Search NASA⌕ Search

SEARCH · Search NASA

Results for “POWER TRANSMISSION AND DISTRIBUTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evaluation of all-electric secondary power for transport aircraft

This report covers a study by Douglas Aircraft Company (DAC) of electrical power systems for advanced transport aircraft based upon an all-electric design concept. The concept would eliminate distributed hydraulic and pneumatic secondary power systems, and feature an expanded secondary electrical power system redesigned to supply power to the loads customarily supplied by hydraulic or pneumatic power. The initial study was based on an advanced 20-kHz electrical power transmission and distribution system, using a system architecture supplied by NASA-Lewis Research Center for twin-engine aircraft with many advanced power conversion concepts. NASA-LeRC later requested DAC to refocus the study on 400-Hz secondary power distribution. Subsequent work was based on a three-engine MD-11 aircraft, selected by DAC as a baseline system design that would provide data for the comparative cost/benefit analysis. The study concluded that the 20-kHz concept produced many expected benefits, and that the all-electric trijet weight savings on hardware redesign would be 2,304 pounds plus a 2.1-percent fuel reduction and resized for a total weight reduction of 11,000 pounds. Cost reductions for a fleet of 800 aircraft in a 15-year production program were estimated at $76.71 million for RDT&E; $2.74 million per aircrat for production; $9.84 million for nonrecurring expenses; $120,000 per aircraft for product support; and $300,000 per aircraft per year for operating and maintenance costs, giving a present value of $1.914 billion saved or a future value of $10.496 billion saved.

Murray, W. E.↗

An Analysis of Post Attack Impacts and Effects of Learning Parameters on Vulnerability Assessment of Power Grid

Due to the increasing number of heterogeneous devices connected to electric power grid, the attack surface increases the threat actors. Game theory and machine learning are being used to study the power system failures caused by external manipulation. Most of existing works in the literature focus on one-shot process of attacks and fail to show the dynamic evolution of the defense strategy. In this paper, we focus on an adversarial multistage sequential game between the adversaries of the smart electric power transmission and distribution system. We study the impact of exploration rate and convergence of the attack strategies (sequences of action that creates large scale blackout based on the system capacity) based on the reinforcement learning approach. We also illustrate how the learned attack actions disrupt the normal operation of the grid by creating transmission line outages, bus voltage violations, and generation loss. This simulation studies are conducted on IEEE 9 and 39 bus systems. The results show the improvement of the defense strategy through the learning process. The results also prove the feasibility of the learned attack actions by replicating the disturbances created in simulated power system.

attack impacts↗

The Effectiveness of Power Distribution Systems for Deployment on the Lunar Surface

Lunar habitation missions are currently being planned to have astronauts return to the moon by the mid 2020’s with a sustained lunar presence by the end of the decade. The various landed modules needed to support the missions are expected to be distributed around Shackleton Crater at distances ranging from 1 to 15 km and with power needs ranging from 10 kW to 50kW. Current plans call for a solar array to be installed on the rim of the crater that receives near-constant sunlight year around with a power distribution system that transfers power from the source to consumers. This paper details several power distribution systems: DC transmission lines, radio frequency power beaming, and optical power beaming. Sizing algorithms for each of these distributions systems along with their necessary subsystems were developed from literature and subject matter expertise input. Several experiments were then conducted to determine the performance of the systems along with their sensitivities to changes in assumptions for various sub-components. The defined Figures of Merit enable mission designers to select the best power distribution system for each possible power consumer mission scenario. The experimental results were analyzed and compiled into a set of figures that highlight the conditions for which a certain system outperforms the other.

Bradford Robertson↗

The Effectiveness of Power Distribution Systems for Deployment on the Lunar Surface

Lunar habitation missions are currently being planned to have astronauts return to the moon by the mid 2020’s with a sustained lunar presence by the end of the decade. The various landed modules needed to support the missions are expected to be distributed around Shackleton Crater at distances ranging from 1 to 15 km and with power needs ranging from 10 kW to 50kW. Current plans call for a solar array to be installed on the rim of the crater that receives near-constant sunlight year around with a power distribution system that transfers power from the source to consumers. This paper details several power distribution systems: DC transmission lines, radio frequency power beaming, and optical power beaming. Sizing algorithms for each of these distributions systems along with their necessary subsystems were developed from literature and subject matter expertise input. Several experiments were then conducted to determine the performance of the systems along with their sensitivities to changes in assumptions for various sub-components. The defined Figures of Merit enable mission designers to select the best power distribution system for each possible power consumer mission scenario. The experimental results were analyzed and compiled into a set of figures that highlight the conditions for which a certain system outperforms the other.

