Search NASASearch

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

US-UK fusion energy collaborations in the digital space

The US and UK share the vision for fusion as a vital part of the clean energy future. This vision is reflected in the respective national plans in the form of the Bold Decadal Vision for Commercial Fusion (BDV) in the US and the Spherical Tokamak for Energy Production (STEP) program in the UK. Digital tools such as simulation and control frameworks, design tools, AI/ML, high performance computing (HPC), and virtual reality (VR) will play an important role in developing, diagnosing, operating, and further improving burning-plasma-class fusion power plants. Therefore, a collaborative approach, involving both the public and private sectors, to developing these digital tools can accelerate the path to fusion energy commercialization. In this report we discuss previous and ongoing collaborations and opportunities to expand these collaborations into new areas. We conclude this report with near term actions and a vision of the collaboration to the Joint Coordinating Committee.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Cross-sectoral impact of emerging technologies on U.S. manufacturing resilience and competitiveness

Introducing new technologies in one energy-intensive industry can affect how other industries operate and stay resilient, yet these cross-sector interactions are often underappreciated in conventional technology roadmaps. In practice, industrial systems do not evolve in isolation. They are linked through shared upstream and downstream dependencies, such as electricity and fuel supply, critical materials, transportation networks, and enabling infrastructure. As a result, large-scale technology deployment in one sector can reshape resource availability, infrastructure demand, and operational risk in others. These interdependencies mean that technology deployment decisions in one sector can create unintended bottlenecks or cascading benefits in others. Here, this article argues that a cross-sector, system-of-systems perspective is essential for evaluating and scaling emerging technologies in energy-intensive industries. By framing industrial transformation as an interconnected systems challenge rather than a set of isolated sectoral decisions, the study highlights how interdependence shapes technology feasibility, adoption pathways, and resilience outcomes. The article illustrates how cross-sector linkages can amplify both risks and benefits, and it emphasizes the importance of integrated planning approaches that account for shared dependencies, cascading impacts, and co-optimization opportunities. Adopting this broader perspective can support more robust technology roadmaps, improve strategic coordination across industries, and strengthen the long-term resilience of the industrial sector as a whole.

Nain, Preeti [Oak Ridge National Laboratory (ORNL)

Development of a Multi-Robot System for Autonomous Inspection of Nuclear Waste Tank Pits

This paper introduces the overall design plan, development timeline, and preliminary progress of the Autonomous Pit Exploration System project. This project aims to develop an advanced multi-robot system for the efficient inspection of nuclear waste-storage tank pits. The project is structured into three phases: Phase 1 involves data collection and interface definition in collaboration with Hanford Site experts and university partners, focusing on tank riser geometry and hardware solutions. Phase 2 includes the selection of sensors and robot components, detailed mechanical design, and prototyping. Phase 3 integrates all components into a cohesive system managed by a master control package which also incorporates digital twin and surrogate models, and culminates in comprehensive testing and validation at a simulated tank pit at the Idaho National Laboratory. Additionally, the system’s communication design ensures coordinated operation through shared data, power, and control signals. For transportation and deployment, an electric vehicle (EV) is chosen to support the system for a full 10 h shift with better regulatory compliance for field deployment. A telescopic arm design is selected for its simple configuration and superior reach capability and controllability. Preliminary testing utilizes an educational robot to demonstrate the feasibility of splitting computational tasks between edge and cloud computers. Successful simultaneous localization and mapping (SLAM) tasks validate our distributed computing approach. More design considerations are also discussed, including radiation hardness assurance, SLAM performance, software transferability, and digital twinning strategies.

Nuclear waste management

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY

WHOLESCALE - Water & Hole Observations Leverage Effective Stress Calculations And Lessen Expenses (Final Technical Report 2020 - 2024)

The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).

