Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

Source record↗

Runway Independent Aircraft Extremely Short Takeoff and Landing

This report Summarizes the work done is support of NASA/Ames Runway Independent Aircraft Research during the summer of 2003. This work centered on the tasks laid out by the Statement of Work, which was to: Identify and assess operational scenarios including airport air and ground operations and how RIA operations would interface; 2) Identify critical technologies and create a list of technologies that might be pushed to provide a quantum jump in operating economy, reliability, and safety should sufficient finding be available; 3) Create public domain powered high lift methodologies; and 4) Identify and assess vehicle concepts that provide innovative approaches to RIA operations. All these tasks were accomplished, with certain areas needing additional exploration in future grant work. Three designs were analyzed to provide strawman configurations for the RIA operations. All three aircraft carried 60 passengers, with a stage length of 1,000 nautical miles. They were capable of operating with a balanced field length of 2000 feet or less. Three different technology approaches were explored. The first, the Model 115, was a mid-wing USB design, developed as a near-term, low risk concept. The second aircraft, the EMAX, used a directed thrust system, was a far-term, high-risk approach. The third configuration was the Model 114, whose development began in summer 2002. In addition, further research was conducted on issues related to STOL operations, such as noise concerns, SNI operations, and other areas of interest.

Hall, David W.↗

Risk-Assessment for Equipment Operating on the Lunar Surface

Particle-size distribution of lunar dust simulant is evaluated using scanning electron spectroscopy in order to consider approaches to evaluating risk to individual mechanical components operating on the lunar surface. Assessing component risk and risk-mitigation during actual operations will require noninvasive continuous data gathering on numerous parameters. Those data sets would best be evaluated using data-mining algorithms to assess risk, and recovery from risk, of individual mechanical components in real-time.

Richmond, R. C.↗

Modeling and Simulation Verification, Validation and Accreditation (VV&A): A New Undertaking for the Exploration Systems Mission Directorate

and Accreditation (VV&A) session audience, a snapshot review of the Exploration Space Mission Directorate s (ESMD) investigation into implementation of a modeling and simulation (M&S) VV&A program. The presentation provides some legacy ESMD reference material, including information on the then-current organizational structure, and M&S (Simulation Based Acquisition (SBA)) focus contained therein, to provide a context for the proposed M&S VV&A approach. This reference material briefly highlights the SBA goals and objectives, and outlines FY05 M&S development and implementation consistent with the Subjective Assessment, Constructive Assessment, Operator-in-the-Loop Assessment, Hardware-in-the-Loop Assessment, and In Service Operations Assessment M&S construct, the NASA Exploration Information Ontology Model (NExIOM) data model, and integration with the Windchill-based Integrated Collaborative Environment (ICE). The presentation then addresses the ESMD team s initial conclusions regarding an M&S VV&A program, summarizes the general VV&A implementation approach anticipated, and outlines some of the recognized VV&A program challenges, all within a broader context of the overarching Integrated Modeling and Simulation (IM&S) environment at both the ESMD and Agency (NASA) levels. The presentation concludes with a status on the current M&S organization s progress to date relative to the recommended IM&S implementation activity. The overall presentation was focused to provide, for the Verification, Validation,

Prill, Mark E.↗

Assessment of Uncertainty-Based Screening Volumes for NASA Robotic LEO and GEO Conjunction Risk Assessment

Conjunction Assessment operations require screening assets against the space object catalog by placing a pre-determined spatial volume around each asset and predicting when another object will violate that volume. The selection of the screening volume used for each spacecraft is a trade-off between observing all conjunction events that may pose a potential risk to the primary spacecraft and the ability to analyze those predicted events. If the screening volumes are larger, then more conjunctions can be observed and therefore the probability of a missed detection of a high risk conjunction event is small; however, the amount of data which needs to be analyzed increases. This paper characterizes the sensitivity of screening volume size to capturing typical orbit uncertainties and the expected number of conjunction events observed. These sensitivities are quantified in the form of a trade space that allows for selection of appropriate screen-ing volumes to fit the desired concept of operations, system limitations, and tolerable analyst workloads. This analysis will specifically highlight the screening volume determination and selection process for use in the NASA Conjunction Assessment Risk Analysis process but will also provide a general framework for other Owner / Operators faced with similar decisions.

