Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRAS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report

The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.

Valentine, Mark↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗

Using Generic Data to Establish Dormancy Failure Rates

Many hardware items are dormant prior to being operated. The dormant period might be especially long, for example during missions to the moon or Mars. In missions with long dormant periods the risk incurred during dormancy can exceed the active risk contribution. Probabilistic Risk Assessments (PRAs) need to account for the dormant risk contribution as well as the active contribution. A typical method for calculating a dormant failure rate is to multiply the active failure rate by a constant, the dormancy factor. For example, some practitioners use a heuristic and divide the active failure rate by 30 to obtain an estimate of the dormant failure rate. To obtain a more empirical estimate of the dormancy factor, this paper uses the recently updated database NPRD-2011 [1] to arrive at a set of distributions for the dormancy factor. The resulting dormancy factor distributions are significantly different depending on whether the item is electrical, mechanical, or electro-mechanical. Additionally, this paper will show that using a heuristic constant fails to capture the uncertainty of the possible dormancy factors.

Reistle, Bruce↗

Synthesizing a New Launch Vehicle Failure Probability Based on Historical Flight Data

New launch vehicles have historically had significantly higher failure rates in early flights than what has been predicted using Probabilistic Risk Assessment - PRA. This is because PRAs typically model a mature vehicle where a significant portion of the early failure probability contributors have been eliminated due to testing and improvements after actual field operation. To capture a more accurate early flight failure probability estimate, this paper develops a method that estimates ascent failure probability starting with the first flight based on historical launch vehicle records. With new launch vehicles being developed, such as the Space Launch System - SLS, a PRA model must be extended to cover early flight failure probability contributions that are either not covered in the mature-vehicle PRA or are underestimated. These failure probability contributions include design errors, quality control deficiencies, installation errors, and environmental impacts. There are also failure dependencies due to systemic errors that still exist due to limited entire-system testing.

Cross, Robert B.↗

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Valuing Rigor in the Risk Management Process

NASA, as an organization, takes risk management (RM) seriously, and for most projects, the risk management process is exemplar. There can be challenges, though, with defining RM processes. For example, many different risk analysis methodologies are available, they can be applied with varying degrees of rigor, and they can have different value depending on how projects use them. In particular, risk analysis methodologies vary considerably in the level of quantitative detail, with more probabilistic techniques encouraged in some situations. We discussed these processes and methodologies with ten project managers (PM) at the NASA Goddard Space Flight Center (GSFC). Our intent was not to prove with some level of statistical significance that some are more helpful than others, but rather to obtain a general understanding of how projects are identifying, and thinking, about risks. This paper describes some of the available risk processes and methodologies, and provides some insights about the benefits that can gained from their use. We provide an in-depth discussion of one quantitative methodology, Probabilistic Risk Assessments (PRAs), and conclude with a few insights from observed best practices.

Dillon, Robin L.↗

"Making Safety Happen" Through Probabilistic Risk Assessment at NASA

NASA is using Probabilistic Risk Assessment (PRA) as one of the tools in its Safety & Mission Assurance (S&MA) tool belt to identify and quantify risks associated with human spaceflight. This paper discusses some of the challenges and benefits associated with developing and using PRA for NASA human space programs. Some programs have entered operation prior to developing a PRA, while some have implemented PRA from the start of the program. It has been observed that the earlier a design change is made in the concept or design phase, the less impact it has on cost and schedule. Not finding risks until the operation phase yields much costlier design changes and major delays, which can result in discussions of just accepting the risk. Risk contributors identified by PRA are not just associated with hardware failures. They include but are not limited to crew fatality due to medical causes, the environment the vehicle and crew are exposed to, the software being used, and the reliability of the crew performing required actions. Some programs have entered operation prior to developing a PRA, and while PRA can still provide a benefit for operations and future design trades, the benefit of implementing PRA from the start of the program provides the added benefit of informing design and reducing risk early in program development. Currently, NASA’s International Space Station (ISS) program is in its 20th year of on-orbit operations around the Earth and has several new programs in the design phase preparing to enter the operation phase all of which have active (or living) PRAs. These programs incorporate PRA as part of their Risk-Informed, Decision-Making (RIDM) process. For new NASA human spaceflight programs discussion begins with mission concept, establishing requirements, forming the PRA team, and continues through the design cycles into the operational phase. Several examples of PRA related applications and observed lessons are included.

