Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fuel cell systems for First Lunar Outpost-reactant storage option

The office of Space, DOE, appointed a Lunar Surface Power Working Group to review candidate systems for the First Lunar Outpost habitat. The working group met for a total of five days in the fall of 1992 and concluded that the candidate involving a photovoltaic unit, a fuel cell, a regenerator to recycle the reactants, and storage of oxygen and hydrogen gases was the most attractive for this application. Most of the volume (97 percent) and weight (63 percent) are taken up by the reactants and their storage tanks. Therefore, in my work for the Group, and in this report, I have concentrated on finding ways to reduce these volumes and weights. Three options were considered: (1) the baseline case considered in the preliminary system design, that of separate high pressure (200 bar) storage tanks; (2) the use of two of the descent storage propellant tanks wrapped with graphite fibers to increase the pressure capability; and (3) the use of cryogenic storage of reactants in the propellant tanks. The first option results in high storage tank mass and volume. The second option saves 90 percent of the volume by making use of the propellant tanks, but it has little if any weight advantages; the weight saved by not providing extra tanks for reactant storage is nearly entirely added back by the weight of the additional material (graphite fibers) to strengthen the propellant tanks. Use of the descent storage propellant tanks for storage of the fuel cell reactants as cryogenic liquids requires a gas liquefaction system. The weight of this system is expected to be less than that of the storage tanks but it would require development and testing to prove its reliability. The solar array would have to be 40 percent larger and the heat projection range would be 170 percent larger than for storage of reactants as high pressure gases. For a high power system (greater than 20 kW) the larger energy storage requirement would probably favor the cryogenic storage option.

Nelson, P. A.↗

Options for flight testing rocket-based combined-cycle (RBCC) engines

While NASA's current next-generation launch vehicle research has largely focused on advanced all-rocket single-stage-to-orbit vehicles (i.e. the X-33 and it's RLV operational follow-on), some attention is being given to advanced propulsion concepts suitable for 'next-generation-and-a-half' vehicles. Rocket-based combined-cycle (RBCC) engines combining rocket and airbreathing elements are one candidate concept. Preliminary RBCC engine development was undertaken by the United States in the 1960's. However, additional ground and flight research is required to bring the engine to technological maturity. This paper presents two options for flight testing early versions of the RBCC ejector scramjet engine. The first option mounts a single RBCC engine module to the X-34 air-launched technology testbed for test flights up to about Mach 6.4. The second option links RBCC engine testing to the simultaneous development of a small-payload (220 lb.) two-stage-to-orbit operational vehicle in the Bantam payload class. This launcher/testbed concept has been dubbed the W vehicle. The W vehicle can also serve as an early ejector ramjet RBCC launcher (albeit at a lower payload). To complement current RBCC ground testing efforts, both flight test engines will use earth-storable propellants for their RBCC rocket primaries and hydrocarbon fuel for their airbreathing modes. Performance and vehicle sizing results are presented for both options.

Olds, John↗

A Comparison of Fission Power System Options for Lunar and Mars Surface Applications

This paper presents a comparison of reactor and power conversion design options for 50 kWe class lunar and Mars surface power applications with scaling from 25 to 200 kWe. Design concepts and integration approaches are provided for three reactor-converter combinations: gas-cooled Brayton, liquid-metal Stirling, and liquid-metal thermoelectric. The study examines the mass and performance of low temperature, stainless steel based reactors and higher temperature refractory reactors. The preferred system implementation approach uses crew-assisted assembly and in-situ radiation shielding via installation of the reactor in an excavated hole. As an alternative, self-deployable system concepts that use earth-delivered, on-board radiation shielding are evaluated. The analyses indicate that among the 50 kWe stainless steel reactor options, the liquid-metal Stirling system provides the lowest mass at about 5300 kg followed by the gas-cooled Brayton at 5700 kg and the liquid-metal thermoelectric at 8400 kg. The use of a higher temperature, refractory reactor favors the gas-cooled Brayton option with a system mass of about 4200 kg as compared to the Stirling and thermoelectric options at 4700 and 5600 kg, respectively. The self-deployed concepts with on-board shielding result in a factor of two system mass increase as compared to the in-situ shielded concepts.

