Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

ISAC SC-LINAC PHASE-II HELIUM REFRIGERATOR COMMISSIONING AND FIRST OPERATIONAL EXPERIENCE AT TRIUMF

ISAC Phase-II is an upgrade of the radioactive isotope superconducting linear accelerator, SC-linac, at TRIUMF. The Phase-I section of the accelerator, medium-beta, is operational and is cooled with a 600 W helium refrigerator, commissioned in March 2005. An identical refrigerator is being used with the Phase-II segment of the accelerator; which is now under construction. The second refrigerator has been commissioned and tested with the Phase-I section of the linac and is used for Phase-II linac development, including new SC-cavity performance tests. The commissioning of the Phase-II refrigeration system and recent operational experience is presented.

43 PARTICLE ACCELERATORS↗

Estimation of pipe failure frequencies in the absence of operational experience data: A pilot study

Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The B737 MAX 8 Accidents as Operational Experiences With Automation Transparency

Automation transparency has come into prominence in the human-machine systems literature, with researchers offering definitions, models, design frameworks, and empirical findings. However, missing from the literature are reflections on the actual operational experiences of human crews interacting with intelligent automation conceived from multiple transparency perspectives. The Boeing 737 MAX 8 accidents present a tragic case of a catastrophic failure of automation transparency. We explore this case with an emphasis on extracting design and regulatory insights for the nuclear power and other safety-critical domains.

99 GENERAL AND MISCELLANEOUS↗

Operating Experience Review of the INL HTE Gas Monitoring System

This paper describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored at hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and unwanted alarms are described. The calibration session time durations are described. Some simple statistics are given for the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

08 HYDROGEN↗

Operating experience with the 200 kW MOD-OA wind turbine generators

The machine configuration and its advantages and disadvantages, particularly as it affects reliability are discussed. The machine performance, both availability and power output characteristics are described. The Mod-OA operational experience is documented. The characteristics of the wind energy generated, the machine performance, and the subsystem strengths and weaknesses are discussed. An assessment of the project success in fulfilling its goals and objectives is also presented.

Birchenough, A. G.↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

Fermilab SRF cryomodule operational experience

Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.

43 PARTICLE ACCELERATORS↗

Operational Experience with the MICE Spectrometer Solenoid System

The Muon Ionization Cooling Experiment located at Rutherford Appleton Laboratory in England utilizes a supercon-ducting solenoid system for the muon cooling channel that also holds particle tracking detectors and muon absorbers inside their bores. The solenoid system installation was completed in summer of 2015 and after commissioning the system it has been running successfully. As a result, this paper summarizes the commissioning results and operational experience with the magnets focusing on the per-formance of the two Spectrometer Solenoids built by the US.

43 PARTICLE ACCELERATORS↗

Operational Experience of a Cryomodule Test Stand for LCLS-II Cryomodules

CMTS1 (cryomodule test stand 1) at Fermilab was built to test cryomodules built for the LCLS-II beamline at SLAC and is currently testing cryomodules for LCLS-II-HE, the high energy upgrade to LCLS-II. The first cryomodule test was in 2016 and to date over 30 cryomodules have been tested here. This talk will highlight operational experience of the vacuum systems including insulating, coupler, and a low particulate beamline vacuum system. It will focus on the problems that have come up over the years, their solutions, and mitigations put in place to prevent further issues.

43 PARTICLE ACCELERATORS↗

OPERATIONAL EXPERIENCE AND REDESIGN OF THE TUNER WITH-OUT SPRING FINGERS FOR THE LEReC WARM CAVITY

A folded coaxial tuner without spring fingers was de-signed for the Low Energy Relativistic Heavy Ion Collider (RHIC) electron Cooler (LEReC) 2.1 GHz warm cavity. During RHIC run 2019, this tuner was found to cause cavity trips via different failure modes. After analyzing these failure modes, a new straight coaxial tuner without spring fingers was proposed and was installed. We show the operational experience of the new tuner in this paper.

43 PARTICLE ACCELERATORS↗

Commissioning and Early Operation Experience of the NSLS-II Storage Ring RF System

The National Synchrotron Light Source II (NSLS-II) is a 3 GeV electron X-ray user facility commissioned in 2014. The storage ring RF system, essential for replenishing energy loss per turn of the electrons, consists of digital low level RF controllers, 310 kW CW klystron transmitters, CESR-B type superconducting cavities, as well as a supporting cryogenic system. Here we will report on RF commissioning and early operation experience of the system for beam current up to 200mA.

43 PARTICLE ACCELERATORS↗

Plasmas, Dielectrics and the Ultrafast: First Science and Operational Experience at FACET

FACET (Facility for Advanced Accelerator and Experimental Tests) is an accelerator R&D test facility that has been recently constructed at SLAC National Accelerator Laboratory. The facility provides 20 GeV, 3 nC electron beams, short (20 {micro}m) bunches and small (20 {micro}m wide) spot sizes, producing uniquely high power beams. FACET supports studies from many fields but in particular those of Plasma Wakefield Acceleration and Dielectric Wakefield Acceleration. FACET is also a source of THz radiation for material studies. We present the FACET design, initial operating experience and first science from the facility.