Applications↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from pervious PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from previous PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

A RE-LOOK AT THE US NRC SAFETY GOALS

Since they were adopted in 1986, the US NRC’s Safety Goals have played a valuable role as a de facto risk acceptance criterion against which the predicted performance of a commercial nuclear power reactor can be evaluated and assessed. The current safety goals are cast in terms of risk metrics called quantitative health objectives (QHOs), limiting numerical values of the risks of the early and latent health effects of accidental releases of radioactivity to the offsite population. However, while demonstrating compliance with current safety goals has been an important step in assessing the acceptance of the risk posed by LWRs, new or somewhat different goals may be needed that go beyond the current early fatality and latent cancer fatality QHOs in assessing reactor risk. Natural phenomena such as hurricanes seem to be suitable candidates for establishing a background rate to derive a risk goal as their order of magnitude cost of damages is similar to those estimated in severe accident Level 3 PRAs done for nuclear power plants. This paper obtains a risk goal that could have a wider applicability, compared to the current QHOs, as a technology-neutral goal applicable to future reactors and multi-unit sites.

42 ENGINEERING↗

IMPLEMENTING THE NFPA 805 PROCESS: Observations of a Technical Reviewer

In June 2004 the U.S. Nuclear Regulatory Commission (NRC) amended its fire protection requirements to permit existing nuclear power reactor licensees to voluntarily adopt fire protection requirements contained in National Fire Protection Association (NFPA) Standard 805. NFPA 805 is a performance-based standard for nuclear power plant fire protection that is an alternative to the deterministic, prescriptive fire protection requirements, such as 10 CFR 50 Appendix R, that was issued in 1980. One aspect of implementing NFPA 805 is that the licensee adopts the performance goals, objectives, and criteria for nuclear safety specified in the Standard. These goals, objectives, and criteria can be met through the implementation of deterministic approaches or performance-based approaches, including engineering analyses, probabilistic risk assessment, and fire modeling. Licensees voluntarily adopting the fire protection requirements in NFPA 805 must submit a license amendment request (LAR) to the NRC. The LAR provides the new proposed fire protection licensing basis, including the methodology and results of required evaluations and analyses that show how the NFPA 805 performance criteria are met. As of August 2014, licensees have submitted LARs for 26 nuclear power plants, representing 42 nuclear reactor units. Of these, 7 nuclear power plants, representing 10 nuclear reactor units, have been issued a safety evaluation (SE) by the NRC approving transition of their fire protection licensing basis to one that complies with NFPA 805. Pacific Northwest National Laboratory (PNNL) supports the NRC staff’s technical review of the LARs in the areas of fundamental fire protection, safe shutdown analysis, and Probabilistic Risk Assessment (PRA). PNNL, of course, cannot speak for the nuclear industry and its choice of implementation strategies or the NRC staff’s assessment of the approaches being taken to adopt NFPA 805. However, as a reviewer of the technical details of these submittals, PNNL is in a position to observe the array of implementation tactics taken in these submittals, and observe different ways licensees are making the NFPA 805 process work. For example, we see differences in how fire areas are being transitioned, the kinds of plant modifications being implemented, the changes being made to plant procedures, the number and types of recovery actions being credited, and the kinds and extent of detailed modeling being performed in support of the Fire PRAs. As a caveat, we note that it is probably too early to comment on the overall success or limitations of the NFPA 805 process or provide lessons learned for the future. Furthermore, it is not our intention to endorse any particular approach taken in a submittal over another or to critique the industry or the regulator. Rather our goal in this paper is to summarize a set of interesting and useful differences across submittals that may provide context for further future discussions about what we (i.e., reviewers, industry, and regulators) have learned in being part of the NFPA process; and how to best use that information to inform future NFPA 805 activities or other risk-informed endeavors.