Mason, Lee S.↗

Tool for Ranking Research Options

Tool for Research Enhancement Decision Support (TREDS) is a computer program developed to assist managers in ranking options for research aboard the International Space Station (ISS). It could likely also be adapted to perform similar decision-support functions in industrial and academic settings. TREDS provides a ranking of the options, based on a quantifiable assessment of all the relevant programmatic decision factors of benefit, cost, and risk. The computation of the benefit for each option is based on a figure of merit (FOM) for ISS research capacity that incorporates both quantitative and qualitative inputs. Qualitative inputs are gathered and partly quantified by use of the time-tested analytical hierarchical process and used to set weighting factors in the FOM corresponding to priorities determined by the cognizant decision maker(s). Then by use of algorithms developed specifically for this application, TREDS adjusts the projected benefit for each option on the basis of levels of technical implementation, cost, and schedule risk. Based partly on Excel spreadsheets, TREDS provides screens for entering cost, benefit, and risk information. Drop-down boxes are provided for entry of qualitative information. TREDS produces graphical output in multiple formats that can be tailored by users.

Ortiz, James N.↗

Ground Vibration Testing Options for Space Launch Vehicles

New NASA launch vehicles will require development of robust systems in a fiscally-constrained environment. NASA, Department of Defense (DoD), and commercial space companies routinely conduct ground vibration tests as an essential part of math model validation and launch vehicle certification. Although ground vibration testing must be a part of the integrated test planning process, more affordable approaches must also be considered. A study evaluated several ground vibration test options for the NASA Constellation Program flight test vehicles, Orion-1 and Orion-2, which concluded that more affordable ground vibration test options are available. The motivation for ground vibration testing is supported by historical examples from NASA and DoD. The approach used in the present study employed surveys of ground vibration test subject-matter experts that provided data to qualitatively rank six test options. Twenty-five experts from NASA, DoD, and industry provided scoring and comments for this study. The current study determined that both element-level modal tests and integrated vehicle modal tests have technical merits. Both have been successful in validating structural dynamic math models of launch vehicles. However, element-level testing has less overall cost and schedule risk as compared to integrated vehicle testing. Future NASA launch vehicle development programs should anticipate that some structural dynamics testing will be necessary. Analysis alone will be inadequate to certify a crew-capable launch vehicle. At a minimum, component and element structural dynamic tests are recommended for new vehicle elements. Three viable structural dynamic test options were identified. Modal testing of the new vehicle elements and an integrated vehicle test on the mobile launcher provided the optimal trade between technical, cost, and schedule.

Patterson, Alan↗

International Space Station (ISS) External Thermal Control System (ETCS) Loop A Pump Module (PM) Jettison Options Assessment

On December 11, 2013, the International Space Station (ISS) experienced a failure of the External Thermal Control System (ETCS) Loop A Pump Module (PM). To minimize the number of extravehicular activities (EVA) required to replace the PM, jettisoning the faulty pump was evaluated. The objective of this study was to independently evaluate the jettison options considered by the ISS Trajectory Operations Officer (TOPO) and to provide recommendations for safe jettison of the ETCS Loop A PM. The simulation selected to evaluate the TOPO options was the NASA Engineering and Safety Center's (NESC) version of Program to Optimize Simulated Trajectories II (POST2) developed to support another NESC assessment. The objective of the jettison analysis was twofold: (1) to independently verify TOPO posigrade and retrograde jettison results, and (2) to determine jettison guidelines based on additional sensitivity, trade study, and Monte Carlo (MC) analysis that would prevent PM recontact. Recontact in this study designates a propagated PM trajectory that comes within 500 m of the ISS propagated trajectory. An additional simulation using Systems Tool Kit (STK) was run for independent verification of the POST2 simulation results. Ultimately, the ISS Program removed the PM jettison option from consideration. However, prior to the Program decision, the retrograde jettison option remained part of the EVA contingency plan. The jettison analysis presented showed that, in addition to separation velocity/direction and the atmosphere conditions, the key variables in determining the time to recontact the ISS is highly dependent on the ballistic number (BN) difference between the object being jettisoned and the ISS.

Murri, Daniel G.↗

Demonstrating Early-Adopter Benefits of Submitting Multiple Trajectory Options for Airlines