Bradford Robertson↗

Technical Characterization and Benefit Evaluation of 5G-Enabled Grid Data Transport and Applications

This report summarizes the Year 1 work of Pacific Northwest National Laboratory’s (PNNL’s) 5G Fabricated Resource and Asset Management Encompassment for energy infrastructure (Energy FRAME) project funded by the Department of Energy Office of Science’s Advanced Scientific Computing Research Program. 5G is a breakthrough technology that enables a fully mobile and connected society, and a 5G-enabled digital continuum will be one of the critical foundations for a clean energy economy and grid modernization. In collaboration with PNNL’s Advanced Wireless Communication team and Center for Advanced Technology Evaluation team, the project team has been evaluating the system performance of 5G testbeds in the PNNL 5G Innovation Studio, and has formulated a co-simulation test case of power system transmission, distribution, and communication (T&D&C) networks considering 5G technology and high penetration of distributed energy resources. The methodology developed in the 5G Energy FRAME project can be customized to fit different future grid scenarios to evaluate multiple (dynamic) configurations (computing, sensing, communication, environment) for different stakeholders. In summary, our main technical highlights in project Year 1 are as follows: 1) Technical characterization of 5G standalone architectures, 2) Formulation of co-simulation test case of T&D&C networks embedded with 5G, 3) Initial benefit evaluation of 5G communication platform for grid use cases, and 4) Additional extended discussions on edge computing, artificial intelligence and machine learning, and high-performance computing and cloud computing adoptions. In addition, a collection of system performance data is shared through the publicly available weblink, https://www.pnnl.gov/projects/5g-energy-frame/publications

24 POWER TRANSMISSION AND DISTRIBUTION↗

Longitudinal variations of very-low-frequency chorus activity in the magnetosphere - Evidence of excitation by electrical power transmission lines

The distribution of VLF chorus in the high-altitude magnetosphere as detected by the Ogo 3 satellite was investigated. Chorus occurrence frequency over 4,668 samples of 5 min of broadband data was computed for Northern Hemisphere bins of 10 deg by 10 deg in dipole invariant latitude and longitude. Peaks in activity were noted over Alaska, the eastern U.S. and Canada, western Europe, and western Siberia, and were shown not to be the result of biased sampling. It is suggested that power line radiation of only about 1 W or less at a given harmonic frequency may be sufficient to stimulate the observed chorus activity and that such power levels can be expected in industrial areas or from large distribution networks. Preliminary results show that chorus starting frequencies are highly correlated with 60 Hz harmonics in the American sector and with 50 Hz harmonics in the European sector.

Luette, J. P.↗

A Scalable Transmission and Distribution Co-simulation Platform for IBR-heavy Power Systems

The integration of Inverter-Based Resources (IBRs) into power systems, including both transmission and distribution networks, poses challenges for studying grid dynamic behaviours under various operating conditions and system events. This paper addresses the urgent need to investigate the influence of IBRs on grid dynamics, and their potential to enhance power system reliability and resilience. We propose a flexible, scalable transmission and distribution co-simulation platform, using opensource tools only for assessing the impact of grid-following (GFL) and grid-forming (GFM) IBRs on dynamic stability at various renewable penetration levels (up to 100%). This platform enables researchers to explore different contingencies at transmission, distribution, or both, providing a comprehensive evaluation of grid status. A series of case studies, including both small and large T&D systems with varying GFL/GFM configurations and contingencies, have been conducted. The results not only robustly validate our co-simulation framework, but also provide invaluable insights for effective IBR management in the power grid.

grid management↗

Network-Cognizant Time-Coupled Aggregate Flexibility of Distribution Systems Under Uncertainties

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. To exploit this flexibility and to use the capacity potential of aggregate DERs, feasible substation power injection trajectories need to be efficiently characterized. This paper provides an ellipsoidal inner approximation of the set of feasible power injection trajectories at the substation such that for any point in the set, there exists a feasible disaggregation strategy of DERs for any load uncertainty realization. The problem is formulated as one of finding the robust maximum volume ellipsoid inside the flexibility region under uncertainty. Though the problem is NP-hard even in the deterministic case, this paper derives novel approximations of the resulting adaptive robust optimization problem based on optimal second-stage policies. The proposed approach yields less conservative flexibility characterization than existing flexibility region approximation formulations. The efficacy of the proposed method is demonstrated on a realistic distribution feeder.

aggregates↗

Performance Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents performance evaluation of a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of sub-transmission and distribution networks, the DERMS software controller, and 84 power hardware solar photovoltaic (PV) inverters, standard communication protocols, and a capacitor bank controller. The DERMS algorithm is also called, Grid-Optimization of Solar (GO-Solar) platform which includes predictive state estimation (PSE) and online multiple objective optimization (OMOO) to dispatch the legacy devices and distributed energy resources (e.g., PV). The voltage regulation performance is evaluated under three scenarios, volt-var smart inverter (baseline), and DERMS control for 100% and 30% of PV. The results show that controlling 30% of PV systems with the GO-Solar platform may provide the best balance of control performance and implementation cost.

distributed energy resource management system (DER↗

Forming Interphase Microgrids in Distribution Systems Using Cooperative Inverters