Narvet, Steven W.↗

Biomedical programs operations plans

Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

Walbrecher, H. F.↗

Operational design factors for NASP derived vehicles

The factors that significantly affect the operability of aerospace planes are identified and considered in terms of the development of the National Aerospace Plane (NASP). The aircraftlike vehicle can be affected by variables related to the structure, propulsion, and mechanical elements of the design. The requirements to control the factors are listed including robustness, fuels and propellants, maintainability, autonomy, and development testing. The details of the requirements indicate critical factors such as the strength-to-weight ratios of the materials, propellant-system components that can withstand 5000 consecutive cycles, and low vehicle-failure probabilities. The NASP program is concluded to require: (1) models for quantitative operational assessments; (2) a modular design for the NASP structure; (3) computer-technology integration; and (4) technologies to support and normalize cryogenic operations.

Hickman, R. A.↗

Psychophysiological Monitoring of Aerospace Crew State

As next-generation space exploration missions necessitate increasingly autonomous systems, there is a critical need to better detect and anticipate crewmember interactions with these systems. The success of present and future autonomous technology in exploration spaceflight is ultimately dependent upon safe and efficient interaction with the human operator. Optimal interaction is particularly important for surface missions during highly coordinated extravehicular activity (EVA), which consists of high physical and cognitive demands with limited ground support. Crew functional state may be affected by a number of variables including workload, stress, and motivation. Real-time assessments of crew state that do not require a crewmember’s time and attention to complete will be especially important to assess operational performance and behavioral health during flight. In response to the need for objective, passive assessment of crew state, the aim of this work is to develop an accurate and precise prediction model of human functional state for surface EVA using multi-modal psychophysiological sensing. The psychophysiological monitoring approach relies on extracting a set of features from physiological signals and using these features to classify an operator’s cognitive state. This work aims to compile a non-invasive sensor suite to collect physiological data in real-time. Training data during cognitive and more complex functional tasks will be used to develop a classifier to discriminate high and low cognitive workload crew states. The classifier will then be tested in an operationally relevant EVA simulation to predict cognitive workload over time. Once a crew state is determined, further research into specific countermeasures, such as decision support systems, would be necessary to optimize the automation and improve crew state and operational performance.

Wusk, Grace C.↗

Flight evaluation of LORAN-C in the State of Vermont

A flight evaluation of LORAN C as a supplement to existing navigation aids for general aviation aircraft, particularly in mountainous regions of the United States and where VOR coverage is limited was conducted. Flights, initiated in the summer months, extend through four seasons and practically all weather conditions typical of northeastern U.S. operations. Assessment of all the data available indicates that LORAN C signals are suitable as a means of navigation during enroute, terminal and nonprecision approach operations and the performance exceeds the minimum accuracy criteria.

Mackenzie, F. D.↗

Optical Navigation for the Dawn Mission at Vesta

The Dawn S/C was launched in September 2007 in order to perform remote sensing observations of the asteroids Vesta and Ceres. Dawn entered into orbit about Vesta in July 2011, completed successfully the mission goals, that were carried out in four different science orbits, by August 2012 and has since departed towards asteroid Ceres. An important component of the Dawn navigation was optical navigation, which was performed at almost all mission phases.Optical data types were used in the overall orbit determination process. In addition they were used to determine some key aspects of the asteroid's physical characteristics, such as the rotational axis, shape and surface morphology and gravity terms. In this paper we present an overview of the optical navigation operations at Vesta, the optical navigation planning, image acquisition strategy, data reduction methodology, and the up-to-date post operations assessment. Of particular importance is the extensive use of landmark navigation, which was performed for the first time for real-time support of operations and which comprised the bulk of the optical data processing.

orbital operations↗

Solar-energy-system performance evaluation: Honeywell OTS 44, Ocmulgee, Georgia

The operation and technical performance of the solar operational test site (OTS 44) are described, based on data collected between April, 1981 and August, 1981. The following topics are discussed: system description, performance assessment, operating energy, energy savings, system maintenance, and conclusions. The solar energy system at OTS 44 is a hydronic heating and cooling system consisting of 5040 square feet of liquid cooled flat plate collectors; a 4000 gallon thermal storage tank; one 25 ton capacity organic Rankine cycle engine assisted water chillers; a forced draft cooling tower; and associated piping, pumps, valves, controls and heat rejection equipment. The solar system has eight basic modes of operation and several combination modes for providing space conditioning and hot water to the building. Data monitored during the 4 months of the operational test period found that the solar system collected 285 MMBtu of thermal energy of the total incident solar energy of 1040 MMBtu and provided 210 MMBtu for cooling and 10 MMBtu for heating and hot water. The net electrical energy saving due to the solar system was approximately 2600 kWh(e), and fossil energy saving was about 20 million Btu (MMBtu).