A workshop at NASA Ames Research Center was held with airline industry stakeholders to demonstrate the impact of using Trajectory Options Sets (TOSs) during a Collaborative Trajectory Options Program (CTOP) for severe weather operations. The demonstration was conducted using apart-task Human-in-the-Loop (HITL) simulation of the Integrated Demand Management (IDM) concept, which is an air traffic management method that uses CTOP to deliver preconditioned traffic to the Time-Based Flow Management (TBFM) region. The demonstration addressed the following research objectives: first, determine who receives a greater benefit, TOS-participating or TOS-excluded airlines? Second, determine which method of trajectory selection yields a better solution, human/manual selection or automation? Finally, obtain feedback from stakeholders on their impression of the concept and recommendations for future work. The results showed that TOS-participating airlines received greater benefit in terms of total ground delay, ground delay savings, number of reroute options, and additional flight time, compared to TOS-excluded airlines. However, this result was dependent on the situational context, such as the number and location of flights. We found that all airlines benefitted when just a subset of airlines submitted TOS, but the greatest benefit went to the TOS-participating airlines. These benefits to the TOS-participating airlines were diminished as the number of TOS-participants in the system increased. Therefore, there was an “early-adopter” effect that suggested airlines could benefit by becoming the first to equip TOS without causing unfair disadvantages to those who do not equip TOS. In addition, we found that manual selection of trajectory options performed similarly to CTOP, but the CTOP solution was more efficient in terms of number of reroutes, additional flight time, and average ground delay for rerouted flights. Feedback from the stakeholders was solicited, and their overall impressions of the demonstrations were positive. They remarked that CTOP could do a better job than current day solutions, and they thought airlines could benefit from continuing to develop TOS capabilities.

Integrated Demand Management↗

Using the Decision Tree (DT) to Help Scientists Navigate the Access to Space (ATS) Options

Abstract – The Decision Tree (DT) is a tool that uses a tree-like model of decisions and their possible consequences, including outcomes, costs, schedule, risks, and performance. The paper applies the decision tree tool to the Access To Space (ATS) options to help scientists and small sat teams select the best approach that meets their ATS requirements. The ATS DT has three primary branches: rideshare, hosted payloads, and dedicated launch vehicles. Each of these branches has multiple sub-branches of ATS options. This paper describes the ATS options and provides industry contacts for each ATS option.

Rideshare↗

Design and Comparison of Lunar Sample Return Options

Returning lunar samples to earth is a high priority for NASA in order to better understand Lunar Geology, Lunar formation, and potential resource utilization. Core samples of frozen volatiles from permanently shadowed regions are sought after, but require intensive cryogenic cooling to preserve. Returning samples to Earth using the Orion capsule is restrictive for moderate amounts of mass/volume and thus alternate means of transport are investigated in this paper. The trade-space of potential options includes varying: sample mass amount, sample containment conditions, transfer path from Lunar surface to Earth surface, and various vehicle system trades. An integrated solver is applied with parametric estimators and known system heuristics to effectively estimate size, mass, and power of various subsystems. Modeled subsystems include sample containment, EDL technologies(heat shield, parachute, recovery), power, thermal, avionics, structures, and propulsive systems. Transfer path options include various trajectory options, transfer methods, staging points, and vehicle staging options. A Design of Experiments was conducted to explore the tradespace, to identify sensitivities, and to identify promising designs. Results are detailed for various stakeholder objectives including total mass, sample mass, science return, architecture impacts, and operational flexibility.

Lunar outpost↗

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at ~3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching ~4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid’s diameter at 60 ± 7 m. Studies of 2024 YR 4 ’s potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. Here, we cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid deflection↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Electrochemical Salt Wasteform Development: A Review of Salt Treatment and Immobilization Options

Electrochemical reprocessing, also referred to as pyroprocessing, is a technique for recycling actinides from used nuclear fuel (UNF) to produce fuel for future reactors. Here, UNF is dissolved in a molten salt (e.g., LiCl-KCl eutectic) within an electrorefiner. After UNF dissolution, fission products are released into the electrolyte salt and converted to chlorides. This paper discusses wasteform options for processing the base electrolyte salt with the fission product salts as well as just the rare-earth fission products (as RECl 3 , REOCl, or REO x ) with the intent of finding optimal methods for reducing total waste salt volumes or partitioning the salt for alternate wasteform options. Furthermore, two of the more detailed partitioning options discussed herein include halide removal from the salt (dehalogenation), which accounts for more than half of the salt on a molar basis, and RE fission product removal for wasteforms with high-RE loadings. Wasteform properties are compared with emphasis on wasteform volume starting from a given amount of (1) total salt cations or (2) RE cations. Comparisons are also made of wasteform chemical durabilities, with the data available from like testing methods. A main conclusion from this work is the justification of subsequent salt processing after electrorefiner operations for achieving significant wasteform volume reduction.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

A Design and Fabrication Options Trade Study for Metallic Fuel without Internal Sodium Bonding

