Search NASA⌕ Search

SEARCH · Search NASA

Results for “PREFLIGHT OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Managing the Risk for Early Onset Osteoporosis in Long-Duration Astronauts Due to Spaceflight

Early Onset Osteoporosis is probably the most recognized but poorly understood long-term health risk due to spaceflight. Osteoporosis management is primarily prophylactic and clinical interventions rely upon the ability to predict fractures which is currently determined by surrogate measures of bone strength. The RMAT for Early Onset Osteoporosis identified some open issues related to the fact that long-duration astronauts compose a unique group of subjects for which clinical approaches for osteoporosis management do not apply. Long-duration astronauts are healthy, young (25 to 55 years of age), predominantly male, and physical fit relative to the typical osteoporosis patient. Moreover, during prolonged space missions (typically 6-month missions) the skeleton not only adapts to weightlessness, but is influenced by numerous risk factors induced by operational constraints, e.g., inability to maintain preflight weight-bearing and aerobic activities, sub-optimal dietary intake (e.g., high sodium content for food stability, lack of fresh fruit and vegetables), suppression of vitamin D metabolism by uv shielding, and remote medicine care. Moreover, adaptation results in novel changes to astronauts bones that cannot be detected by current medically-useful measures. Consequently, a panel of clinicians (recognized leaders and policy-makers in osteoporosis) was convened to review the dataset of bone measures and bone loss risk factors in long-duration astronauts. Driven by the queries in the RMAT, the panel was charged to determine 1) if an intervention is required to prevent this risk, 2) what type and at what time would intervention be optimal, 3) what is the clinical trigger that would require a medical response from flight surgeons and 4) how should research data be used in the clinical care of astronauts. Hence, the RMAT determined that a bone health policy need to be formulated specific for this unique cohort subjected to a novel skeletal condition

Sibonga, Jean D.↗

Fuel conservation capability and effort by commercial air carriers

Computer capability weather input data, performance data, and ATC interface are discussed in terms of their role in preflight and inflight planning for commercial flights. The effect of preflight and inflight planning on fuel efficient operation was evaluated along with the impact of avionics. It was found that there is a potential for saving fuel through use of avionics, especially in the area of vertical guidance in all phases of flight. Other results of the study indicate: (1) preflight planning as it now stands is adequate with the exception that more accurate and up-to-date weather information is desirable; (2) better inflight information about existing weather conditions is needed; and (3) ATC can aid in fuel conservation.

Source record↗

Dawn Ion Propulsion System - Initial Checkout After Launch

The first 80 days after launch of the Dawn mission were dedicated to the checkout of the spacecraft with a major emphasis on the ion propulsion system. All three ion thrusters, all three thruster-gimbal assemblies, both power processor units, both digital interface and control units, and the entire xenon feed system were completely checked out and every component was found to be in good health. Direct thrust measurements agreed well with preflight expected values for all three thrusters over the entire throttle range. Thruster electrical operating parameters and power processor units efficiencies also agreed well with preflight expected values based on acceptance test data. Two of the three ion thrusters were fully checked out within 30 days after launch. Checkout of all three thrusters was completed 64 days after launch. Deterministic thrusting with the IPS began on December 17, 2007.

electric propulsion↗

Timeliner: Automating Procedures on the ISS

Timeliner has been developed as a tool to automate procedural tasks. These tasks may be sequential tasks that would typically be performed by a human operator, or precisely ordered sequencing tasks that allow autonomous execution of a control process. The Timeliner system includes elements for compiling and executing sequences that are defined in the Timeliner language. The Timeliner language was specifically designed to allow easy definition of scripts that provide sequencing and control of complex systems. The execution environment provides real-time monitoring and control based on the commands and conditions defined in the Timeliner language. The Timeliner sequence control may be preprogrammed, compiled from Timeliner "scripts," or it may consist of real-time, interactive inputs from system operators. In general, the Timeliner system lowers the workload for mission or process control operations. In a mission environment, scripts can be used to automate spacecraft operations including autonomous or interactive vehicle control, performance of preflight and post-flight subsystem checkouts, or handling of failure detection and recovery. Timeliner may also be used for mission payload operations, such as stepping through pre-defined procedures of a scientific experiment.

Brown, Robert↗

Solar electric propulsion breadboard thrust subsystem test results.

Work providing a firm basis for building an engineering model thrust subsystem (TSS) is described. A 1500-hr functional demonstration test revealed the impact of each element on TSS integration, operation, and future development. The primary conclusions are: accurate and specific definition of interfaces is essential to a timely system integration program. In addition to normal operating requirements, this definition must include requirements for preflight checkout, self-protection of all interfaces, capability expansion, failure modes, maximum input power, interelement power losses, noise and transient sensitivity and production, packaging for vacuum, thermal control, electrical grounding, cabling, mounting, and handling. In any future design, each phase of the TSS operation (startup, throttling, switching, etc.) should be considered in detail to anticipate and account for possible in-flight variations in element characteristics and performance.

