Search for long-lived stopped R-hadrons decaying out of time with pp collisions using the ATLAS detector
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
ME1/1 is a part of the endcap muon system of the CMS detector at the LHC (CERN). It plays the key role in the muon detection providing muon track matching with the CMS inner tracker. ME1/1 should provide high spatial and time resolution. The station is composed of 72 6-layer cathode strip chambers. The chambers were designed and produced at JINR (Dubna). ME1/1 is the innermost muon detector and operates in the strong axial magnetic field (B = 3 T) in the presence of high background of secondary particles. The paper presents the chamber design features and the ME1/1 station characteristics in the CMS runs with proton-proton collisions.
Searches for long-lived particles (LLPs) at the CMS experiment often involve unconventional event topologies that are difficult to efficiently select using standard trigger strategies. To improve sensitivity to such signatures during LHC Run 3 operation, a dedicated High Multiplicity Trigger (HMT) has been developed and deployed in the CMS trigger system. The trigger targets events containing unusually large numbers of hits in the CMS cathode strip chamber (CSC) muon detectors, a characteristic signature of several LLP scenarios involving displaced decays in the muon system. The HMT implementation, trigger logic, rate dependence with pileup, and operational stability are described. Optimized hit multiplicity thresholds are used to maintain acceptable trigger rates under high-luminosity and high-pileup conditions while preserving high efficiency across a broad range of LLP lifetimes and kinematic regimes. The trigger performance is evaluated using both simulated event samples and proton-proton collision data collected during Run 3 of the LHC. The HMT substantially extends the CMS sensitivity to non-standard signatures associated with LLP decays and provides a flexible platform for future searches for physics beyond the Standard Model.
A search for long-lived particles originating from the decay of 𝑏 hadrons produced in proton-proton collisions with a center-of-mass energy of 13 TeV at the LHC is presented. The analysis is performed on a dataset recorded in 2018, corresponding to an integrated luminosity of 41.6 fb −1 . Interactions of the long-lived particles in the CMS endcap muon system would create hadronic or electromagnetic showers, producing clusters of detector hits. Selected events contain at least one such high-multiplicity cluster in the muon endcaps and require the presence of a displaced muon. The most stringent upper limits to date on the branching fraction ℬ(𝐵 →𝐾Φ), where the long-lived particle Φ decays to a pair of hadrons, are obtained for Φ masses of 0.3–3.0 GeV and Φ mean proper decay lengths in the range of 1–500 cm.
We report the test of many of the key elements of the laser-based calibration system for muon g - 2 experiment E989 at Fermilab. The test was performed at the Laboratori Nazionali di Frascati's Beam Test Facility using a 450 MeV electron beam impinging on a small subset of the final g - 2 lead-fluoride crystal calorimeter system. The calibration system was configured as planned for the E989 experiment and uses the same type of laser and most of the final optical elements. We show results regarding the calorimeter's response calibration, the maximum equivalent electron energy which can be provided by the laser and the stability of the calibration system components.
The Muon Campus (MC) is able to measure Muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors and four liquid helium refrigerators. The centerpiece of the Muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire, was built for the previous g-2 experiment at Brookhaven. Due to each subsystem has to be far away from each other and be placed in the distant location, therefore, Siemens Process Control System PCS7-400, Automation Direct DL205 & DL05 PLC, Synoptic and Fermilab ACNET HMI are the ideal choices as the MC g-2 cryogenic distribution real-time and on-Line remote control system. This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time and On-Line remote control systems.
