Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

State-based models for planning and execution coordination

Many traditional planners are built on top of existing execution engines that were not necessarily intended to be operated by a planner. The Mission Data System has been designed from the onset to have both an execution and planning engine and provides a framework for producing state-based models that can be used to coordinate planning and execution. The models provide a basis for ensuring the consistency of assumptions made by the execution engine and planner, and the frameworks provide a basis for run time communications between the planner and execution engines.

planning↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Coordination of data relay satellite support

Interoperability as it relates to NASDA and ESA plans to implement S-band services compatible with that provided by TDRSS is discussed. The administrative and operational prerequisites for interoperability are introduced with attention given to coordination before and during the mission, and orbital slot planning. Areas for future technical discussions include a more detailed definition of the RF signal structures for achieving a coordinated S-band service and the examination of schemes (such as baseband cooling) which minimize interference while permitting the joint use of the S-band and promoting interoperability.

Sobieski, S.↗

International Coordination and Cooperation on LunaNet Spectrum

LunaNet is planned to be the network of networks operated by a set of cooperating organizations to provide interoperable Communications, networking, Position, Navigation, and Timing (CPNT) services to users on and around the Moon based on a framework of mutually agreed-upon standards, protocols, frequency bands and interface requirements. LunaNet follows a service-oriented architecture that is agnostic about the types of organizations that provide services, e.g., government, industry, or academia. LunaNet is open, scalable, resilient, secure, and extensible. To achieve these goals, LunaNet Service Providers (LNSP) must coordinate with each other to define and develop the architecture, to plan initial and evolved capabilities, and to operate their networks. One of the central LunaNet tenets is the use of shared spectrum. For example, the Lunar Augmented Navigation Service (LANS) acts like a Global Navigation Satellite System (GNSS) such as the US Global Positioning System (GPS) or European Galileo but the LNSPs’ contributions to LunaNet must use the same frequency band (2483.5 MHz-2500.0 MHz) and transmit the same waveform synchronized by highly accurate clocks so that Users ‘see’ one virtual network and use the same multilateration algorithm to determine their positions. This necessitates a high degree of spectrum coordination. NASA’s Lunar and Human Spaceflight Spectrum Management Team has been actively supporting development of the LunaNet Interoperability Specification (LNIS), soliciting inputs from spectrum policy and planning experts across NASA, ESA and JAXA. Cislunar spectrum use considerations have been studied and adjudicated within the Space Frequency Coordination Group (SFCG) and inform the ongoing discussion of a lunar communication and navigation architecture within the existing radio regulatory framework of the International Telecommunication Union, leading to the 2027 World Radiocommunication Conference (WRC-27). The frequency plan contained in the publicly released draft of the LunaNet Interoperability Specification reflects the initial phase of exploration (roughly to 2030) defining an optimal set of radio frequencies in appropriately allocated services consistent with WRC-23 decisions for use by known or planned CPNT applications, while striving to maximize coexistence and compatibility amongst cislunar systems and other systems within the near-Earth regime (< 2 million km from Earth). Important considerations include: protection of extremely sensitive receive-only radio astronomy systems on the lunar far side, known as the Shielded Zone of the Moon (SZM); compatibility between Direct with Earth (DWE) communications links and links needed to support relay satellites in lunar orbit with their customer systems on orbit or on the lunar surface; compatibility between multiple lunar surface communications systems and capabilities over varied and challenging terrain and distances; as well as ensuring compatibility and interoperability between navigation systems which either leverage Earth-based or in-situ lunar systems. In addition, the lunar CPNT architecture is envisioned to be the basis – with adjustments – of the future Mars CPNT architecture as we expand into the solar system using Interplanetary Networking (IPN). The second phase of lunar spectrum definition will address planned international capabilities for the next decade that will require action at WRC-27 and beyond. This paper will discuss each of these considerations in more depth and how the current LunaNet frequency plan addresses them.