NFPA 805, PRA, PSA, probabilistic risk assessment,↗

Advanced Nuclear Technology. Using Technology for Small Modular Reactor Staff Optimization, Improved Effectiveness, and Cost Containment, 3002007071

Through this grant, the U.S. Department of Energy (DOE) will review several functional areas within a nuclear power plant, including fire protection, operations and operations support, refueling, training, procurement, maintenance, site engineering, and others. Several functional areas need to be examined since there appears to be no single staffing area or approach that alone has the potential for significant staff optimization at new nuclear power plants. Several of the functional areas will require a review of technology options such as automation, remote monitoring, fleet wide monitoring, new and specialized instrumentation, human factors engineering, risk informed analysis and PRAs, component and system condition monitoring and reporting, just in time training, electronic and automated procedures, electronic tools for configuration management and license and design basis information, etc., that may be applied to support optimization. Additionally, the project will require a review key regulatory issues that affect staffing and could be optimized with additional technology input. Opportunities to further optimize staffing levels and staffing functions by selection of design attributes of physical systems and structures need also be identified. A goal of this project is to develop a prioritized assessment of the functional areas, and R&D actions needed for those functional areas, to provide the best optimization

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment

In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards such as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Risk Importance Measures in the Designand Operation of Nuclear Power Plants

This monograph presents and discusses risk importance measures as quantified by the probabilistic risk assessment (PRA) models of nuclear power plants (NPPs) developed according to the current standards and practices. Usually, PRA tools calculate risk importance measures related to a single ?basic event? representing particular failure mode. This is, then, reflected in many current PRA applications. The monograph focuses on the concept of ?component-level? importance measures that take into account different failure modes of the component including common-cause failures (CCFs). In opening sections the roleof risk assessment in safety analysis of an NPP is introduced and discussion given of ?traditional?, mainly deterministic, design principles which have been established to assign a level of importance to a particular system, structure or component. This is followed by an overview of main risk importance measures for risk increase and risk decrease from current PRAs. Basic relations which exist among the measures are shown. Some of the current practical applications of risk importancemeasures from the field of NPP design, operation and regulation are discussed. The core of the monograph provides a discussion on theoreticalbackground and practical aspects of main risk importance measures at the level of ?component? as modeled in a PRA, starting from the simplest case, single basic event, and going toward more complexcases with multiple basic events and involvements in CCF groups. The intent is to express the component-level importance measures via theimportance measures and probabilities of the underlying single basic events, which are the inputs readily available from a PRA model andits results. Formulas are derived and discussed for some typical cases. The formulas and their results are demonstrated through some practicalexamples, done by means of a simplified PRA model developed in and run by RiskSpectrum? tool, which are presented in the appendices. The monograph concludes with discussion of limitations of the use of risk importance measures and a summary of component-level importance cases evaluated.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Re-Evaluating the Current Safety Goals

The Safety Goals adopted by the US NRC consist of two qualitative safety goals (QSGs) backed up by two quantitative health objectives (QHOs). The QHOs establish risk limits for severe accidents in terms of their radiological consequences, in particular, the average individual health risks of early fatality and latent cancers from radiation exposure of members of the public living in the vicinity of a nuclear power plant. This paper is devoted to a re-examination of the coverage of the current safety goals in evaluating the actual risk posed by nuclear power plant operation. Experience of recent Level 3 PRAs suggests that given a high likelihood of evacuation of the close-in population before any release occurs, the current QHOs are satisfied by large margins. However, the experience of an actual severe accident at Fukushima showed that actual human health effects from released radiation were not the dominant consequences; there were no early fatalities and no measurable increases expected in cancer rates above the baseline rates in the Japanese population. Hence, regardless of accident probability, Fukushima-type accidents would satisfy the NRC’s health-related safety goals. However, there were very significant societal costs, in that large numbers of people were relocated for long periods. We argue that, in addition to the risks addressed in current safety goals, societal risk should also be evaluated. The paper discusses specific possibilities for a goal and an associated quantitative objective.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Statistical Testing Approach for Quantifying Software Reliability; Application to an Example System