Masek, T. D.↗

Pioneer imaging photopolarimeter optical system.

The imaging photopolarimeter aboard the Pioneer 10 spacecraft en route to the vicinity of Jupiter is described. This instrument is capable of moderate resolution spin-scan imaging and high precision polarimetric and photometric mapping of Jupiter in red and blue light. The field of view can be selectively changed from 0.50 mrad square to 40 mrad square to accommodate resolution and radiance combinations ranging from the zodiacal background to that of Jupiter. Optical materials were chosen to survive, with minimum degradation, the rigors of a nearly 2-year journey to Jupiter including transit through the Jovian trapped radiation belts. The optics are described in detail, and the operational system is outlined. The procedures for preflight and in-flight calibration are described, and some performance characteristics and preliminary flight results are presented.

Pellicori, S. F.↗

Preliminary flight assessment of the X-29A advanced technology demonstrator

Several new technologies integrated on the X-29A advanced technology demonstrator are being evaluated for the next generation of fighter aircraft. Some of the most noteworthy ones are the forward-swept wing, digital fly-by-wire flight control system, close-coupled wing-canard configuration, aeroelastically tailored composite wing skins, three-surface pitch control configuration, and a highly unstable airframe. The expansion of the aircraft 1-g and maneuver flight envelopes was recently completed over a two-year period in 84 flights. Overall flight results confirmed the viability of the aircraft design, and good agreement with preflight predictions was obtained. The individual technologies' operational workability and performance were confirmed. This paper deals with the flight test results and the preliminary evaluation of the X-29A design and technologies. A summary of the primary technical findings in structural static loads, structural dynamic characteristics, flight control system characteristics, aerodynamic stability and control, and aerodynamic performance is presented.

Hicks, John W.↗

Preliminary flight assessment of the X-29A advanced technology demonstrator

Several new technologies integrated on the X-29A advanced technology demonstrator are being evaluated for the next generation of fighter aircraft. Some of the most noteworthy ones are the forward-swept wing, digital fly-by-wire flight control system, close-coupled wing-canard configuration, aeroelastically tailored composite wing skins, three-surface pitch control configuration, and a highly unstable airframe. The expansion of the aircraft 1-g and maneuver flight envelopes was recently completed over a two-year period in 84 flights. Overall flight results confirmed the viability of the aircraft design, and good agreement with preflight predictions was obtained. The individual technologies' operational workability and performance were confirmed. This paper deals with the flight test results and the preliminary evaluation of the X-29A design and technologies. A summary of the primary technical findings in structural static loads, structural dynamic characteristics, flight control system characteristics, aerodynamic stability and control, and aerodynamic performance is presented.

Hicks, John W.↗

Modeling and simulation for space medicine operations: preliminary requirements considered

The NASA Space Medicine program is now developing plans for more extensive use of high-fidelity medical simulation systems. The use of simulation is seen as means to more effectively use the limited time available for astronaut medical training. Training systems should be adaptable for use in a variety of training environments, including classrooms or laboratories, space vehicle mockups, analog environments, and in microgravity. Modeling and simulation can also provide the space medicine development program a mechanism for evaluation of other medical technologies under operationally realistic conditions. Systems and procedures need preflight verification with ground-based testing. Traditionally, component testing has been accomplished, but practical means for "human in the loop" verification of patient care systems have been lacking. Medical modeling and simulation technology offer potential means to accomplish such validation work. Initial considerations in the development of functional requirements and design standards for simulation systems for space medicine are discussed.

Non-programmatic↗

Aeroheating Analysis for the Mars Reconnaissance Orbiter with Comparison to Flight Data

The aeroheating environment of the Mars Reconnaissance Orbiter (MRO) has been analyzed using the direct simulation Monte Carlo and free-molecular techniques. The results of these analyses were used to develop an aeroheating database to be used for the preflight planning and the in-flight operations support for the aerobraking phase of the MRO mission. The aeroheating predictions calculated for the MRO include the heat transfer coefficient (CH) over a range of angles-of-attack, sideslip angles, and number densities. The effects of flow chemistry, surface temperature, and surface grid resolution were also investigated to determine the aeroheating database uncertainties. Flight heat flux data has been calculated from surface temperature sensor data returned to Earth from the MRO in orbit around Mars during the aerobraking phase of its mission. The heat flux data have been compared to the aeroheating database and agree favorably.

Liechty, Derek S.↗

Requirements for Modeling and Simulation for Space Medicine Operations: Preliminary Considerations

The NASA Space Medicine program is now developing plans for more extensive use of high-fidelity medical Simulation systems. The use of simulation is seen as means to more effectively use the limited time available for astronaut medical training. Training systems should be adaptable for use in a variety of training environments, including classrooms or laboratories, space vehicle mockups, analog environments, and in microgravity. Modeling and simulation can also provide the space medicine development program a mechanism for evaluation of other medical technologies under operationally realistic conditions. Systems and procedures need preflight verification with ground-based testing. Traditionally, component testing has been accomplished, but practical means for "human in the loop" verification of patient care systems have been lacking. Medical modeling and simulation technology offer potential means to accomplish such validation work. Initial considerations in the development of functional requirements and design standards for simulation systems for space medicine are discussed.

