An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

The requirements of the Hazardous Waste Facility Permit are fulfilled through execution of LANL's fourth strategic goal: “Enabling mission delivery through next-generation facility, infrastructure, and operational excellence.” With input from our stakeholders, we will continue to fulfill those requirements and to improve our waste operations. In 2015, the Laboratory purpose statement focused waste management efforts by directing delivery of mission success through operational effectiveness and scientific excellence. This Plan advances that purpose through community involvement. In the process of achieving our national security mission, Los Alamos National Laboratory generates some hazardous and mixed waste. Hazardous waste is solid waste that is dangerous or potentially harmful to human health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded as commercial products, such as cleaning fluids or pesticides, or as the byproducts of operations. Specific substances are listed in 40 Code of Federal Regulations (CFR), Part 261: 40 CFR Part 261. Hazardous waste management activities are regulated by the U. S. Environmental Protection Agency and the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515-1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure, post closure care, and cleanup as necessary, of permitted waste management units. On November 30, 2010, NMED renewed the Hazardous Waste Facility Permit (the Permit). In June 2020 the Permittees submitted a permit renewal application to the NMED for their review and approval. The Hazardous Waste Facility Permit Community Relations Plan (CRP) describes the scope of public involvement in the activities of the Permit. The CRP is specifically designed to facilitate the community outreach, engagement, and relations activities concerning the Laboratory’s Hazardous Waste Facility Permit and coordinates with but does not include public involvement for other Laboratory programs, initiatives, or environmental activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Joint Comments from the Department of Energy, National Nuclear Security Administration (DOE NNSA) Los Alamos Field Office and Triad National Security, LLC on the U.S. Environmental Protection Agency’s New Mexico State-Wide Municipal Separate Storm Sewer System Strawman General Permit

In December 2020 and March 2021, EPA issued two MS4 strawman permit drafts specific to the Los Alamos area. EPA made text changes in the 2 nd strawman permit based on stakeholder comments related to the initial draft. During the public meeting on the Los Alamos area designation decision held on February 13, 2024, EPA staff stated that comments from the past strawman permits would be incorporated into the new MS4 permit to be issued state-wide. However, it does not appear that any of the text changes from the 2 nd Los Alamos area strawman permit were included in this state-wide general MS4 strawman permit. For reference, the 2 nd Los Alamos area revised strawman permit is included with these comments as Attachment 2. Many of the following comments refer to or state EPA’s updated text included in the 2 nd Los Alamos area strawman permit. The updated text from this 2 nd strawman permit that are referenced in the following comments should be applicable state-wide and it is suggested that this past work be reconsidered and incorporated.

54 ENVIRONMENTAL SCIENCES↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

15 GEOTHERMAL ENERGY↗

Los Alamos National Laboratory Permit Modification Request for Technical Area 63 Transuranic Waste Facility Hazardous Waste Container Storage Unit (Rev. 3)

This Class 3 permit modification requests the addition of a hazardous waste management unit, the Transuranic Waste Facility (TWF), to the Los Alamos National Laboratory Hazardous Waste Facility Permit (November 2010), (hereinafter referred to as “the Permit”). The Permit was issued by the New Mexico Environment Department (NMED) in November, 1989 and renewed in 2010 (NMED 2010). The Los Alamos National Laboratory (LANL) Environmental Protection Agency (EPA) Identification Number is NM0890010515. The facility is owned by the National Nuclear Security Administration (NNSA) of the Department of Energy (DOE), and is operated jointly by NNSA-DOE and by Los Alamos National Security, LLC (LANS). This permit modification request has been prepared to address requirements in the New Mexico Administrative Code, Title 20, Chapter 4, Part 1 (20.4.1 NMAC), as revised October 2009, that are specific for the proposed new hazardous waste storage operations at the TWF. The renewed Permit contains many of the conditions addressing the requirements of the New Mexico Hazardous Waste Act (NMHWA) and implementing regulations, specifically 40 CFR, that are common to all LANL hazardous waste management units. The relevant sections of the Permit are referenced throughout this document. Together, information provided in this document and in the Permit will meet the applicable requirements specified in 40 CFR Parts 264 and 270 for the proposed unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major developments in section 404-permitting

Mountain coal mining in the Central Appalachians faces increased challenge under the Clean Water Act (CWA). These challenges have included the US Environmental Protection Agency's (EPA) increased involvement in permitting under Section 404 of the CWA; active opposition by environmental groups to Section 404 permits; and proposed federal legislation to reduce the availability of these permits. These recent challenges culminated in a June 11, 2009, Memorandum of Understanding (MoU) between the PEA, the Department of Interior (DoI) and the Army Corps of Engineers (Corps) that will limit the use of general permits for mountaintop coal mining and increase the scrutiny applied to individual permits, while also providing a coordinated approach for reviewing the backlog of pending permit application. By entering into the MoU, the federal agencies aim to reduce the environmental impacts of mountaintop coal mining while increasing certainty and transparency for permit applications. Challenges to Section 404 permitting for mountaintop coal mining are dynamic and new developments occur almost daily. This article provides a snapshot of the current climate.

01 COAL, LIGNITE, AND PEAT↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

09 BIOMASS FUELS↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Extract useful information from building permits data to profile a city’s building retrofit history

Building retrofit is one of the key strategies for cities to reduce energy use and GHG emissions. The historical information about changes to buildings is crucial to infer the buildings’ current energy system efficiency levels and to identify candidate buildings for retrofit. In general, a building permit is required before the start of any construction activity of a building, such as changing building structure, remodeling, or installing new equipment. Moreover, many large cities provide public datasets of building permits in history. Therefore, the permits are a potentially good resource for mining information on the city’s retrofit history. In this study, we use the permit dataset from the city of San Francisco as a case study. Location and time information from the dataset is also used to depict the retrofit timeline of each building and the whole building stock. The type of work of the permit is inferred from the descriptive text by a machine learning model. At last, the limitations of the current permit dataset and potential improvements on the permit data management are discussed to better utilize the information in the future.

Zhang, Wanni↗

Hanford site excavation permit application automation project - 15187

Mission Support Alliance, LLC (MSA), on behalf of the Department of Energy's Richland Operations Office (DOE-RL), recently implemented the Site Excavation Permit Application (SEPA) at Hanford. The SEPA automation replaced a 20-year-old manual excavation permit process that governed all Hanford Site excavation activities. The manual process required time consuming interaction between numerous resources for submitting an excavation permit to 15 separate permit organizations for approvals and signature. The process involved numerous information exchanges - usually by phone or E-mails, and substantial vehicle travel. It also generated large amounts of paper, lengthy wait periods and the need for continual status updates to permit reviewers until all approvals were obtained. The new SEPA automated system is an entirely paperless application that streamlines over 25 separate manual permit activities into five Web-based processes. The new application provides sizable environmental sustainability benefits in terms of avoiding: paper waste, air pollution and bio-fuel consumption. SEPA also deploys automated innovations that produce an approximate 50 percent operational cost reduction when compared to the manual permit process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