Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Using social network and stakeholder analysis to help evaluate infectious waste management: A step towards a holistic assessment

Highlights: • Assessment of infectious waste management in Bangkok, in particular incineration. • Integration of social network and stakeholder analysis assessment methods. • Assessment of stakeholder characteristics, role, interaction and communication. • Interviewees self-evaluate their own characteristics and the system. • Non-technical aspects are important for system acceptability, and sustainability. - Abstract: Assessing the strengths and weaknesses of a solid waste management scheme requires an accurate analysis and integration of several determining features. In addition to the technical aspects, any such system shows a complex interaction of actors with varying stakes, decision-making power and influence, as well as a favourable or disabling environment. When capitalizing on the knowledge and experience from a specific case, it is also crucial that experts do not “forget” or underestimate the importance of such social determinants and that they are familiar with the methods and tools to assess them. Social network analysis (SNA) and stakeholder analysis (SA) methods can be successfully applied to better understand actors’ role and actions, analyse driving forces and existing coordination among stakeholders, as well as identify bottlenecks in communication which affect daily operations or strategic planning for the future way forward. SNA and SA, appropriately adjusted for a certain system, can provide a useful integration to methods by assessing other aspects to ensure a comprehensive picture of the situation. This paper describes how to integrate SNA and SA in order to survey a solid waste management system. This paper presents the results of an analysis of On-Nuch infectious waste incinerator in Bangkok, Thailand. Stakeholders were interviewed and asked to prioritize characteristics and relationships which they consider particularly important for system development and success of the scheme. In such a way, a large quantity of information about organization, communication between stakeholders and their perception about operation, environmental and health impact, and potential alternatives for the system was collected in a systematic way. The survey results suggest that stakeholders are generally satisfied with the system operation, though communication should be improved. Moreover, stakeholders should be strategically more involved in system development planning, according to their characteristics, to prevent negative reactions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Mongird, Kendall [Pacific Northwest National Labor↗

Waste Feed Delivery Planning at Hanford - 13232

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation: Preprint

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Underground test coordination at the waste isolation pilot plant - 15229

Underground test coordination is a critical component of safe and efficient conduct of testing operations in a working underground research laboratory (URL). This is particularly important when planning and implementing large, multi-organizational field-scale test programs, when the URL is co-located with an operating repository, or when the host facility, such as the Waste Isolation Pilot Plant (WIPP), is recovering from off-normal events. As such, the Department of Energy Carlsbad Field Office developed an Integrated Project Team (IPT) charter in late 2013 establishing the WIPP underground Test Coordination Office (TCO). The IPT was established to ensure that underground science activities are coordinated, implemented, and managed in an integrated, consistent, efficient, cost-effective, safe, and environmentally compliant manner that maintains quality assurance standards. This is done while ensuring testing operations do not interfere with the WIPP's primary mission, the disposal of transuranic (TRU) waste, and at present, the recovery of WIPP operations. This paper reports the current status of the WIPP underground science and testing programs within the framework of the WIPP stabilization and recovery activities and describes the role of the TCO for current activities as well as for the long-term success of an underground research laboratory. As a result of the underground fire and radiological incident of early February 2014, during this recent period of WIPP recovery, the TCO is ensuring the requirements of the scientific programs are met and that work activities are planned and implemented in compliance with enhanced work control processes and corrective actions imposed at WIPP. This paper addresses the impacts of the accidents at WIPP on the many science experiments that were in process when the events occurred. It presents the plans for their recovery in concert with WIPP's recovery plans, and summarizes the impacts of new underground processes and procedures that will be imposed on the science work as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Step for STEP (Siletz Tribal Energy Program)

The Siletz Tribal Energy Program (STEP), housed in the Tribe’s Planning Department, will hire a data entry coordinator to collect, enter, analyze and store all the current and future energy efficiency and renewable energy data pertaining to administrative structures the tribe owns and operates and for homes in which tribal members live. The proposed data entry coordinator will conduct an energy options analysis in collaboration with the rest of the Siletz Tribal Energy Program and Planning Department staff. An energy options analysis will result in a thorough understanding of tribal energy resources and consumption, if energy efficiency and conservation measures being implemented are having the desired effect, analysis of tribal energy loads (current and future energy consumption), and evaluation of local and commercial energy supply options. A literature search will also be conducted. In order to educate additional tribal members about renewable energy, we will send four tribal members to be trained to install and maintain solar panels, solar hot water heaters, wind turbines and/or micro-hydro.