The U.S. Nuclear Regulatory Commission (NRC) encourages the use of probabilistic risk assessment (PRA) technology in all regulatory matters, to the extent supported by the state-of-the-art in PRA methods and data. Although much has been accomplished in the area of risk-informed regulation, risk assessment for digital systems has not been fully developed. The NRC established a plan for research on digital systems to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems in the PRA's of nuclear power plants (NPPs), and, (2) incorporating digital systems in the NRC's risk-informed licensing and oversight activities. Under NRC's sponsorship, Brookhaven National Laboratory (BNL) explored approaches for addressing the failures of digital instrumentation and control (I and C) systems in the current NPP PRA framework. Specific areas investigated included PRA modeling digital hardware , development of a philosophical basis for defining software failure , and identification of desirable attributes of quantitative software reliability methods . Based on the earlier research, statistical testing is considered a promising method for quantifying software reliability. It is widely recognized that software failures are due to the triggering of pre-existing defects by the software's operational environment. Software defects can arise from errors made in user requirements or coding errors introduced during the developmental process. The software's operational environment includes factors such as the time history of digital system inputs, communication interfaces, the internal state of the digital system, and external conditions. Thus, software reliability is a function of both the number of pre-existing defects and the presence of a triggering condition caused by the manner in which the software is used. In this paper, we describe a statistical software-testing approach for quantifying software reliability and applied it to the loop-operating control system (LOCS) of an experimental loop of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The work involved collaboration between BNL and INL. The objectives of the study include: (1) Development of a statistical testing approach for estimating software failure probability on demand, the results of which are suitable for including in a probabilistic risk assessment (PRA); and, (2) Application of the approach to the LOCS to estimate its failure probability, and obtain insights into the feasibility, practicality, and usefulness of the estimation in models of digital systems for inclusion in nuclear power plants' PRAs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The NRC's SPAR Models: Current Status, Future Development, and Modeling Issues

Probabilistic risk assessments (PRAs) play an increasingly important role in the regulatory framework of the U.S. nuclear power industry. The Nuclear Regulatory Commission (NRC) relies on a set of plant-specific Standardized Plant Analysis Risk (SPAR) models to provide critical risk-based input to the regulatory process. The Significance Determination Process (SDP), Management Directive 8.3 - NRC Incident Investigation Program, Accident Sequence Precursor (ASP) and Mitigating Systems Performance Index (MSPI) programs are among the regulatory initiatives that receive significant input from the SPAR models. Other uses of the SPAR models include: Screening & Resolution of Generic Safety Issues, License Amendment reviews and Notice of Enforcement Discretion (NOEDs). This paper presents the current status of SPAR model development activities, future development objectives, and issues related to the development, verification and maintenance of the SPAR models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Fire Events Database to Support Fire PRA

Abstract: This paper provides a description of the updated and enhanced Fire Events Data Base (FEDB) developed by the Electric Power Research Institute (EPRI) in cooperation with the U.S. Nuclear Regulatory Commission (NRC). The FEDB is the principal source of fire incident operational data for use in fire PRAs. It provides a comprehensive and consolidated source of fire incident information for nuclear power plants operating in the U.S. The database classification scheme identifies important attributes of fire incidents to characterize their nature, causal factors, and severity consistent with available data. The database provides sufficient detail to delineate important plant specific attributes of the incidents to the extent practical. A significant enhancement to the updated FEDB is the reorganization and refinement of the database structure and data fields and fire characterization details added to more rigorously capture the nature and magnitude of the fire and damage to the ignition source and nearby equipment and structures

99 GENERAL AND MISCELLANEOUS↗