Search NASA⌕ Search

SEARCH · Search NASA

Results for “PEP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

High-Current Effects in the PEP-II Storage Ring

The PEP-II B-Factory operated at peak and integrated luminosity several times the original design values. Its storage rings operated at world-record beam currents with bunch lengths of about 10 mm. Correspondingly significant heat load was imposed on the vacuum system, both due to synchrotron radiation and by energy loss into higher-order modes. The latter in turn would lead to local heating or discharges wherever such energy got absorbed. Over the course of PEP-II running we experienced numerous such effects, which lead to upgrade programs of significant scope. In the following we will describe the most significant of such effects and their mitigation: (1) Upgrades and repairs of RF seals and shields in both rings; (2) Redesign of overheating stripline kicker electrodes to withstand higher powers; and (3) Redesign and replacement of BPM buttons following failure.

43 PARTICLE ACCELERATORS↗

Experiments on Electron Cloud Mitigation at PEP-II

The electron cloud effect has been observed at many accelerator facilities. It has been the subject of many workshops and reviews. An electron cloud is formed when low energy photoelectrons released from the vacuum chamber surfaces and ionized residual gas molecules, driven by the beam fields of passing positively charged bunches, impinge on the chamber walls and create secondary emission. It is an important issue for many currently operating facilities and the damping rings of the proposed International Linear Collider (ILC) because beam-cloud interaction can severely impact the machines performance. Systematic studies on the electron cloud effect, and its possible remedies, have been carried out in many laboratories. At SLAC, the effort has been concentrated on theoretical understanding with the aid of computer simulations, and experimental measurements with high intensity positron beams at PEP-II. Computer simulation results have been presented at ECLOUD07 and in an earlier article in this journal. In this article, we present recent results from electron cloud experiments at the positron storage ring of PEP-II. In particular, we discuss the performance of various mitigation techniques.

43 PARTICLE ACCELERATORS↗

The Herschel* PEP-HERMES Luminosity Function- I. Probing the Evolution of PACS Selected Galaxies to z approx. equal to 4

We exploit the deep and extended far-IR data sets (at 70, 100 and 160 μm) of the Herschel Guaranteed Time Observation (GTO) PACS Evolutionary Probe (PEP) Survey, in combination with the Herschel Multi-tiered Extragalactic Survey data at 250, 350 and 500 μm, to derive the evolution of the rest-frame 35-, 60-, 90- and total infrared (IR) luminosity functions (LFs) up to z ∼ 4.We detect very strong luminosity evolution for the total IR LF (LIR ∝ (1 + z)(sup 3.55 +/- 0.10) up to z ∼ 2, and ∝ (1 + z)(sup 1.62 +/- 0.51) at 2 less than z less than approximately 4) combined with a density evolution (∝ (1 + z)(sup −0.57 +/- 0.22) up to z ∼ 1 and ∝ (1 + z)(sup −3.92 +/- 0.34) at 1 less than z less than approximately 4). In agreement with previous findings, the IR luminosity density (ρIR) increases steeply to z ∼ 1, then flattens between z ∼ 1 and z ∼ 3 to decrease at z greater than approximately 3. Galaxies with different spectral energy distributions, masses and specific star formation rates (SFRs) evolve in very different ways and this large and deep statistical sample is the first one allowing us to separately study the different evolutionary behaviours of the individual IR populations contributing to ρIR. Galaxies occupying the well-established SFR-stellar mass main sequence (MS) are found to dominate both the total IR LF and ρIR at all redshifts, with the contribution from off-MS sources (≥0.6 dex above MS) being nearly constant (∼20 per cent of the total ρIR) and showing no significant signs of increase with increasing z over the whole 0.8 < z <2.2 range. Sources with mass in the range 10 ≤ log(M/solar mass) ≤ 11 are found to dominate the total IR LF, with more massive galaxies prevailing at the bright end of the high-z (greater than approximately 2) LF. A two-fold evolutionary scheme for IR galaxies is envisaged: on the one hand, a starburst-dominated phase in which the Super Massive Black Holes (SMBH) grows and is obscured by dust (possibly triggered by a major merging event), is followed by an AGN-dominated phase, then evolving towards a local elliptical. On the other hand, moderately star-forming galaxies containing a low-luminosity AGN have various properties suggesting they are good candidates for systems in a transition phase preceding the formation of steady spiral galaxies.

Herschel↗

High Power Testing of RF Cavities for the PEP II B Factory

We describe the process of conditioning and high-power testing of RF cavities for PEP-II. Procedures for vacuum assembly, bakeout and automated processing are described. Interlocks and safety precautions for protection of equipment and personnel are discussed and performance data of tested cavity assemblies are reported. Performance of ancillary components such as windows, couplers and tuners is also discussed. Comments are included on handling, alignment, installation and commissioning issues where appropriate.