Dawson, David L.↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Transmittance Measurement of a Heliostat Facility used in the Preflight Radiometric Calibration of Earth-Observing Sensors

Ball Aerospace and Technologies Corporation in Boulder, Colorado, has developed a heliostat facility that will be used to determine the preflight radiometric calibration of Earth-observing sensors that operate in the solar-reflective regime. While automatically tracking the Sun, the heliostat directs the solar beam inside a thermal vacuum chamber, where the sensor under test resides. The main advantage to using the Sun as the illumination source for preflight radiometric calibration is because it will also be the source of illumination when the sensor is in flight. This minimizes errors in the pre- and post-launch calibration due to spectral mismatches. It also allows the instrument under test to operate at irradiance values similar to those on orbit. The Remote Sensing Group at the University of Arizona measured the transmittance of the heliostat facility using three methods, the first of which is a relative measurement made using a hyperspectral portable spectroradiometer and well-calibrated reference panel. The second method is also a relative measurement, and uses a 12-channel automated solar radiometer. The final method is an absolute measurement using a hyperspectral spectroradiometer and reference panel combination, where the spectroradiometer is calibrated on site using a solar-radiation-based calibration.

Czapla-Myers, J.↗

Development and integration of the infrared telescope for Spacelab

A description is given of the design features of the Small Helium-Cooled Infrared Telescope (IRT) being developed for the 1983 Spacelab 2 mission and the problems encountered during the development of its (1) superfluid helium system requirements, (2) interfaces with Spacelab, and (3) Kennedy Space Center prelaunch operations requirements and restrictions. The IRT comprises cryogenic, IR optical, mechanical, and electronics subsystems. Attention is given the preflight management of superfluid helium by a vacuum maintenance assembly (VMA), which will operate almost continuously until launch and then be deactivated to fly as unavoidable ballast. The objective of IRT design and development is the meeting of IR science and engineering objectives with a relatively low-cost system.

Urban, E. W.↗

Modeling the TPF interferometer

The Terrestrial Planet Finder interferometer design concepts are large and complex systems that must operate in environments that are impractical to reproduce in preflight testing. The structurally-connected design is 36 meters long - longer than all but one thermal vacuum chamber in existence. The formation flying design will be comprised of up to five separate spacecraft, each with a sunshield over 15 meters on a side, and is designed to operate with formation sizes spanning over 100 meters to very close formations. System-level verification of the performance of the designs will need to rely on analytical modeling. The effort to model the many physical aspects of the designs under study is under way*. This paper describes the program of modeling for the TPF-I concepts. The program includes a number of types of models, such as the standard stand-alone optics, thermal, and structural models, as well as an end-to-end performance model of the project system called the Observatory Simulation. Aspects of each model are discussed including the purpose, methods of implementation (software applications), and approaches to validation. Program-level considerations (such as model-to-model integration and configuration management) are also discussed. Given that there are at least seven different organizations contributing to model developments and more than twenty separate models, these are special challenges.

Henry, Curt↗

The design and reconstruction of the Viking Lander descent trajectories

The success of the Viking Mission is truly a major milestone in this country's planetary exploration program. This paper deals with the trajectory characteristics of the Viking Lander descent trajectories, beginning with the imposed requirements and constraints, the final preflight design based on the final hardware and operational capability, and ending with the actual performance achieved. A comparison between the predicted and actual trajectory characteristics is made to indicate the achieved accuracy and modeling fidelity. Also, estimates of the Martian environment derived from the entry-trajectory reconstruction process are presented.

Euler, E. A.↗

The aerodynamic challenges of the design and development of the space shuttle orbiter

The major aerodynamic design challenge at the beginning of the United States Space Transportation System (STS) research and development phase was to design a vehicle that would fly as a spacecraft during early entry and as an aircraft during the final phase of entry. The design was further complicated because the envisioned vehicle was statically unstable during a portion of the aircraft mode of operation. The second challenge was the development of preflight aerodynamic predictions with an accuracy consistent with conducting a manned flight on the initial orbital flight. A brief history of the early contractual studies is presented highlighting the technical results and management decisions influencing the aerodynamic challenges. The configuration evolution and the development of preflight aerodynamic predictions will be reviewed. The results from the first four test flights shows excellent agreement with the preflight aerodynamic predictions over the majority of the flight regimes. The only regimes showing significant disagreement is confined primarily to early entry, where prediction of the basic vehicle trim and the influence of the reaction control system jets on the flow field were found to be deficient. Postflight results are analyzed to explain these prediction deficiencies.

Young, J. C.↗