Interphase-microgrids formed by three islanded single-phase feeders in distribution systems are proposed in this paper. Loss of utility caused by natural and human-made disasters may isolate each residential subdivision from the utility. In this case, the household loads are supplied by distributed generation (DG) units which may not be enough to meet the load demand. This can lead to deviations in voltage and frequency, and the deviations may vary for each phase. The proposed solution is to form an interphase-microgrid by seamlessly interconnecting the islanded single-phase feeders. This interphase-microgrid can effectively balance the load demands and DG generation in distribution systems after losing the utility supply. This paper presents different case studies to demonstrate the viability of forming interphase-microgrids for residential distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Extracting Resilience Metrics From Distribution Utility Data Using Outage and Restore Process Statistics

Resilience curves track the accumulation and restoration of outages during an event on an electric distribution grid. We show that a resilience curve generated from utility data can always be decomposed into an outage process and a restore process and that these processes generally overlap in time. We use many events in real utility data to characterize the statistics of these processes, and derive formulas based on these statistics for resilience metrics such as restore duration, customer hours not served, and outage and restore rates. The formulas express the mean value of these metrics as a function of the number of outages in the event. We also give a formula for the variability of restore duration, which allows us to predict a maximum restore duration with 95% confidence. Overall, we give a simple and general way to decompose resilience curves into outage and restore processes and then show how to use these processes to extract resilience metrics from standard distribution system data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

GDM (Grid Data Models) [SWR-24-31]

Grid Data Models (GDM) is a collection of pydantic data models for power distribution and transmission system components. These data models can be easily serialized and deserialized. GDM provides a standard interface for accessing power system component data with built in validation. See also: https://pypi.org/project/grid-data-models/

Duwadi, Kapil↗

CalderaCast User Manual Version 1.0

CalderaCast is a user-friendly web-based tool for electrical-load forecast, providing stakeholders with a fully customizable decision-support framework that estimates the likely power draw from a possible future electric-vehicle (EV) charging station at a given location on a given day along an alternative fuel corridor (AFC). These EV charging profiles are accurately modeled in CalderaCast using the Caldera software framework developed by Idaho National Laboratories (INL), reflecting the realistic charging levels observed in actual charge events. This tool was developed as part of the National Electric Vehicle Infrastructure (NEVI) program, which is quickly generating substantial interest from would-be charging station operators (CSO), large and small electric utilities, and state transportation planners, some of whom had not seriously considered EV charging previously. All these entities—with or without background in EV infrastructure—must estimate the electricity load that a proposed charging station will generate. This load forecast is critically important for a utility to properly assess the capacity of their distribution network to support the proposed station or properly size grid upgrades for potential load growth due to future EV adoption, vehicle technology improvements, or station growth. This document describes each aspect of the CalderaCast tool and provides guidance to users who are interested in utilizing the tool for their work.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Data Management for Digital Twin Implementation: Enhancing Existing SCADA Architecture for INL's CITRC Test Distribution System

The United States power grid will continue to experience stress from aging infrastructure, extreme weather, and increasing loads. In order to strengthen resiliency, researchers need to run tests and simulations that model real-life infrastructure. Idaho National Laboratory (INL) is creating a digital twin of its Critical Infrastructure Test Range Complex (CITRC). CITRC is an at-scale grid testbed which can be configured in utility-realistic distribution scenarios for a variety of tests, such as advanced grid protection and control. A digital twin of this infrastructure would support in-depth tests/simulations without risking physical consequences, before trialing devices under test at-scale. This project focuses on the data acquisition part of constructing a digital twin. It investigates the Supervisory Data Acquisition and Control (SCADA) system of CITRC and explores ways to utilize this system for the twin. Future “ideal” at-scale implementations such as upgraded equipment, modern communication protocols, and automation applications are also explored.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Interfaces for Inverter-Based Microgrid Experiments Including Transitions

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such interfaces are particularly challenging when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents two PHIL interfaces for such microgrids and the preliminary experimental results.

experiments↗

Experimental Analysis of Distribution Network Voltage Regulation Using Smart Inverters: Preprint

Smart inverters (SI) have huge potential in providing grid services which has not been fully realized yet. One of these grid services, distribution network voltage regulation by SI, can improve the network voltage by regulating the SI reactive and active power output. Voltage regulation by SI is much faster compared to traditional voltage regulating devices, e.g. tap changing transformer, capacitor banks. However, there is gap in available published literature on the characteristics of SIs when the SI is controlled by local controller or external control signal. This paper presents the experimental study to characterize SI reactive power regulation response to two different control methods: autonomous control method and remote dispatch method. It was found that IS reactive power regulation response could be significantly different in terms of delay, and ramp rate for these two methods. Finally, Power-Hardware-in-The-Loop (PHIL) tests were conducted to evaluate the performance of these two methods. The PHIL tests results show that SI response characteristics for autonomous control method and remote dispatch method need to be considered during planning for distribution network voltage regulation using SI.

autonomous control↗