43 PARTICLE ACCELERATORS↗

Fabrication Processes for the PEP II RF Cavities

This paper presents the major steps used in the fabrication of the 26 RF Cavities required for the PEP-II B-factory. Several unique applications of conventional processes have been developed and successfully implemented: electron beam welding (EBW), with minimal porosity, of .75 inch (19 mm) copper cross-sections; extensive 5-axis milling of water channels; electroplating of .37 inch (10 mm) thick OFE copper; tuning of the cavity by profiling beam noses prior to final joining with the cavity body; and machining of the cavity interior, are described here.

43 PARTICLE ACCELERATORS↗

Arc Detection and Interlock Module for the PEP II Low Level RF System

A new arc detection and interlock generating module for the SLAC PEP-II low-level RF VXI-based system has been developed. The system is required to turn off the RF drive and high voltage power supply in the event of arcing in the cavity windows, klystron window, or circulator. Infrared photodiodes receive arc signals through radiation resistant optical fibers. Gain and bandwidth are selectable for each channel to allow tailoring response. The module also responds to interlock requests from other modules in the VXI system and communicates with the programmable logic controller (PLC) responsible for much of the low-level RF system's interlock functionality.

43 PARTICLE ACCELERATORS↗

Gap Voltage Feed Forward Board for PEP II Low Level RF System

This paper describes the Gap Voltage Feed-Forward VXI module used in the PEP-II Low Level RF System. This module produces adaptively generated inphase (I) and quadrature (Q) reference signals for a single RF station based on measurements of periodic (1-turn) beam induced cavity transients caused by the presence of an ion clearing gap. In addition the module receives a fiber optically transmitted, bandlimited 'kic' signal from the longitudinal feedback system which is used to phase modulate the RF drive. This allows the RF system to act as a 'subwoofer' for the longitudinal feedback system for low order coupled-bunch instabilities driven by the fundamental mode of the accelerating cavities. The module includes hardware for remote measurement and adjustment of the 'kick' transfer function.

43 PARTICLE ACCELERATORS↗

Commissioning the 90 Degree Lattice for the PEP II High Energy Ring

In order to benefit from further reduction of the vertical IP beta function of the PEP-II high energy ring (HER) the bunch length should be reduced. This will be achieved by changing the phase advance from 60 degree to 90 degree in the four arcs not adjacent to the IR region, thus reducing momentum compaction by about 30% and reducing bunch length from a present 12 mm down to 8.5 mm at low beam current. In preparation to implement the 90 degree lattice the main HER quadrupole and sextupole strings and their power supplies have been reconfigured. The synchrotron tune initially will be lower but can be brought back by raising the rf voltage. Beam emittance is held at 48 nmr by introducing a significant dispersion beat in the arcs. The lattice was successfully commissioned at currents up to 800 mA in August 2007. In this paper we will compare the actual machine with the predicted behaviour, explain the correction strategies used and give an overall assessment of the operation and the benefit of the new lattice configuration.

43 PARTICLE ACCELERATORS↗

Experimental Measurements of the Secondary Electron Yield in the Experimental Measurement of the Secondary Electron Yield in the PEP-II Particle Accelerator Beam Line

Beam instability caused by the electron cloud has been observed in positron and proton storage rings and it is expected to be a limiting factor in the performance of the positron Damping Ring (DR) of future Linear Colliders (LC) such as ILC and CLIC. To test a series of promising possible electron cloud mitigation techniques as surface coatings and grooves, in the Positron Low Energy Ring (LER) of the PEP-II accelerator, we have installed several test vacuum chambers including (i) a special chamber to monitor the variation of the secondary electron yield of technical surface materials and coatings under the effect of ion, electron and photon conditioning in situ in the beam line; (ii) chambers with grooves in a straight magnetic-free section; and (iii) coated chambers in a dedicated newly installed 4-magnet chicane to study mitigations in a magnetic field region. In this paper, we describe the ongoing R&D effort to mitigate the electron cloud effect for the LC damping ring, focusing on the first experimental area and on results of the reduction of the secondary electron yield due to in situ conditioning.

43 PARTICLE ACCELERATORS↗

A Design Report of the Baseline for PEP-X: an Ultra-Low Emittance Storage Ring

Over the past year, we have worked out a baseline design for PEP-X, as an ultra-low emittance storage ring that could reside in the existing 2.2-km PEPII tunnel. The design features a hybrid lattice with double bend achromat (DBA) cells in two arcs and theoretical minimum emittance (TME) cells in the remaining four arcs. Damping wigglers are used to reduce the horizontal emittance to 86 pm-rad at zero current for a 4.5 GeV electron beam. At a design current of 1.5 A, the horizontal emittance increases, due to intrabeam scattering, to 164 pm-rad when the vertical emittance is maintained at a diffraction limited 8 pm-rad. The baseline design will produce photon beams achieving a brightness of 10{sup 22} (ph/s/mm{sup 2}/mrad{sup 2}/0.1% BW) at 10 keV in a 3.5-m conventional planar undulator. Our study shows that an optimized lattice has adequate dynamic aperture, while accommodating a conventional off-axis injection system. In this report, we present the results of study, including the lattice properties, nonlinear dynamics, intra-beam scattering and Touschek lifetime, RF system, and collective instabilities. Finally, we discuss the possibility of partial lasing at soft X-ray wavelengths using a long undulator in a straight section.