14 SOLAR ENERGY↗

Water Power Technologies Office: 2021-2022 Accomplishments Report

The report details key performance goals for each of WPTO’s activity areas until 2025 and includes long-term, follow-on objectives through 2030. This report serves as a strategic vision and operational guide to help WPTO manage and coordinate its future activities and communicate its mission, goals, and plans. The Multi-Year Program Plan was an integral part of the 2022 Peer Review, providing reviewers insight and guidance on the office’s strategy to which WPTO-funded projects must align.

13 HYDRO ENERGY↗

Optimal Siting of EV Fleet Charging Station Considering EV Mobility and Microgrid Formation for Enhanced Grid Resilience

Coordinating infrastructure planning for transportation and the power grid is essential for enhanced reliability and resilience during operation and disaster management. This paper presents a two-stage stochastic model to optimize the location of electric vehicle fleet charging stations (FEVCSs) to enhance the resilience of a distribution network. The first stage of this model deals with the decision to place an FEVCS at the most favorable and optimized location, whereas the second stage aims to minimize the weighted sum of the value of lost load in multiple potential scenarios with different faults. Indeed, the second stage is a joint grid restoration scheme with network reconfiguration and microgrid formation using available distributed generators and fleet electric vehicles. The proposed model is tested on a modified IEEE-33 node distribution network and a four-node transportation network. Case studies demonstrate the effectiveness of the proposed model.

25 ENERGY STORAGE↗

Synopsis of NREL's Automated Mobility District (AMD) Research Program and Associated Publications

An automated mobility district (AMD) envisions a system of integrated mobility options that serves major activity centers such as campuses, central business districts, and large medical facilities. The National Renewable Energy Laboratory (NREL) has been investigating the implementation prospects for fully automated passenger transport systems that are deployed to operate within dense urban settings. This document provides a synopsis of findings revealed over the last three phases of work, which have yielded insights into the creation and management of AMDs anticipated to use automated vehicle (AV) technology over the next decade. Phase I and Phase II tracked the deployment and lessons learned from 10 early-stage demonstrations of automated shuttle deployments, and their associated insights into the challenges for automated driving systems to achieve safe operations within district-scale deployments. Phase III began in-depth investigations of critical subsystem components, as automation, electrification, and on-demand service continue to converge within initial AMD operations. These directed studies focus on elements of electrification, curbfront/station management, the role of infrastructure sensing, and overall integration of AMD safety management in central, simultaneous coordination of multiple AMD fleets. Future research in AMDs includes systems engineering methodology (more frequently referred to as "digital twins") for planning, design, testing, and ongoing operation of AMDs; location (or co-location) of management functions; and human supervision and passenger communications for safety and security in unattended vehicles. The synopsis references the foundational research products (papers and presentations) that have been published through conference proceedings, journal articles, and NREL reports.

33 ADVANCED PROPULSION SYSTEMS↗

Stop managing people, start managing agreements - 15081

One definition of management in business and organizations is: 'the function that coordinates the efforts of people to accomplish goals and objectives using available resources efficiently and effectively'. Unfortunately, what it takes to coordinate (literally, to create order together) is beyond the scope of today's management tools. The top five management tools in the world, according to a Bain 2013 survey, are: Strategic Planning; Customer Relationship Management; Employee Engagement Surveys; Benchmarking; and Balanced Scorecard. These are useful tools in business and organizations, but do not help managers coordinate the complex performance networks of agreements with resource providers, team members, and internal and external user-customers and authorities required to accomplish group or organizational goals. How do we manage such a network? While coordination is increasingly necessary in today's world of work, it is also a much neglected area of serious study because it is, almost literally, an invisible phenomenon. We can observe people inside groups, as well as their activities and results, but coordination is a product of managing what is going on between groups, not inside them. The challenge is making that in-between visible and actionable, not just 'white space'. A solution: define a Team's performance as agreements - and deliveries on the agreements - for products, services, and communications - the things moving between a Team and its immediate circle of resource providers, customers, and authorities relevant to a goal. This approach has been shown to reduce operational costs while also increasing team members' recognition of their interdependent responsibilities. Managers and Team leaders can then turn any Team goal into an opportunity for accomplishment in three steps: 1. Define 'performance' in terms of deliverable products, services, and communications for every goal; 2. Keep performance status current and visible to all team members; and 3. Debrief and update performance status routinely. Teamwork and engagement in goal accomplishment require a focus on Sender-Receiver agreements, productive communication, and timely and accurate status-tracking and feedback. Sustaining the context for accomplishment is not about managing people - it requires supporting coordination for the network of agreements in which people operate. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Gas-Electric Energy System Decarbonization Planning