36 MATERIALS SCIENCE↗

Utility operational experience on the NASA/DOE MOD-0A 200-kW wind turbine

The Mod-0A 200 wind turbine was designed and fabricated as part of the Federal Wind Energy Program. Early wind turbine operation and performance data were obtained while gaining initial experience in the operation of large, horizontal axis wind turbines in typical utility environments. The Mod-0A wind turbine was turned over to the Town of Clayton Light and Water Plant, Clayton, NM, for utility operation and on December 31, 1978, the machine had completed ten months of utility operation. The machine is described and the recent operational experience at Clayton, NMis documented.

Glasgow, J. C.↗

IEA-R1 Nuclear Research Reactor: 58 Years of Operating Experience and Utilization for Research, Teaching and Radioisotopes Production

IEA-R1 research reactor at the Instituto de Pesquisas Energeticas e Nucleares (Nuclear and Energy Research Institute) IPEN, Sao Paulo, Brazil is the largest power research reactor in Brazil, with a maximum power rating of 5 MWth. It is being used for basic and applied research in the nuclear and neutron related sciences, for the production of radioisotopes for medical and industrial applications, and for providing services of neutron activation analysis, real time neutron radiography, and neutron transmutation doping of silicon. IEA-R1 is a swimming pool reactor, with light water as the coolant and moderator, and graphite and beryllium as reflectors. The reactor was commissioned on September 16, 1957 and achieved its first criticality. It is currently operating at 4.5 MWth with a 60-hour cycle per week. In the early sixties, IPEN produced {sup 131}I, {sup 32}P, {sup 198}Au, {sup 24}Na, {sup 35}S, {sup 51}Cr and labeled compounds for medical use. During the past several years, a concerted effort has been made in order to upgrade the reactor power to 5 MWth through refurbishment and modernization programs. One of the reasons for this decision was to produce {sup 99}Mo at IPEN. The reactor cycle will be gradually increased to 120 hours per week continuous operation. It is anticipated that these programs will assure the safe and sustainable operation of the IEA-R1 reactor for several more years, to produce important primary radioisotopes {sup 99}Mo, {sup 125}I, {sup 131}I, {sup 153}Sm and {sup 192}Ir. Currently, all aspects of dealing with fuel element fabrication, fuel transportation, isotope processing, and spent fuel storage are handled by IPEN at the site. The reactor modernization program is slated for completion by 2015. This paper describes 58 years of operating experience and utilization of the IEA-R1 research reactor for research, teaching and radioisotopes production. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Operational experience with the CMS data acquisition system

The data-acquisition (DAQ) system of the CMS experiment at the LHC performs the read-out and assembly of events accepted by the first level hardware trigger. Assembled events are made available to the high-level trigger (HLT), which selects interesting events for offline storage and analysis. The system is designed to handle a maximum input rate of 100 kHz and an aggregated throughput of 100 GB/s originating from approximately 500 sources and 10^8 electronic channels. An overview of the architecture and design of the hardware and software of the DAQ system is given. We report on the performance and operational experience of the DAQ and its Run Control System in the first two years of collider runs of the LHC, both in proton-proton and Pb-Pb collisions. We present an analysis of the current performance, its limitations, and the most common failure modes and discuss the ongoing evolution of the HLT capability needed to match the luminosity ramp-up of the LHC.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational experience with the new CMS DAQ-Expert

The data acquisition (DAQ) system of the Compact Muon Solenoid (CMS) at CERN reads out the detector at the level-1 trigger accept rate of 100 kHz, assembles events with a bandwidth of 200 GB/s, provides these events to the high level-trigger running on a farm of about 30k cores and records the accepted events. Comprising custom-built and cutting edge commercial hardware and several 1000 instances of software applications, the DAQ system is complex in itself and failures cannot be completely excluded. Moreover, problems in the readout of the detectors,in the first level trigger system or in the high level trigger may provoke anomalous behaviour of the DAQ systemwhich sometimes cannot easily be differentiated from a problem in the DAQ system itself. In order to achieve high data taking efficiency with operators from the entire collaboration and without relying too heavily on the on-call experts, an expert system, the DAQ-Expert, has been developed that can pinpoint the source of most failures and give advice to the shift crew on how to recover in the quickest way. The DAQ-Expert constantly analyzes monitoring data from the DAQ system and the high level trigger by making use of logic modules written in Java that encapsulate the expert knowledge about potential operational problems. The results of the reasoning are presented to the operator in a web-based dashboard, may trigger sound alerts in the control room and are archived for post-mortem analysis - presented in a web-based timeline browser. We present the design of the DAQ-Expert and report on the operational experience since 2017, when it was first put into production.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