Nuclear fuels using alloys of uranium, or metallic fuels, have many beneficial properties. The classical metallic fuel design uses a loose fitting cylindrical “slug” of fuel placed inside stainless-steel cladding tubes where the gap is filled with sodium. This sodium bond is liquid at operating temperature and conducts heat from the slug to the cladding, especially in early life before fuel swells into contact with the cladding. Despite the benefits of sodium bonding, there is a desire to develop metallic fuel technologies without it chiefly to reduce chemical reaction hazards in spent fuel storage from sodium fast reactors operating on once-through fuel cycles. Elimination of the sodium bond may also help unlock potential benefits for fuel fabrication, reactor neutronics, and compatibility with other types of reactors. Creating a sodium-free metallic fuel revolves around the problem of manufacturing fuel slug geometries which are in close contact with the cladding at beginning of life to facilitate heat transport while alleviating fuel-cladding chemical interactions (FCCI) at this interface and providing enough free volume to accommodate fuel swelling. Accelerating development and qualification of this fuel system will require careful selection of design and manufacturing options. To this end, a design trade-off study was performed to evaluate candidate options. Several design and manufacturing options were assessed, weighted, scored, and ranked with respect to fabrication, normal reactor operation, off-normal scenarios, and back-end considerations. This effort was performed both for “baseline” needs, which represented a once-through fuel cycle at temperatures and burnups known to be viable for sodium-bonded metallic fuel, and for “enhanced” needs to represent opportunities for closed fuel cycles and/or more aggressive temperatures/burnups. The outcomes of this study prioritized a baseline technology using U-Zr alloy with additives to mitigate FCCI, produced in annular slug geometry by continuous casting, clad in austenitic stainless-steel alloy, and followed by a final step to swage the cladding down to close the gap. This study prioritized an enhanced fuel technology using U-Mo alloy, also produced by continuous casting into an annular geometry, followed by coating/plating with an FCCI barrier on the slug, again with a final step to swage the cladding diameter down using oxide dispersion strengthened steel. It was noted that development of the enhanced fuel technology would entail more risk, thus U-Zr alloy was put forth as a backup to U-Mo if challenges are encountered with FCCI barriers, and advanced ferritic/martensitic steels are put forth as a backup to oxide dispersion strengthened steels if swaging and welding are found unworkable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Polaris-PARCS Sensitivity Study on LWR Fuel Cycles: Polaris Input Options

This study is the first of a multi-phase effort to assess the sensitivity of light-water reactor (LWR) core-level prediction biases to changes in lattice-level calculation parameters. Prediction bias is the measured-to-predicted difference in a core-level quantity of interest (QOI) which can be estimated by comparing the simulation results with the plant-measured data for key nuclear parameters. The LWR two-step neutronics codes employed herein are the SCALE–Polaris lattice physics code (v6.3.1) and the Purdue Advanced Reactor Core Simulator (PARCS) nodal diffusion simulator (v3.4.2), both funded and used for confirmatory analysis to support licensing by the US Nuclear Regulatory Commission (NRC). Polaris–PARCS is used to model Watts Bar Unit 1 cycles 1–3 and Peach Bottom Unit 2 cycles 1–3. This study focuses on the impact of changes to Polaris input options such as scattering treatment or quadrature settings and how these input options induce changes in core-level quantities of interest (QOIs)bias. The report documents multiple bias assessments for different modeling choices and compares the bias magnitude to the QOI measurement uncertainties. Future companion reports will investigate the sensitivity of core-level LWR prediction bias to Polaris input options and Polaris-computed QOIs such as few-group assembly-homogenized cross sections to gain an understanding of the key drivers of prediction bias at lattice and core levels for application of a two-step LWR neutronics procedure in a licensing scenario.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DMTN-107: Options for Alert Production in LSST Operations Year 1

This document reviews five options for alert production in LSST Operations Year 1 (LOY1), taking into account any implications on LSST formal requirements including up-scopes, down-scopes or explicit violations. The Data Management System Science Team's preferred option for maximizing LSST science is to generate template images from as much of the data from the commissioning and/or science verification phases as possible and use them to run Difference Image Analysis and alert production during LOY1. A proposal to increase the sky area covered during commissioning via a "filler" scheduler program is also presented. As a potential moderate up-scope, this study presents an option to build interim templates on a $\sim$monthly basis during LOY1, which could increase the accessible sky area by ~1000-2000 deg**2 per month, and should be reconsidered closer to the start of Operations.

79 ASTRONOMY AND ASTROPHYSICS↗

SEATSAT programs option analysis

A preliminary analysis of the costs of SEASAT follow-on options is presented. All the options assume the existence of SEASAT-A as currently defined in the SEASAT Economic Assessment. It is assumed that each option will continue through the year 2000 and approach operational system status in the 1983-1986 period, depending upon the sensor package selected. The launch vehicle assumed through 1983 is the Atlas Agena. After 1983, it is assumed SEASAT-A will switch to the use of the Space Shuttle. All cost estimates are 1976 dollars for fiscal year cost accounting, with no inflation rate included.

Luckl, L.↗