LunaNet↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

Coordinated operation of electricity and natural gas systems from day-ahead to real-time markets

Power systems worldwide are becoming more reliant on energy from natural gas, wind, and solar, posing possible reliability and coordination challenges from the tighter coupling of these infrastructure systems. This paper proposes a framework for the market-based coordination of electricity and natural gas system operations. The proposed framework includes a power system model that accounts for flexibility in the commitment of power plants with short start-up and shut-down times, coupled with a dynamic gas model that simulates when gas cannot be delivered to generators. The capabilities of the framework are illustrated using real-world electric power and gas systems, including scenarios around wind and solar penetrations and the analysis of time-variant, “shaped flow” gas nominations. Our results indicate that coordination between power and gas systems improves total gas delivery and reduces out-of-merit order dispatch in the electricity system, and that shaped flows may reduce unserved gas in systems with high penetrations of wind and solar. Coordination can have mixed effects on carbon-dioxide emissions, with emissions increasing with coordination for current systems during high load weeks but decreasing for systems with high renewable penetrations, particularly during periods of high variability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Query and Data Mining Capabilities for MaROS

The Mars Relay Operational Service (MaROS) comprises a number of tools to coordinate, plan, and visualize various aspects of the Mars Relay network. These levels include a Web-based user interface, a back-end "ReSTlet" built in Java, and databases that store the data as it is received from the network. As part of MaROS, the innovators have developed and implemented a feature set that operates on several levels of the software architecture. This new feature is an advanced querying capability through either the Web-based user interface, or through a back-end REST interface to access all of the data gathered from the network. This software is not meant to replace the REST interface, but to augment and expand the range of available data. The current REST interface provides specific data that is used by the MaROS Web application to display and visualize the information; however, the returned information from the REST interface has typically been pre-processed to return only a subset of the entire information within the repository, particularly only the information that is of interest to the GUI (graphical user interface). The new, advanced query and data mining capabilities allow users to retrieve the raw data and/or to perform their own data processing. The query language used to access the repository is a restricted subset of the structured query language (SQL) that can be built safely from the Web user interface, or entered as freeform SQL by a user. The results are returned in a CSV (Comma Separated Values) format for easy exporting to third party tools and applications that can be used for data mining or user-defined visualization and interpretation. This is the first time that a service is capable of providing access to all cross-project relay data from a single Web resource. Because MaROS contains the data for a variety of missions from the Mars network, which span both NASA and ESA, the software also establishes an access control list (ACL) on each data record in the database repository to enforce user access permissions through a multilayered approach.

Wang, Paul↗

Automation of Coordinated Planning Between Observatories: The Visual Observation Layout Tool (VOLT)

Fulfilling the promise of the era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with the unique opportunity of simultaneously observing a target in multiple wavebands with these observatories. Currently scheduling multiple observatories simultaneously, for coordinated observations, is highly inefficient. Coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. Because they are time-consuming and expensive to schedule, observatories often limit the number of coordinated observations that can be conducted. In order to exploit new paradigms for observatory operation, the Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center has developed a tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the planning of coordinated observations by multiple astronomical observatories. Four of NASA's space-based astronomical observatories - the Hubble Space Telescope (HST), Far Ultraviolet Spectroscopic Explorer (FUSE), Rossi X-ray Timing Explorer (RXTE) and Chandra - are enthusiastically pursuing the use of VOLT. This paper will focus on the purpose for developing VOLT, as well as the lessons learned during the infusion of VOLT into the planning and scheduling operations of these observatories.

Maks, Lori↗

Flight Test Exploration of Integrated Wildfire Response Operations with Crewed and Uncrewed Air Assets

Since 2016, Japan Aerospace Exploration Agency (JAXA) and NASA have partnered to investigate the safe and efficient integration of uncrewed aircraft systems (UAS) in disaster relief operations. Current disaster response operations would benefit from the use of UAS but are limited by the need for safe airspace integration technologies and enabling regulations. The work presented in this paper focuses on the safe integration of UAS and helicopters in active wildfire disaster response operations. The authors propose the use of mission planning and traffic management technologies, including onboard pilot situation awareness support technologies, to coordinate airspace operations between crewed and uncrewed aircraft (e.g., UAS). A representative wildfire scenario including a helicopter and UAS was developed. The helicopter mission included a flight path that mimicked the siphoning of water from a natural water reservoir (lake) and a subsequent water drop over vegetation along the progressing edge of a fire perimeter. Simulated UAS were assumed to conduct aerial ignition flights in the vicinity as part of a controlled burn of the vegetation ahead of the fire front to create a natural barrier between the fire and a nearby populated area. A situation awareness tool was developed and used to support the helicopter pilots’ task to stay clear of the volume of airspace where the UAS was conducting its operation while efficiently conducting the fire suppression mission. A flight test using JAXA’s experimental helicopter was conducted in August 2022 to validate the developed technology. The advantages of the developed technology were demonstrated, and pilot feedback confirmed that real-time awareness of the UAS operation airspace helped the flight planning and execution of a safe mission that minimized the flight time loss due to the potential interference with the UAS. Post-flight interviews with the pilots indicated no sufficient increase in the pilots’ workload and provided ideas for future technology development. Future research will provide recommendations to standards development organizations to support considerations for crewed-uncrewed interactions in disaster-response operations.

