Search NASA⌕ Search

SEARCH · Search NASA

Results for “Outage schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

58 records · Page 4

Technical Assessment of the Application of Digital Twin and Prognostic Tools for Condition Monitoring

This report was prepared for the U.S. Nuclear Regulatory Commission (NRC) to present use cases of the application of advanced technologies toward meeting the current and future regulatory requirements for maintenance and condition monitoring of structures, systems, and components (SSCs). The advanced technologies considered in this work, collectively referred to as digital twin (DT) technologies, are advanced sensors and instrumentation, data analytics, machine learning and artificial intelligence (ML/AI), and physics-based models. The report presents two use cases of reactor coolant pumps (RCPs) and heat pipes in nuclear power plants (NPPs) with technical and regulatory considerations and opportunities in using advanced technologies for conditional monitoring. Key findings from the exploration of these considerations are as follows: - Uncertainties in sensor data and model predictions must be rigorously addressed through validation and verification processes - Regulatory compliance is paramount, necessitating data driven models to be developed in line with existing codes and standards, as well as considering potential future guidelines for advanced reactors - Explainability and transparency in ML/AI models are essential for developing operator trust and regulatory review, including methods that enhance the interpretability of complex data-driven predictions - Condition monitoring programs must be evaluated for their effectiveness in reducing maintenance-preventable function failures (MPFF) and aligning with plant performance criteria - The deployment of advanced technologies for condition monitoring could lead to a transition from periodic to continuous monitoring, thereby optimizing maintenance schedules - Collaborative efforts between industry stakeholders, regulatory bodies, and technology developers are crucial for the successful adoption of advanced technologies for condition monitoring systems in nuclear facilities In summary, the introduction of advanced technologies into condition monitoring programs represents a significant leap forward in the domain of NPP maintenance. By harnessing the capabilities of advanced sensors, data analytics, and ML/AI, NPP operators can transition from a time-based to a condition-based maintenance approach. This shift can potentially enhance the reliability and safety of critical plant components while optimizing maintenance efforts and minimizing unnecessary outages. The NRC is continuing to explore the regulatory aspects of advanced technologies as part of inservice inspection and inservice testing (ISI and IST) programs by pursuing additional research in this technical area.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimization of Second Fault Detection Thresholds to Maximize Mission POS

In order to support manned spaceflight safety requirements, the Space Launch System (SLS) has defined program-level requirements for key systems to ensure successful operation under single fault conditions. To accommodate this with regards to Navigation, the SLS utilizes an internally redundant Inertial Navigation System (INS) with built-in capability to detect, isolate, and recover from first failure conditions and still maintain adherence to performance requirements. The unit utilizes multiple hardware- and software-level techniques to enable detection, isolation, and recovery from these events in terms of its built-in Fault Detection, Isolation, and Recovery (FDIR) algorithms. Successful operation is defined in terms of sufficient navigation accuracy at insertion while operating under worst case single sensor outages (gyroscope and accelerometer faults at launch). In addition to first fault detection and recovery, the SLS program has also levied requirements relating to the capability of the INS to detect a second fault, tracking any unacceptable uncertainty in knowledge of the vehicle's state. This detection functionality is required in order to feed abort analysis and ensure crew safety. Increases in navigation state error and sensor faults can drive the vehicle outside of its operational as-designed environments and outside of its performance envelope causing loss of mission, or worse, loss of crew. The criteria for operation under second faults allows for a larger set of achievable missions in terms of potential fault conditions, due to the INS operating at the edge of its capability. As this performance is defined and controlled at the vehicle level, it allows for the use of system level margins to increase probability of mission success on the operational edges of the design space. Due to the implications of the vehicle response to abort conditions (such as a potentially failed INS), it is important to consider a wide range of failure scenarios in terms of both magnitude and time. As such, the Navigation team is taking advantage of the INS's capability to schedule and change fault detection thresholds in flight. These values are optimized along a nominal trajectory in order to maximize probability of mission success, and reducing the probability of false positives (defined as when the INS would report a second fault condition resulting in loss of mission, but the vehicle would still meet insertion requirements within system-level margins). This paper will describe an optimization approach using Genetic Algorithms to tune the threshold parameters to maximize vehicle resilience to second fault events as a function of potential fault magnitude and time of fault over an ascent mission profile. The analysis approach, and performance assessment of the results will be presented to demonstrate the applicability of this process to second fault detection to maximize mission probability of success.

Anzalone, Evan↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