43 PARTICLE ACCELERATORS↗

Particle Engulfment and Pushing (PEP): Past Micro-Gravity Experiments and Future Experimental Plan on the International Space Station (ISS)

The interaction of an insoluble particle with a growing solid-liquid interface (SLI) has been a subject of investigation for the four decades. For a metallurgist or a material scientist understanding the fundamental physics of such an interaction is relevant for applications that include distribution of reinforcement particles in metal matrix composites, inclusion management in castings, and distribution of Y2Ba1Cu1O5 (211) precipitates (flux pinning sites) in Y1Ba2Cu3O7 (123) superconducting crystals. The same physics is also applicable to other areas including geological applications (frost heaving in soils) and preservation of biological cells. Experimentally this interaction can be quantified in terms of a critical growth velocity, Vcr, of the SLI below which particles are pushed ahead of the advancing interface, and above which the particles are engulfed. Past experimental evidence suggests that this Vcr is an inverse function of the particle radius, R. In order to isolate the fundamental physics that governs such a relationship it is necessary to minimize natural convection at the SLI that is inherent in ground based experiments. Hence for the purpose of producing benchmark data (Vcr vs. R) PEP is a natural candidate for micro-gravity experimentation. Accordingly, experiments with pure Al containing a dispersion of ZrO2 particles and an organic analogue, succinonitrile (SCN) containing polystyrene particles have been performed on the LMS and USMP-4 mission respectively. In this paper we will summarize the experimental data that was obtained during these two micro-gravity missions and show that the results differ compared to terrestrial experiments. We will also discuss the basic elements of our analytical and numerical model and present a comparison of the predictions of these models against micro-gravity experimental data. Finally. we will discuss our future experimental plan that includes the ISS glovebox and MSRRl.

Sen, Subhayu↗

Permanent Magnet Skew Quadrupoles for the Low Emittance LER Lattice of PEP-II

The vertical emittance of the low energy ring (LER) in the PEP-II B-Factory was reduced by using skew quadrupoles consisting of permanent magnet material. The advantages over electric quadrupoles or rotating existing normal quadrupoles are discussed. To assure a high field quality, a Biot-Savart calculation was used to cancel the natural 12-pole component by using different size poles over a few layers. A magnetic measurement confirmed the high quality of the magnets. After installation and adjusting the original electric 12 skew and 16 normal quadrupoles the emittance contribution from the region close to the interaction point, which was the biggest part in the original design, was considerably reduced. To strengthen the vertical behavior of the LER beam, a low emittance lattice was developed. It lowered the original vertical design emittance from 0.54 nm-rad to 0.034 nm-rad. In order to achieve this, additional skew quadrupoles were required to bring the coupling correction out of the arcs and closer to the detector solenoid in the straight (Fig. 1). It is important, together with low vertical dispersion, that the low vertical emittance is not coupled into the horizontal, which is what we get if the coupling correction continues into the arcs. Further details of the lattice work is described in another paper; here we concentrate on the development of the permanent skew (PSK) quadrupole solution. Besides the permanent magnets there are two other possibilities, using electric magnets or rotating normal quadrupoles. Electric magnets would have required much more additional equipment like magnets stands, power supply, and new vacuum chamber sections. Rotating existing quadrupoles was also not feasible since they are mostly mounted together with a bending magnet on the same support girder.

43 PARTICLE ACCELERATORS↗

HOM Power Generation and Propagation in the PEP II Rings

Most of the HOM power that propagates in the PEP-II rings is generated in the RF cavities but its content in terms of TE and TM components has not been accurately determined. For purpose of estimating power deposition at the cavity HOM loads, and also of shielding beamline components such as bellows from TE power penetration, this HOM power content and its distribution profile around the rings are needed. We calculate the TE and TM contributions of the RF cavity to the circulating HOM power and their transmission properties at another cavity downstream. By taking into account the generation in, and scattering by the cavities, as well as the attenuation along the vacuum chamber, a realistic estimate of the HOM power propagating out of a RF station is obtained. The formulation can include the HOM contributions of other beamline components such as collimators.