disaster response↗

Development of Space Shuttle Rescue and Recovery Operations

As the first Space Shuttle launch was still in our future, many from NASA, the Department of Defense (DoD) and NASA contractors were busy planning for not only a nominal launch and return, but contingency operations at the launch pad and landing sites. Prior to the first launch, detailed coordination, planning and simulations were conducted at all three locations and internal rescue procedures were taught at Kennedy Space Center (KSC). Later in the Program, the Transoceanic Abort Landing (TAL) sites were added in Europe and Africa. For the 51L mission a new TAL site was brought on line in Morocco. However, upon launch, the Shuttle Program experienced it's first lost. During the following months a complete review of all contingency operations (launch and landing) was completed. Many enhancements were made based on the reviews following. A Mode VIII water rescue was developed for NASA by the DoD before the STS-26 launch. Different concepts were explored and being debated by NASA. Training of the contingency forces was required before final decisions were made forcing the teaching of two different sets of procedures. To assist with training, a video was developed for the fire/crash/rescue personnel. This accompanied the detailed extraction procedures that were developed by a combination of KSC and DoD firemen. Training for the fire/crash/rescue personnel at Vandenberg AFB was also being planned before the accident happen. The fire/crash/rescue mockup that was being built at Chanute AFB was diverted to Edwards AFB. Educational Objectives: With the emphasis on Commercial Crew Programs for Space flight it is important that all involved understand what is required to prepare for contingencies. Cost effective means of being prepared for contingencies are needed. Questions: 1. When should planning for nominal and contingency operations begin? 2. What type of training aids are needed for contingency operations? 3. Who were the major contributors to Shuttle contingency operations?

Chandler, Michael↗

The challenges of beam polarization and keV-scale centre-of-mass energy calibration at the FCC-ee

The capability to determine the FCC-ee centre-of-mass energies (ECM) at the ppm level using resonant depolarization of the beams is essential for the Z line shape measurements, the W mass and the possible observation of the Higgs boson s-channel production. A first analysis (Blondel A et al Polarization and centre-of-mass energy calibration at FCC-ee. demonstrated the feasibility of this programme, conditional to careful preparation and a number of further developments. The existing simulation codes must be unified; the analysis and design of the instrumentation must be developed; and a detailed planning must be developed for the simultaneous and coordinated operation of the accelerator, of the continuous polarization and depolarization measurements, and of the beam monitoring devices, ensuring a precise extrapolation from beam energies to centre-of-mass energy and energy spread.

43 PARTICLE ACCELERATORS↗

Robust and resilient coordination of feeders with uncertain distributed energy resources: from real-time control to long-term planning

To enable flexible demand and ensure reliable and economical operation of distribution systems, we present a novel hierarchical scheme that actively coordinates responsive behind-the-meter grid resources, including distributed energy resources (DERs), to reliably manage each unbalanced distribution feeder and exploits the available flexibility to economically optimize the entire network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

14 SOLAR ENERGY↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

A Human-in-the-Loop Evaluation of Multi-Sector Planning in Mixed Equipage Airspace (MSP III)

A human-in-the-loop (HITL) simulation was conducted in May 2010 to determine the feasibility and value 01 conducting multi-sector planning (MSP) operations in a mixed equipage environment. Aircraft were categorized as equipped or unequipped based on the presence or absence of an air-ground data communications (Data Comm) capability for receiving auto-loadable clearances and transfer of communication messages from the air navigation service provider (ANSP). The purpose of the study was to determine the feasibility and possible benefits of introducing multi-sector planning in a mixed equipage context, or whether Data Comm equipage was required for MSP operations. Each test scenario presented one of three different equipage levels to the controllers (10%, 50% or 90% equipped aircraft), so that the operational impact of different equipage levels could be observed. Operational feasibility assessment addressed two related questions: (1) are MSP operations feasible for unequipped aircraft, and (2) are they feasible in a mixed equipage context. Similarly, two categories of potential benefits were explored: (1) system performance improvements (e.g., throughput, workload) associated with MSP at different equipage levels, and (2) the possibility of providing differential service for equipage through MSP operations. Tool requirements (for both planning and controller stations), as well as planning and coordination procedures - within facility (traffic management unit/operational area) and within sector (R-Side/D-Side) - were two other topics addressed in the study. Overall, results suggested that MSP operations were feasible in a mixed equipage environment and that the tools were effective with both equipped and unequipped aircraft. Using the MSP tools, traffic management coordinators were able to manage controller task load, effectively balancing throughput with complexity and controller task load at each of the three equipage levels tested.