15 GEOTHERMAL ENERGY

WRPS Hanford Update [Slides]

The purpose of this report is to coordinate with the staff from WRPS, the current contract holder for operations at the Hanford site to better inform design decisions for the Autonomous systems for Hanford waste tank handling project. The project goals are to support risk reduction associated with monitoring, inspection and mapping of Hanford tank underground pits and includes: 1. A pit mock-up demonstration of Idaho National Laboratory’s (INL) Autonomous Pit Exploration System (APES) technology, which has two configurations: A. The Autonomous Robotic Arm, which is a proposed collaboration with Florida International University (FIU) and has capabilities to visually inspect, monitor, map and conduct simple tool manipulation tasks in the tank pits, and B. The robotic crawler configuration, which has capabilities to deploy to the bottom of the pits and conduct closer and bottom-up visual inspections. 2. An Implementation Plan that identifies Hanford site-wide application of the INL remote robotics technologies to enhance the performance of the tank farm systems and the characterization of the waste they contain to mitigate risk and optimize the overall waste mission. 3. A first-of-a-kind environmental digital twin will be produced. Digital twins to date require permanently installed sensors in order to produce asset specific predictions. This project will use the intermittent signals during inspections from deployed sensors on robotic systems to produce the data sets used by AI/ML to enable predictions of issues on tanks.

42 - ENGINEERING

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

The Federal Radiological Monitoring and Assessment Center (FRMAC) is an operational center, available on request by the Department of Homeland Security (DHS) to respond to nuclear and radiological incidents as described in the National Response Framework (NRF). Under the Federal Interagency Operational Plan for Response and Recovery’s Nuclear/Radiological Annex, the U.S. Department of Energy (DOE) has the responsibility to maintain the operational readiness of the FRMAC during the emergency phase of an event. FRMAC is initially established and managed by the Nuclear Emergency Support Team (NEST) and serves as an interagency operations center with representatives from various federal, state, and local radiological response organizations. The purpose of the FRMAC is to assist state, local, tribal, and territorial governments (SLTT) in their mission to protect the health and well-being of their citizens with: • Verified radiation measurements. • Interpretations of radiation distributions based on Environmental Protection Agency (EPA), Food and Drug Administration (FDA), or local Protective Action Guidelines (PAGs). • Characterization of overall radiological conditions. Once a declaration to respond to a radiological emergency has been made, the National Nuclear Security Administration (NNSA) Headquarters will coordinate the response in consultation with the cognizant NNSA Regional Coordinating Office (RCO). Each of the eight RCOs maintain a 24-hour response capability for radiological emergencies that may occur in states served by its region. When a FRMAC is established, it operates under the parameters of the Incident Command System (ICS), as defined in the National Incident Management Systems (NIMS) construct. The Consequence Management Home Team (CMHT) will be activated immediately during normal business hours (Pacific Time Zone), and within two hours otherwise. The Consequence Management Response Team (CMRT) is prepared for deployment within six hours after activation. Along with the assets, FRMAC provides an operational framework for coordinating of all federal off-site radiological monitoring and assessment activities during a response to a radiological emergency to support the coordinating agency and SLTT governments. Potential radiological emergencies that fall within FRMAC vary widely in terms of the area affected, the nature of the contamination, and the scope of the government’s response. Detonation of a nuclear device, accidental release of radiation from a nuclear power plant, and a terrorist threat are just a few of the many possible scenarios FRMAC must be prepared to address. Through all this, supporting the state, local, and tribal organizations in the protection of the public remains the primary goal of the federal response.