Mathur, A. K.↗

Space Station - New venture/old problem

Four key operations-related costs are associated with the Space Station: (1) transportation, (2) data management, (3) sustaining enginenering, and (4) integrated logistics. Life cycle cost principles will be utilized by the Space Station Program to assess operating costs associated with any particular design 'improvement' opportunity.

Cox, John T.↗

An Assessment of a Titanium Alloy for Supersonic Transport Operations

An assessment is given of the materials problems and implications regarding the use of Ti-8Al-1Mo-IV alloy sheet for the skin of a supersonic transport. Although the assessment of this alloy in the duplex annealed condition is generally favorable, several questions remain unanswered and new ones continue to arise. The seriousness of the salt stress corrosion problem at 500 F and above under flight conditions cannot be predicted on the basis of current laboratory corrosion tests. A new potential stress corrosion problem at ambient temperatures in the presence of cracks and salt water requires investigation. The ability to withstand a 30,000-hour exposure at 550 F without undue degradation of the material or welds will remain doubtful until more long-time data are available. The substitution of a more corrosion-resistant and stable titanium alloy in the tension critical areas of the structure may prove advisable.

Heimerl, George J.↗

Integrated Operations Architecture Technology Assessment Study

As part of NASA's Integrated Operations Architecture (IOA) Baseline, NASA will consolidate all communications operations. including ground-based, near-earth, and deep-space communications, into a single integrated network. This network will make maximum use of commercial equipment, services and standards. It will be an Internet Protocol (IP) based network. This study supports technology development planning for the IOA. The technical problems that may arise when LEO mission spacecraft interoperate with commercial satellite services were investigated. Commercial technology and services that could support the IOA were surveyed, and gaps in the capability of existing technology and techniques were identified. Recommendations were made on which gaps should be closed by means of NASA research and development funding. Several findings emerged from the interoperability assessment: in the NASA mission set, there is a preponderance of small. inexpensive, low data rate science missions; proposed commercial satellite communications services could potentially provide TDRSS-like data relay functions; and. IP and related protocols, such as TCP, require augmentation to operate in the mobile networking environment required by the space-to-ground portion of the IOA. Five case studies were performed in the technology assessment. Each case represented a realistic implementation of the near-earth portion of the IOA. The cases included the use of frequencies at L-band, Ka-band and the optical spectrum. The cases also represented both space relay architectures and direct-to-ground architectures. Some of the main recommendations resulting from the case studies are: select an architecture for the LEO/MEO communications network; pursue the development of a Ka-band space-qualified transmitter (and possibly a receiver), and a low-cost Ka-band ground terminal for a direct-to-ground network, pursue the development of an Inmarsat (L-band) space-qualified transceiver to implement a global, low data rate network for LEO/MEO, mission spacecraft; and, pursue developmental research for a miniaturized, high data rate optical transceiver.

Source record↗

Moving-Base Simulation Evaluation of Control/Display Integration Issues for ASTOVL Aircraft

A moving-base simulation has been conducted on the Vertical Motion Simulator at Ames Research Center using a model of an advanced, short takeoff and vertical landing (STOVL) lift fan fighter aircraft. This experiment expanded on investigations during previous simulations with this STOVL configuration with the objective of evaluating (1) control law modifications over the low speed flight envelope, (2) integration of the throttle inceptor with flight control laws that provide direct thrust command for conventional flight, vertical and short takeoff, and flightpath or vertical velocity command for transition, hover, and vertical landing, (3) control mode blending for pitch, roll, yaw, and flightpath control during transition from wing-borne to jet-borne flight, and (4) effects of conformal versus nonconformal presentation of flightpath and pursuit guidance symbology on the out-the-window display for low speed STOVL operations. Assessments were made for takeoff, transition, hover, and landing, including precision hover and landing aboard an LPH-type amphibious assault ship in the presence of winds and rough seas. Results yielded Level 1 pilot ratings for the flightpath and vertical velocity command modes for a range of land-based and shipboard operation and were consistent with previous experience with earlier control laws and displays for this STOVL concept. Control mode blending was performed over speed ranges in accord with the pilot's tasks and with the change of the basic aircraft's characteristics between wing-borne and hover flight. Blending of yaw control from heading command in hover to sideslip command in wing-borne flight performed over a broad speed range helped reduce yaw transients during acceleration through the low speed regime. Although the pilots appreciated conformality of flightpath and guidance symbols with the external scene during the approach, increased sensitivity of the symbols for lateral path tracking elevated the pilots' control activity in the presence of turbulence. The pilots preferred the choice of scaling that was originally established during the display development and in-flight evaluations.