Smith, Nancy↗

Transmission-distribution long-term volt-var planning considering reactive power support capability of distributed PV

High penetration of grid-edge, inverter-based photovoltaic (PV) can cause significant voltage fluctuations not only at the distribution but also at the sub-transmission levels due to PV output intermittency. Traditional reactive power planning approaches do not consider intermittency, nor the possibility of coordinating the control of existing and future volt-ampere reactive resources. This paper proposes a reactive power planning tool for sub-transmission systems to mitigate voltage violations and fluctuations caused by high PV penetration and intermittency with a minimum investment cost. The planning tool coordinates with an optimization-based volt-var operational tool for: a) modeling the coordination of all existing var assets in both sub-transmission and distribution systems to reduce the need of new equipment, and b)selecting a set of scenarios with voltage violations, derived from PV intermittency c) testing the final investment decision. The tool obtains an investment need for each intermittency scenario with a proposed optimal power-flow framework with efficient techniques to handle a high number of discrete variables. Two options are provided for final planning decision: i) a conservative direct combination of investment need solutions and ii) a machine learning-based selection of representative investment needs at most time steps. The final investment decision options are verified using a realistic large-scale sub-transmission system and 5-minute PV and load data. The results show a significant voltage performance improvement with a lower investment cost for additional var equipment compared to conventional approaches.

14 SOLAR ENERGY↗

The SERENDIP piggyback SETI project

The SERENDIP project is an ongoing program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories. SERENDIP operates in a piggyback mode: it makes use of whatever observing plan (sequence of frequencies, sky coordinates, and polarizations) is under way at its host observatory. Moreover, the SERENDIP data acquisition system, once installed, operates autonomously. This approach makes it possible to obtain large amounts of high quality observing time in a manner that is economical and that does not adversely affect ongoing radio astronomy survey work. The SERENDIP II system has been installed at the NRAO 300-foot telescope at Green Bank, West Virginia, and has operated there for several thousand hours. In this report, we summarize our findings from these observations and describe the present status of the project. Two key elements of SERENDIP are the automated data acquisition system that uses adaptive thresholds and logs only statistically significant peaks in the real-time power spectra, and the subsequent off-line analysis programs that identify and reject a variety of interference signals. Several specific correlations have been identified that offer promise. At present, the development and testing of these interference rejection algorithms is the main thrust of our work.

NASA Discipline Number 52-60↗

X-ray Cryogenic Facility (XRCF) Handbook

The X-ray & Cryogenic Facility (XRCF) Handbook is a guide for planning operations at the facility. A summary of the capabilities, policies, and procedures is provided to enhance project coordination between the facility user and XRCF personnel. This handbook includes basic information that will enable the XRCF to effectively plan and support test activities. In addition, this handbook describes the facilities and systems available at the XRCF for supporting test operations. 1.2 General Facility Description The XRCF was built in 1989 to meet the stringent requirements associated with calibration of X-ray optics, instruments, and telescopes and was subsequently modified in 1999 & 2005 to perform the challenging cryogenic verification of Ultraviolet, Optical, and Infrared mirrors. These unique and premier specialty capabilities, coupled with its ability to meet multiple generic thermal vacuum test requirements for large payloads, make the XRCF the most versatile and adaptable space environmental test facility in the Agency. XRCF is also recognized as the newest, most cost effective, most highly utilized facility in the portfolio and as one of only five NASA facilities having unique capabilities. The XRCF is capable of supporting and has supported missions during all phases from technology development to flight verification. Programs/projects that have benefited from XRCF include Chandra, Solar X-ray Imager, Hinode, and James Webb Space Telescope. All test programs have been completed on-schedule and within budget and have experienced no delays due to facility readiness or failures. XRCF is currently supporting Strategic Astrophysics Technology Development for Cosmic Origins. Throughout the years, XRCF has partnered with and continues to maintain positive working relationships with organizations such as ATK, Ball Aerospace, Northrop Grumman Aerospace, Excelis (formerly Kodak/ITT), Smithsonian Astrophysical Observatory, Goddard Space Flight Center, University of Alabama Huntsville, and more.

XRCF↗

Enhancing Cassini Operations & Science Planning Tools

The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

science planning↗