54 ENVIRONMENTAL SCIENCES

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY

FERC order 2222 & DER policy and implementation report - January 2026

The January 2026 FERC 2222 Tracker Report provides an overview of the progress and challenges in the implementation of FERC Order 2222, emphasizing the critical need for state-level action to address gaps in DERA/EDC communication protocols. The report highlights the importance of reliable communication between electric distribution companies (EDCs) and DER aggregators (DERAs) for seamless market operations, noting the absence of specific directives from FERC and RTO/ISO compliance filings. Key discussions include the operational coordination required to manage DER operations within aggregated markets, the potential use of tools like DER Registries for efficient data exchange, and the implications of non-performance due to communication issues. While steps are being taken at the state level, such as ongoing policy development and bi-monthly webinars for stakeholder education, no states have fully developed coordination frameworks as of early 2026. The report underscores the growing role of states and local regulators in defining these protocols and ensuring effective coordination amidst the complex dynamics of distributed energy resources (DERs) integration into wholesale markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION

Transactive Energy Practices Survey

For nearly two decades, the idea of using market-based approaches in field deployments that coordinate the flexible operation of electricity customer assets has occupied the efforts of transactive energy practitioners. While the purported benefits of this distributed decision-making approach encourage transactive energy designs have been well explored, the practical aspects of implementing such a system to address real-world problems are just beginning to emerge. This report surveyed 24 field-deployed programs and interviewed experts instrumental in these deployments. The results of the survey and interviews reveal the diversity of designs and applications. They highlight the technical promise of the approaches as well as challenges with system integration, sustainable business strategy, and regulatory policy obstacles. Insights from the survey offer considerations to direct future effort and investment.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Facets of hydro power and future trends in a Nordic Context

Hydropower technologies bolster high penetration of variable renewable energies (VREs) in the net zero emissions scenarios. Nevertheless, there are various challenges to meeting the ambitious goal, such as stability, reliability, resiliency, security, lack of reactive power, voltage support and inertia, large-scale storage deployment and coordination, interconnectedness, demand-side response, higher thermal cycles with increased start/stops, and inadequate Levelized Cost of Energy (LCOE) for system-wise VRE integration and profitability. This survey conducts a bottom-up analysis to unveil the opportunities to utilize hydropower facilities and disentangle the nested problem for intertwining design features, control algorithms, operation, optimization approaches, incentives, services, and market mechanisms using a three-pillar framework perspective: grid owners, power producers, and machine designers. The survey identified emerging trends in real-time and capacity markets, flexible power systems, and enhanced grid capabilities, including advanced voltage support and updated grid codes. These developments present significant opportunities for hydropower, such as achieving super-flexibility through hybridization, expanded reactive power capabilities, and advanced operational modes like a synchronous condenser and power adequator functionalities. These opportunities require novel design philosophies — including new winding, stator, and rotor configurations, optimized ventilation, and active cooling systems — to enhance performance under stressed grid and climate conditions. Finally, integrating climate and energy models for multi-basin optimization with finer spatial and temporal granularity enhances the planning accuracy for water management of hydropower while addressing environmental challenges. The review delivers helpful prospective suggestions and tools that would serve researchers, power engineers, and stakeholders in making decisions about hydropower technologies and services in 2050 and beyond.

13 HYDRO ENERGY

Cybersecurity Incident Response Guide for Wind

As wind energy systems become increasingly digitized and interconnected, they face a growing array of cyber threats that can disrupt operations, compromise safety, and trigger cascading impacts across the energy ecosystem. The Wind Incident Response Guide provides a structured, wind-specific framework for preparing for, detecting, responding to, and recovering from cyber incidents. Drawing on lessons from field demonstrations, cyber-physical testbeds, and stakeholder engagement across the wind sector, this guide integrates technical, operational, and regulatory considerations to support asset owners, operators, and responders. It outlines key roles and responsibilities, maps incident response phases to wind-specific scenarios, and highlights applicable laws, regulations, standards, and best practices. By tailoring general cybersecurity principles to the unique architectures and operational constraints of wind systems—including remote access, legacy components, and environmental interfaces—this guide aims to enhance resilience, reduce response time, and support coordinated action across public and private stakeholders. It is intended as a practical resource for utilities, developers, regulators, and emergency managers working to secure the future of wind energy.

17 - WIND ENERGY

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)