The CMS experiment will be upgraded for operation at the HighLuminosity LHC to maintain and extend its physics performance under extreme pileup conditions. Upgrades will include an entirely new tracking system, supplemented by a track finder processor providing tracks at Level-1, as well as a high-granularity calorimeter in the endcap region. New front-end and back-end electronics will also provide the Level-1 trigger with high-resolution information from the barrel calorimeter and the muon systems. The upgraded Level-1 processors, based on powerful FPGAs, will be able to carry out sophisticated feature searches with resolutions often similar to the offline ones, while keeping pileup effects under control. In this paper, we discuss the feasibility of a system capturing Level-1 intermediate data at the beam-crossing rate of 40 MHz and carrying out online analyzes based on these limited-resolution data. This 40 MHz scouting system would provide fast and virtually unlimited statistics for detector diagnostics, alternative luminosity measurements and, in some cases, calibrations. It has the potential to enable the study of otherwise inaccessible signatures, either too common to fit in the Level-1 accept budget, or with requirements which are orthogonal to “mainstream” physics, such as long-lived particles. We discuss the requirements and possible architecture of a 40 MHz scouting system, as well as some of the physics potential, and results from a demonstrator operated at the end of Run-2 using the Global Muon Trigger data from CMS. Plans for further demonstrators envisaged for Run-3 are also discussed.
The ATLAS muon Cathode Strip Chamber (CSC) backend readout system has been upgraded during the LHC 2013-2015 shutdown to be able to handle the higher Level-1 trigger rate of 100 kHz and the higher occupancy at Run-2 luminosity. The readout design is based on the Reconfigurable Cluster Element (RCE) concept for high bandwidth generic DAQ implemented on the Advanced Telecommunication Computing Architecture (ATCA) platform. The RCE design is based on the new System on Chip XILINX ZYNQ series with a processor-centric architecture with ARM processor embedded in FPGA fabric and high speed I/O resources. Together with auxiliary memories, all of these components form a versatile DAQ building block that can host applications tapping into both software and firmware resources. The Cluster on Board (COB) ATCA carrier hosts RCE mezzanines and an embedded Fulcrum network switch to form an online DAQ processing cluster. More compact firmware solutions on the ZYNQ for high speed input and output fiberoptic links and TTC allowed the full system of 320 input links from the 32 chambers to be processed by 6 COBs in one ATCA shelf. The full system was installed in September 2014. In conclusion, we will present the RCE/COB design concept, the firmware and software processing architecture, and the experience from the intense commissioning for LHC Run 2.
The ATLAS muon Cathode Strip Chamber (CSC) back-end readout system has been upgraded during the LHC 2013-2015 shutdown to be able to handle the higher Level-1 trigger rate of 100 kHz and the higher occupancy at Run 2 luminosity. The readout design is based on the Reconfiguration Cluster Element (RCE) concept for high bandwidth generic DAQ implemented on the ATCA platform. The RCE design is based on the new System on Chip Xilinx Zynq series with a processor-centric architecture with ARM processor embedded in FPGA fabric and high speed I/O resources together with auxiliary memories to form a versatile DAQ building block that can host applications tapping into both software and firmware resources. The Cluster on Board (COB) ATCA carrier hosts RCE mezzanines and an embedded Fulcrum network switch to form an online DAQ processing cluster. More compact firmware solutions on the Zynq for G-link, S-link and TTC allowed the full system of 320 G-links from the 32 chambers to be processed by 6 COBs in one ATCA shelf through software waveform feature extraction to output 32 S-links. Furthermore, the full system was installed in Sept. 2014. We will present the RCE/COB design concept, the firmware and software processing architecture, and the experience from the intense commissioning towards LHC Run 2.
Here we describe the installation, commissioning, and characterization of the new injection kicker system in the Muon g – 2 Experiment (E989) at Fermilab, which makes a precision measurement of the muon magnetic anomaly. Three Blumlein pulsers drive each of the 1.27-m-long non-ferric kicker magnets, which reside in a storage ring vacuum (SRV) that is subjected to a 1.45 T magnetic field. The new system has been redesigned relative to Muon g – 2 ’s predecessor experiment, and we present those details in this manuscript.