43 PARTICLE ACCELERATORS↗

Development of a Movable Plunger Tuner for the High Power RF Cavity for the PEP II B Factory

A 10 cm diameter by 5 cm travel plunger tuner was developed for the PEP-II RF copper cavity system. The single cell cavity including the tuner is designed to operate up to 150 kW of dissipated RF power. Spring finger contacts to protect the bellows from RF power are specially placed 8.5 cm away from the inside wall of the cavity to avoid fundamental and higher order mode resonances. The spring fingers are made of dispersion-strengthened copper to accommodate relatively high heating. The design, alignment, testing and performance of the tuner is described.

43 PARTICLE ACCELERATORS↗

Effect of TE Mode Power on the PEP II LER BPM System

The beam chamber of the PEP-II B-Factory Low Energy Ring (LER) arc sections is connected to an antechamber for the absorption of synchrotron radiation on discrete photon stops. The presence of the antechamber substantially reduces the cutoff frequency of the vacuum chamber and, in particular, allows the propagation of higher-order-mode (HOM) TE power generated by beamline components at the BPM signal processing frequency. Calculations of the transmission properties of the TE mode in different sections of the vacuum chamber show that the power is trapped between widely separated bellows in the arc sections. Because of the narrow signal bandwidth and weak coupling of the TE mode to the BPM buttons, the noise contributed by the HOM TE power will not produce a noticeable effect on the BPM position signal voltage. The LER arc vacuum chamber employs an antechamber with a discrete photon stop for absorption of synchrotron radiation and with pumps for maintaining pressure below 10 nTorr [1]. The horizontal dimensions of the antechambers at the pumping chamber section and the magnet chamber section are larger or comparable to that of the beam chamber. Because of the increase in the horizontal dimension, the cutoff frequency of the TE10-like mode (in rectangular coordinates) of the vacuum chamber is considerably reduced and, in particular, is less than the BPM signal processing frequency at 952 MHz. TE power propagating in the vacuum chamber will penetrate through the BPM buttons and will affect the pickup signal if its magnitude is not properly controlled. It is the purpose of this note to clarify various issues pertaining to this problem. TE power is generated when the beam passes a noncylindrically symmetric beamline component such as the RF cavity, the injection region, the IR crotch and the IP region. The beampipes connected to these components have TE cutoff frequencies greater than 952 MHz (for example, the TE cutoff frequency of the RF cavity beampipe is 1.8 GHz), and hence no TE power at this frequency propagates from the component. TE power can also be generated by the scattering of TM power through these beamline components. Since the cutoff frequency of the TM mode is in general higher than that of the TE mode, this mechanism is not pertinent to the problem related to the BPM signal. Consequently, the TE power that needs to be considered is mainly generated by components of the LER arc vacuum chamber, where the TE cutoff frequency is less than the BPM processing frequency.

43 PARTICLE ACCELERATORS↗

Measurements of the Electron Cloud Density in the PEP-II Low Energy Ring

Clouds of low energy electrons in the vacuum beam pipes of accelerators of positively charged particle beams present a serious limitation for operation of these machines at high currents. Because of the size of these accelerators, it is difficult to probe the low energy electron clouds over substantial lengths of the beam pipe. We have developed a novel technique to directly measure the electron cloud density via the phase shift induced in a TE wave that is independently excited and transmitted over a section of the accelerator. We infer the absolute phase shift with relatively high accuracy from the phase modulation of the transmission due to the modulation of the electron cloud density from a gap in the positively charged beam. We have used this technique for the first time to measure the average electron cloud density over a 50 m straight section in the positron ring of the PEP-II collider at the Stanford Linear Accelerator Center. We have also measured the variation of the density by using low field solenoid magnets to control the electrons.

43 PARTICLE ACCELERATORS↗

Quasireal Compton scattering measurement and e* scattering with DELCO at PEP

We report on a measurement of the elastic scattering of quasi-real photons generated by one beam with the particles of the other in e + e - interactions at $\sqrt{s}$ = 29 GeV performed using the DELCO detector at PEP. The events are characterized by coplanar and anti-tagged ey pairs with large visible energy where the charge of the electron is correlated with the acolinearity angle. We also use our result to search for the on-shell production of a hypothetical excited electron e*. We find that the data agree well with the predictions for the QED Compton process, and set upper limits on the e*e&gamma; coupling parameter λ to be below 10 -2 (95% C.L.) in the range 15 ≲ M e* 27 GeV.

Bonneaud, G.↗

BPM Breakdown Potential in the PEP-II B-factory Storage Ring Collider

High current B-Factory BPM designs incorporate a button type electrode which introduces a small gap between the button and the beam chamber. For achievable currents and bunch lengths, simulations indicate that electric potentials can be induced in this gap which are comparable to the breakdown voltage. This study characterizes beam induced voltages in the existing PEP-II storage ring collider BPM as a function of bunch length and beam current.

43 PARTICLE ACCELERATORS↗