture Active Passive (SMAP) Project now has completed its prime-phase (three years) mission and has entered a new five-year extended phase. The global L-band radiometry from SMAP has enabled diverse scientific investigations in water, energy and carbon cycle research, terrestrial ecology and ocean science. These include eliciting the role of soil moisture control on the evaporation regime and vegetation gross primary productivity, observing soil-vegetation continuum water relations, analysis of flood and droughts, climate modeling and weather prediction, detecting ocean high-winds during tropical storms, and observing fresh-water outflow in coastal oceans. This paper highlights the recent enhancements to the SMAP suite of science products (from instrument level-1 to geophysical retrievals level-2 and level-3).

NASA Soil Moisture Active Passive (SMAP)↗

NASA-ISRO SAR (NISAR) Mission Status

The National Aeronautics and Space Administration (NASA) in the United States and the Indian Space Research Organisation (ISRO) are developing the NASA-ISRO Synthetic Aperture Radar (NISAR) mission, now planned for launch toward the end of 2022. The mission will exploit synthetic aperture radar to map Earth’s surface every 12 days, persistently on ascending and descending portions of the orbit, over all land and ice-covered surfaces. The mission’s primary objectives will be to study Earth land and ice deformation, and ecosystems, in areas of common interest to the US and Indian science communities. This single observatory solution with an L-band (24 cm wavelength) and S-band (10 cm wavelength) radar has a swath of over 240 km at fine resolution, using full polarimetry where needed. To achieve these unprecedented capabilities, both radars use a reflector-feed system, whereby the feed aperture elements are individually sampled to allow a scan-on-receive (“SweepSAR”) capability at both L-band and S-band. The L-band and S-band electronics and feed apertures, provided by NASA and ISRO respectively, share a common 12-m diameter deployable reflector/boom system, provided by NASA. These two radars, which can operate simultaneously, even with FPGA-based on-board digital beamforming and filtering to reduce data rates, produce prodigious amounts of data. Given the high data rates and ambitious coverage requirements, new technologies for high-rate Ka-band downlink complement these first-of-a-kind radar systems.

Kumar, Raj↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director; Mark Ferring, Lead ISS Flight Director; Cindy Begley, STS-114 Lead EVA Officer were present. Paul reported on the general accomplishments of the mission for the day: the transfer to two stations are complete, transfers back from station into logistics module into the mid-deck are about 75 % complete and definitely in schedule to finish the next day, everything with the external video cam and the RGMC return are complete. He noted that all crews are doing great by all means. Paul also gave a detailed explanation with supporting video clips regarding concern for Eileen's side of window. Mark and Cindy both gave technical details on Mission Specialists Steven Robinson and Souichi Noguchi's extravehicular activities (EVA). News media focused most of their questions on extravehicular activities.

Source record↗

The James Webb Space Telescope: Science and Mission Status

The James Webb Space Telescope (JWST) is a large aperture, cryogenic, infrared-optimized space observatory under construction by NASA for launch later this decade. The European and Canadian Space Agencies are mission partners. JWST will find and study the first galaxies that formed in the early universe and peer through dusty clouds to see star and planet formation at high spatial resolution. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, including the Galactic Center, nearby galaxies, and the early universe. JWST will have a segmented primary mirror, approximately 6.5 meters in diameter, and will be diffraction-limited at 2 microns. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The observatory is designed for a 5- year prime science mission, with consumables for 10 years of science operations.

Sonneborn, George↗

STS-114: Discovery Day 8 Mission Status Briefing

Paul Hill, STS 114 Lead Shuttle Flight Director, David Wolf, Extravehicular Activity (EVA) Branch Chief, JSC from the Astronaut Office, and Kelly Beck, STS-114 Team 4 Flight Director are seen on the 8th day of the Space Shuttle Discovery Mission. Paul Hill presents and explains charts of the Gap Fillers that Steve Robinson will be pulling off during his EVA. The charts include: 1) Protruding Gap Fillers; 2) Starboard Worksite Access; 3) Protruding Chine Gap Filler; 4) Port Gap Filler Space Shuttle Remote Manipulator System (SSRMS) Position; and 5) Port Gap Filler Close-up View. Kelly Beck talks about how the plan for the gap fillers were arranged, and presents the tools and techniques that Steve Robinson will be using during the EVA. David Wolf demonstrates how the EVA will be performed using forceps and a hacksaw to remove the gap fillers. The presentation ends with a question and answer period from the news media.

Source record↗