A search for charged massive stable particles has been performed with the D0 detector using 1.1 fb -1 of data. The speed of the particle has been calculated based on the time-of-flight and position information in the muon system. The present research is limited to direct pair-production of the charged massive long-lived particles. We do not consider CMSPs that result from the cascade decays of heavier particles. In this analysis, the exact values of the model parameters of the entire supersymmetric particle mass spectrum, relevant for cascade decays, are not important. We found no evidence of the signal. 95% CL cross-section upper limits have been set on the pair-productions of the stable scaler tau lepton, the gaugino-like charginos, and the higgsino-like charginos. The upper cross section limits vary from 0.31 pb to 0.04 pb, for stau masses in the range between 60 GeV and 300 GeV. We use the nominal value of the theoretical cross section to set limits on the mass of the pair produced charginos. We exclude the pair-produced stable gaugino-like charginos with mass below 206 GeV, and higgsino-like charginos below 171 GeV, respectively. Although the present sensitivity is insufficient to test the model of the pair produced stable staus, we do set cross section limits which can be applied to the pair production of any charged massive stable particle candidates with similar kinematics. These are the most restrictive limits to the present on the cross sections for CMSPs and the first published from the Tevatron Collider Run II. The manuscript has been published by Physical Review Letters in April 2009 and is available at arXiv as.
The CMS collaboration has developed a fast Monte Carlo simulation of the CMS detector with event production rates ~100 times faster than the GEANT4-based simulation, with nonetheless comparable accuracy for most of the physics objects typically considered in the analyses. We discuss basic technical principles of the CMS Fast Simulation and their implementation in the different components of the detector: the silicon tracker, the electromagnetic calorimeter, the hadronic calorimeter, the muon system, the Level 1 and the High Level Trigger. A few comparisons of the Fast Simulation results both with the GEANT4-based Full Simulation and with the LHC data are shown.
The first measurement of the C P asymmetry of the decay rate ( A C P ) and the C P average ( Σ A FB ) and C P asymmetry ( Δ A FB ) of the forward-backward asymmetry in the muon system of Λ c + → p μ + μ − decays is reported. The measurement is performed using a data sample of proton-proton collisions, recorded by the LHCb experiment from 2016 to 2018 at a center-of-mass energy of 13 TeV, which corresponds to an integrated luminosity of 5.4 fb − 1 . The asymmetries are measured in two regions of dimuon mass near the ϕ -meson mass peak. The dimuon-mass integrated results are A C P = ( − 1.1 ± 4.0 ± 0.5 ) % , Σ A FB = ( 3.9 ± 4.0 ± 0.6 ) % , Δ A FB = ( 3.1 ± 4.0 ± 0.4 ) % , where the first uncertainty is statistical and the second systematic. The results are consistent with the conservation of C P symmetry and the Standard Model expectations. © 2025 CERN, for the LHCb Collaboration 2025 CERN
In this Final Report, we the researchers of the high energy physics group at Tufts University summarize our works and achievements in three frontier areas of elementary particle physics: (i) Neutrino physics at the Intensity Frontier, (ii) Collider physics at the Energy Frontier, and (iii) Theory investigations of spin structure and quark-gluon dynamics of nucleons using quantum chromodynamics. With our Neutrino research we completed, or else brought to a useful state, the following: Data-taking, physics simulations, physics analysis, physics reporting, explorations of matter effects, and detector component fabrication. We conducted our work as participants in the MINOS, NOvA, and LBNE neutrino oscillation experiments and in the MINERvA neutrino scattering experiment. With our Collider research we completed or else brought to a useful state: Data-taking, development of muon system geometry and tracking codes, software validation and maintenance, physics simulations, physics analysis, searches for new particles, and study of top-quark and B-quark systems. We conducted these activities as participants in the ATLAS proton-proton collider experiment at CERN and in the CDF proton-antiproton collider experiment at Fermilab. In our Theory research we developed QCD-based models, applications of spin phenomenology to fundamental systems, fitting of models to data, presenting and reporting of new concepts and formalisms. The overarching objectives of our research work have always been: 1) to test and clarify the predictions of the Standard Model of elementary particle physics, and 2) to discover new phenomena which may point the way to a more unified theoretical framework.