As energy utilities implement climate change mitigation policies, system planners require strategies for achieving affordable emissions reductions. Coordinated planning of electric power and natural gas systems will allow synergistic investments to address cross-sector operational constraints, competing uses for net-zero emissions fuels, and shifts in energy demands across energy carriers. In this study, we develop a novel optimization program that finds the cost-minimizing mix of infrastructure expansion or reduction across gas and electric systems to satisfy sector-specific emissions constraints. Alongside energy supply resources, our framework allows for central-planning of end-use equipment stocks to allow switching between gas and electric appliances upon failure or premature replacement. The proposed model is used to simulate case study scenarios for a benchmark 24-pipe gas network coupled to a 24-node power system test network. We find that electrification of greater than 80% of core gas demands is a component of the least-cost solution for modeled energy systems. Despite this substitution, the gas system is maintained to service difficult-to-electrify customers and to deliver net-zero emissions gas to electricity generators in times of peak electricity demand. Restricting electrification of gas appliances increases reliance on power- to-gas technologies and increases annual costs by 15% in 2040. Neglecting constraints on pipeline blending of hydrogen can produce a misleading result that relies on hydrogen blend fractions of greater than 50%. In all cases, we find the average costs of delivered gas increase nearly 5-fold across the decarbonization transition, highlighting the importance of future work investigating cost-allocation strategies for ensuring an equitable energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of an Improvised Nuclear Device Detonation on Command and Control for Surrounding Regions at the Local, State and Federal Levels

This paper discusses command and control issues relating to the operation of Incident Command Posts (ICPs) and Emergency Operations Centers (EOCs) in the surrounding area jurisdictions following the detonation of an Improvised Nuclear Device (IND). Although many aspects of command and control will be similar to what is considered to be normal operations using the Incident Command System (ICS) and the National Incident Management System (NIMS), the IND response will require many new procedures and associations in order to design and implement a successful response. The scope of this white paper is to address the following questions: • Would the current command and control framework change in the face of an IND incident? • What would the management of operations look like as the event unfolded? • How do neighboring and/or affected jurisdictions coordinate with the state? • If the target area’s command and control infrastructure is destroyed or disabled, how could neighboring jurisdictions assist with command and control of the targeted jurisdiction? • How would public health and medical services fit into the command and control structure? • How can pre-planning and common policies improve coordination and response effectiveness? • Where can public health officials get federal guidance on radiation, contamination and other health and safety issues for IND response planning and operations?

command and control, Incident Command Post, ICP, E↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Reinforcements in the Central American Regional Power System

The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

power system interconnection↗

Strategy for distributed controller defence: Leveraging controller roles and control support groups to maintain or regain control in cyber-adversarial power systems

Distributed controllers play a prominent role in electric power grid operation. The coordinated failure or malfunction of these controllers is a serious threat, where the resulting mechanisms and consequences are not yet well-known and planned against. If certain controllers are maliciously compromised by an adversary, they can be manipulated to drive the system to an unsafe state. The authors present a strategy for distributed controller defence (SDCD) for improved grid tolerance under conditions of distributed controller compromise. The work of the authors’ first formalises the roles that distributed controllers play and their control support groups using controllability analysis techniques. With these formally defined roles and groups, the authors then present defence strategies for maintaining or regaining system control during such an attack. A general control response framework is presented here for the compromise or failure of distributed controllers using the remaining, operational set. The SDCD approach is successfully demonstrated with a 7-bus system and the IEEE 118-bus system for single and coordinated distributed controller compromise; the results indicate that SDCD is able to significantly reduce system stress and mitigate compromise consequences.

97 MATHEMATICS AND COMPUTING↗

Impacts of Climate Change, Policy and Water-Energy-Food Nexus on Hydropower Development

Hydropower plays an important role as the global energy system moves towards a less carbon-intensive and sustainable future as promoted under the Sustainable Development Goals (SDGs). This article provides a systematic review of the impacts from policy, climate change and Water-Energy-Food (W-E-F) nexus on hydropower development at global scale. Asia, Africa and Latin America are hotspots promoting hydropower development with capacity expansion, while Europe and North America focus on performance improvement and environment impacts mitigation. Climate change is projected to improve gross hydropower potential at high latitude of North Hemisphere and tropical Africa and decrease that in the US, South Africa and south and central Europe. Analysis from W-E-F nexus highlights the importance of integrated approaches as well as cross-sectoral coordination so as to improve resources use efficiency and achieve sustainable hydropower development. These three factors together shape the future of hydropower and need to be considered for planning and operation purpose.

Zhang, Xiao↗

Waste feed delivery planning at Hanford

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