Franklin, James A.↗

The JPL isolated application experiment series

The technical, operational, and economic readiness of parabolic dish power systems for a variety of applications in the power range below 10 MWe are discussed. Power systems are developed and tested to the point where commercialization efforts lead to successful market penetration. A key element in this strategy is the use of experiments to test hardware and assess operational readiness. The Isolated Application Experiments are described and their objectives discussed.

Levin, R. R.↗

Extravehicular Activity Testing in Analog Environments: Evaluating the Effects of Center of Gravity and Environment on Human Performance

The EVA Physiology, Systems and Performance (EPSP) Project is performing tests in different analog environments to understand human performance during Extravehicular Activity (EVA) with the aim of developing more safe and efficient systems for lunar exploration missions and the Constellation Program. The project is characterizing human EVA performance in studies using several test beds, including the underwater NASA Extreme Environment Mission Operations (NEEMO) and Neutral Buoyancy Laboratory (NBL) facilities, JSC fs Partial Gravity Simulator (POGO), and the NASA Reduced Gravity Office (RGO) parabolic flight aircraft. Using these varied testing environments, NASA can gain a more complete understanding of human performance issues related to EVA and the limitations of each testing environment. Tests are focused on identifying and understanding the EVA system factors that affect human performance such as center of gravity (CG), inertial mass, ground reaction forces (GRF), suit weight, and suit pressure. The test results will lead to the development of lunar EVA systems operations concepts and design requirements that optimize human performance and exploration capabilities. METHODS: Tests were conducted in the NBL and during NEEMO missions in the NOAA Aquarius Habitat. A reconfigurable back pack with repositionable mass was used to simulate Perfect, Low, Forward, High, Aft and NASA Baseline CG locations. Subjects performed simulated exploration tasks that included ambulation, kneel and recovery, rock pick-up, and shoveling. Testing using POGO, that simulates partial gravity via pneumatic weight offload system and a similar reconfigurable rig, is underway for a subset of the same tasks. Additionally, test trials are being performed on the RGO parabolic flight aircraft. Subject performance was assessed using a modified Cooper-Harper scale to assess operator compensation required to achieve desired performance. All CG locations are based on the assumption of a standardized 6 ft 180 lb subject. RESULTS: The modified Cooper-Harper Scale assesses desired task performance described as performance in a reduced gravity environment as compared to a 1G environment. Modified Cooper-Harper ratings of . 3 indicate no improvements are needed, ratings of 4-6 indicate improvements are desirable, and ratings . 7 indicate improvements are mandatory. DISCUSSION: Differences were noted in suited CH results based on environment at the same CG and suit pressure. Additionally, results suggest that CG location affects unsuited human performance. Subjects preferred locations near their natural CG over those that are high, aft, or a combination of high and aft. Further testing and analyses are planned to compare these unsuited results to suited performance.

Gernhardt, M.L.↗

Multivariate Normality of Cartesian-Framed Covariances: Evaluation and Operational Significance

Collision avoidance relies on representative Cartesian uncertainty volumes in order to calculate probabilities of collision. Among the potential shortcomings of a covariance matrix representation of state errors, the most worrisome is the coordinate mismatch between the Cartesian framework in which these matrices are distributed and the curvilinear path that satellite orbits actually follow. The present study compares curvilinear-based and Cartesian covariance representations for ~50,000 conjunctions to determine the frequency in which significant deviations from Gaussianity are observed, then compares the 2-D Pc result from the Cartesian covariance to a Monte Carlo Pc conducted in element space to assess operational significance.

Lechtenberg, Travis F.↗