Retail Operations to Reduce Risks of Airborne Infectious Disease Transmission
A fact sheet of best practices and guidelines around HVAC, exhaust systems, BAS, elevators, and space use for retail operators.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A fact sheet of best practices and guidelines around HVAC, exhaust systems, BAS, elevators, and space use for retail operators.
Not provided.
Abstract not provided.
Toyota has announced plans for commercial fuel cell vehicle deployment in 2015. To fully realize the benefits of fuel cell vehicles (zero emission with no performance loss in terms of vehicle range and capability), hydrogen produced efficiently from renewable sources is necessary. Most of the hydrogen fueling stations today utilize hydrogen reformed from natural gas (produced onsite or delivered). This enables more stations to be deployed cost-effectively within a network. Producing and using cost-effective renewable hydrogen in fuel cell vehicles will enable realization of the full potential. A viable option of green hydrogen that reliably delivers on the full suite of benefits for Toyota fuel cell vehicle drivers is needed. NREL is in a unique position to analyze and optimize renewable hydrogen production scenarios using the Energy Systems Integration Facility (ESIF), a facility that is specifically designed to evaluate renewable energy integration technologies. As the U.S. Department of Energy's (DOE) primary national laboratory for renewable energy and energy efficiency research and development, NREL has extensive knowledge of photovoltaic systems as well as alternative renewable technologies for efficient and reliable production of green hydrogen.
Abstract not provided.
Abstract not provided.
The purpose of this environmental calculation file (ECF) is to provide the following: Document the data processing and data reduction steps taken to prepare the 200-IA-1 Operable Unit (OU) data set that will be used to calculate the sample-specific screening level human health risk evaluation; Document the data processing and data reduction steps taken to prepare the 200-IA-1 OU data set that will be used to identify analytes that could potentially impact groundwater in the future beneath the 200-IA-1 OU representative waste sites; Document the assumptions, equations, and methodologies used to calculate the screening levels for human health cancer risks and noncancer hazards for each representative waste site assigned to the 200-IA-1 OU. Individual measured soil concentrations from 0 to 4.6 m (15 ft) below ground surface (bgs) (shallow vadose zone) are used to calculate the total excess lifetime cancer risk (ELCR) and hazard index (HI) for the outdoor worker scenario to determine if there is a basis for remedial action. Individual measured soil concentrations from the ground surface to the groundwater table are used for the distribution coefficient (Kd) screen to identify analytes that could potentially impact groundwater in the future beneath the 200-IA-1 OU representative waste sites. This ECF supports DOE/RL-2020-51, 200-IA-1 OU Focused Feasibility Study, under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A risk characterization based upon the evaluation of the health risk estimates developed in this ECF will be presented in the focused feasibility study report.
We have shown in a previous work that the risk of sub-synchronous resonance (SSR) between a wind power plant with Type III wind turbines and series-compensated transmission lines is low when the wind turbines in the plant are operated in grid-forming mode, instead of the standard grid-following mode. The fundamental mechanism behind the improved damping characteristics is explained in this paper by modeling the positive and negative sequence impedances of Type III wind turbines for GFM operation mode. It is discovered that the GFM control naturally acts against the negative resistance of Type III wind turbines that results from an interaction between the proportional gain of the rotor-side converter current controller and negative slip. The developed sequence impedance models and improved damping behavior are verified using PSCAD simulations of a 2.5-MW Type III GFM wind turbine. The modeling predictions are also supported by experimentally measuring the sequence impedance response of a 2.5-MW Type III wind turbine during operation in GFL and GFM modes.
There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.
For this work, a comprehensive quantitative risk assessment for the construction and operation of CO 2 transportation networks considered for the Midcontinent United States was conducted. The results showed risks associated with CO 2 pipelines were significantly less than those of other pipeline types. The assessment used four conceptual pipelines of different lengths to discuss risks operators may see. The assessment evaluated the risk associated with construction and operation using data from the US Occupational Safety Health Administration to determine the risk of injury or death for pipeline workers and data from the US Pipeline and Hazardous Materials Safety Administration for CO 2 , natural gas distribution, natural gas transmission/gathering, and non-CO 2 hazardous liquid pipelines to develop quantitative likelihood and severity values leading to risk values. The data for the assessment covered incidents from 2010 to 2017 for CO 2 pipelines. The average risk for construction and 30 years of operation for four CO 2 pipeline configurations ranging between 79 and 1,546 miles in length was found. The construction and operational risk averaged between $\$1,400,521$ (approximately $\$0.02$/tonne of CO 2 ) for the shorter pipeline (79 miles) and $\$27,481,939$ (approximately $\$0.10$/tonne of CO 2 ) for a longer pipeline (1,546 miles). The largest risks of fatality for CO 2 pipelines comes from vehicle transport. The largest operational risk to the pipeline was due to leakage. Public pipeline opposition is also a significant risk; it was not quantified but is addressed.
Not provided.
Not Available
Explore the source record for details and available documents.
This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.
The growing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electrical grids. Oftentimes, this pressure leads to electrical components failures which might ignite wildfires. This work develops a novel model to balance the reliability of power networks operations and risks of wildfires ignition by optimizing the operational schedule of power transmission networks considering time-varying risk measures that consider exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfires risk. The results demonstrate the ability of the model to reduce wildfires risks significantly without considerable load shedding.
Cyber-informed engineering and security-by-design frameworks are important in promoting the need to identify cybersecurity concerns early in the systems engineering lifecycle so risks from adversarial cyber-attacks can be eliminated or reduced through engineering design practices. In addition to adversarial risk, risk in operational technology systems also includes non-adversarial and unintentional risk from other factors such as human performance errors, environmental conditions, design flaws, and device degradation or failure. This paper introduces a new concept for characterizing digital risk, both adversarial and non-adversarial, and provides the basis for initial research into a novel digital risk analysis approach focused on incorporating attack difficulty into a multi-attribute analysis technique using robust decision-making. This digital risk characterization is also used to frame a discussion on the challenges of competing objectives and competing stakeholder requirements in an integrated energy system project that incorporates a small modular reactor and industrial facility.
The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.
FY24 sustainment project list has been revised resulting in sixteen projects. Total budget for the finalized project list is $9,570,968 (includes FY23 Carryover and FY24). Key factors for project selection included: risk mitigation to address operations highest failure risk subsystems, purchase of long lead parts to address life limited parts, and completion of multi phase sustainment projects initiated in prior year. Given the backlog of projects and limited FY24 funding, there are identified projects that are not included in the final project list that could reduce future Z facility failure risk. Should additional budget become available, these identified projects can be kicked off.