Several models of new physics yield particles that are massive, long-lived, and have an electric charge, Q, greater than that of the electron, e. A search for evidence of such particles was performed using 5.0 fb -1 and 18.8 fb -1 of proton-proton collision data collected at √s = 7 TeV and √s = 8 TeV, respectively, with the Compact Muon Solenoid detector at the Large Hadron Collider. The distinctive detector signatures of these particles are that they are slow-moving and highly ionizing. Ionization energy loss and time-of- flight measurements were made using the inner tracker and the muon system, respectively. The search is sensitive to 1e ≤ |Q| ≤ 8e. Data were found to be consistent with standard model expectations and upper limits on the production cross section of these particles were computed using a Drell-Yan-like production model. Masses below 517, 687, 752, 791, 798, 778, 753, and 724 GeV are excluded for |Q| = 1e, 2e, 3e, 4e, 5e, 6e, 7e, and 8e, respectively.
Over the past few decades, Micro Pattern Gaseous Detector (MPGD) technologies have been increasingly adopted as tracking detector options in High Energy and Nuclear Physics experiments thanks to their good spatial resolution, high-rate capability, stability and more importantly their ability for large area coverage at a relatively low cost compared to the alternative. The thin gap GEM-µRWELL hybrid detector is the latest addition to the MPGD family, that was introduced to vastly improve the spatial resolution capability of gaseous trackers when deployed in the barrel region to cover large angular acceptance of the central tracker in a collider experiment. In this talk, I will re-introduce the concept and motivation for the development of thin gap GEM-µRWELL hybrid technology with an emphasis on the initial studies that establish the proof-of-concept of the technology. I will then discuss the more recent results from latest beam test campaign at Jefferson Lab in May 2025 to study detector efficiency performance with various gas mixtures. I will also briefly present the ongoing activities to develop large area thin gap GEM-µRWELL tracking detectors for the ePIC experiment of the future Electron Ion Collider as well as the exploration of the technology to provide large area tracking options to the muon system of experiments at a future Higgs Factory Collider such as the FCC-ee for example. Finally, I will conclude with some perspectives on new ideas under exploration to develop the next generation of thin gap MPGD technologies with enhanced timing and spatial resolution capabilities
The new muon ( g −2) experiment E989 at Fermilab will be equipped with a laser calibration system for all the 1296 channels of the calorimeters. An integrating sphere and an alternative system based on an engineered diffuser have been considered as possible light distributors for the experiment. We present here a detailed comparison of the two based on temporal response, spatial uniformity, transmittance and time stability.
The Compact Muon Solenoid (CMS) experiment at CERN is a multi-purpose experiment designed to exploit the physics of proton-proton collisions at the Large Hadron Collider collision energy (14TeV at centre of mass) over the full range of expected luminosities (up to 10(34)cm(-')(2)s(-')(1)). The CMS detector control system (DCS) ensures a safe, correct and efficient operation of the detector so that high quality physics data can be recorded. The system is also required to operate the detector with a small crew of experts who can take care of the maintenance of its software and hardware infrastructure. The subsystems size sum up to more than a million parameters that need to be supervised by the DCS. A cluster of roughly 100 servers is used to provide the required processing resources. A scalable approach has been chosen factorizing the DCS system as much as possible. CMS DCS has made clear a division between its computing resources and functionality by creating a computing framework allowing plugging in of functional components. DCS components are developed by the subsystems expert groups while the computing infrastructure is developed centrally. To ensure the correct operation of the detector, DCS organizes the communication between the accelerator and the experiment systems making sure that the detector is in a safe state during hazardous situations and is fully operational when stable conditions are present. This paper describes the current status of the CMS DCS focusing on operational aspects and the role of DCS in this communication.