Search NASA⌕ Search

SEARCH · Search NASA

Results for “PV plant control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

SunDial – An Integrated SHINES System to Enable High-penetration Feeder-level PV

The Project Team of Fraunhofer USA, National Grid, and IPKeys developed and conducted a pilot deployment of the SunDial system, a virtual power plant platform that enables high-penetrations of solar PV to be integrated into the distribution grid. The pilot was conducted over a 15-month period from August 2018 through October 2019 on a National Grid distribution feeder in Shirley, MA. A vendor-agnostic control platform (the “Global Scheduler”) optimally shaped the net load for a virtual portfolio of non-co-located DERs based on user-defined policy objectives. The goal of the SunDial project was to simplify and reduce the risk associated with the deployment of solar in high-penetration environments by: (1) Developing an open-source, vendor-agnostic dispatch platform that can be readily adapted to optimize control of DERs over a variety of use cases; (2) Developing auto-calibrating load and solar prediction methodologies that can be readily implemented and scaled to new deployments; (3) Developing a methodology to use demand-side management with traditional electrochemical energy storage to provide “load shaping” services in high solar penetration environments; (4) Using grid-scale storage to minimize short-term intermittency association with PV production; and (5) Deploying on the National Grid distribution system to gain experience on the potential for (and limits of) integrated storage with demand-side management.

14 SOLAR ENERGY↗

Site demonstration and performance evaluation of MPC for a large chiller plant with TES for renewable energy integration and grid decarbonization

Thermal energy storage (TES) for a cooling plant is a crucial resource for load flexibility. Traditionally, simple, heuristic control approaches, such as the storage priority control which charges TES during the nighttime and discharges during the daytime, have been widely used in practice, and shown reasonable performance in the past benefiting both the grid and the end-users such as buildings and district energy systems. However, the increasing penetration of renewables changes the situation, exposing the grid to a growing duck curve, which encourages the consumption of more energy in the daytime, and volatile renewable generation which requires dynamic planning. The growing pressure of diminishing greenhouse gas emissions also increases the complexity of cooling TES plant operations as different control strategies may apply to optimize operations for energy cost or carbon emissions. This paper presents a model predictive control (MPC), site demonstration and evaluation results of optimal operation of a chiller plant, TES and behind-meter photovoltaics for a campus-level district cooling system. The MPC was formulated as a mixed-integer linear program for better numerical and control properties. Compared with baseline rule-based controls, the MPC results show reductions of the excess PV power by around 25%, of the greenhouse gas emission by 10%, and of peak electricity demand by 10%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improvements to PVWatts for Fixed and One-Axis Tracking Systems

This work presents improvements to the widely used NREL PVWatts photovoltaic system energy model to improve modeling accuracy for typical fixed and one axis system designs. The aim is to calculate losses in the PV system assuming typical modern system design practices, while maintaining simplicity by keeping the required set of input parameters small. These improvements allow users to more credibly and quickly evaluate competing system designs in early stage feasibility. Common submodels for module cover, spectral, snow, tracker, transformer, plant controller, and self-shading losses, in addition to a bifacial gain option, are incorporated into the PVWatts model, and are shown to improve PVWatts' system performance prediction capabilities without major impact to ease of use. We anticipate including these improvements in a future release of NREL's open source PVWatts code, and some of the features may become available in the System Advisor Model (SAM) desktop software as well as the popular PVWatts web application.

14 SOLAR ENERGY↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Fidelity Models and Fast EMT Simulation Algorithms for Isolated Multi-port Autonomous Reconfigurable Solar power plant (MARS)

The integration of hybrid photovoltaic (PV) and energy storage system (ESS) based plants has become a promising way of solving the intermittency of PV plants and providing frequency support to the power grid. The multi-port autonomous reconfigurable solar power plant (MARS) can integrate the PV systems and ESSs to an ac grid and dc lines. The proposed isolated MARS incorporates an isolated converter that connects to the PV arrays and is based on the dual active bridge (DAB) converter. The high frequency switching in the DAB and the means to control the DAB converter using delays between switching signals lead to the need for a small timestep in simulations. Moreover, several hundreds of modules that include a DAB converter are present in the MARS. The small timestep and the presence of several hundreds of modules lead to a significant rise in the overall simulation time. To address this issue, simulation algorithms like numerical stiffness-based hybrid discretization and the hysteresis relaxation technique are applied to the switched system model of isolated MARS. Additionally, an event-driven interpolating method is introduced to help increase the minimum timestep to simulate the conventional DAB converter model while maintaining high accuracy in the simulation results. The developed model is validated by comparison with its reference model built in the PSCAD/EMTDC and MATLAB software environments using library components.

Xia, Qian↗

Real-time Simulation Framework for Hardware-in-the-Loop Testing of Multi-port Autonomous Reconfigurable Solar Power Plant (MARS)

Multiport autonomous reconfigurable solar power plant (MARS) has been proposed for integrated development of photovoltaic (PV) and energy storage system (ESS) that can connect to high-voltage direct current (HVdc) and alternating current (ac) transmission grid. To de-risk the development of this complex integrated system that consists of hundreds to thousands of power electronics modules, a controller hardware-in-the-loop (cHIL) test setup will be extremely beneficial. The cHIL testing can be used for evaluation of modules as well as the hierarchical control system in MARS. With the unique configuration of power electronics modules in MARS, it becomes necessary to develop custom-designed real-time simulation models in the cHIL setup in absence of off-the-shelf models. In this paper, high-fidelity dynamic model of MARS, control algorithms at the lower level, and required communication algorithms are developed and optimized for real-time performance in the cHIL setup. Real-time experimental results from the cHIL are provided.

Dong, Zerui↗

Co-Simulation of Electric Power Distribution Systems and Buildings including Ultra-Fast HVAC Models and Optimal DER Control

Smart homes and virtual power plant (VPP) controls are growing fields of research with potential for improved electric power grid operation. A novel testbed for the co-simulation of electric power distribution systems and distributed energy resources (DERs) is employed to evaluate VPP scenarios and propose an optimization procedure. DERs of specific interest include behind-the-meter (BTM) solar photovoltaic (PV) systems as well as heating, ventilation, and air-conditioning (HVAC) systems. The simulation of HVAC systems is enabled by a machine learning procedure that produces ultra-fast models for electric power and indoor temperature of associated buildings that are up to 133 times faster than typical white-box implementations. Hundreds of these models, each with different properties, are randomly populated into a modified IEEE 123-bus test system to represent a typical U.S. community. Advanced VPP controls are developed based on the Consumer Technology Association (CTA) 2045 standard to leverage HVAC systems as generalized energy storage (GES) such that BTM solar PV is better utilized locally and occurrences of distribution system power peaks are reduced, while also maintaining occupant thermal comfort. An optimization is performed to determine the best control settings for targeted peak power and total daily energy increase minimization with example peak load reductions of 25+%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secondary Frequency Regulation from Variable Generation through Uncertainty Decomposition: An Economic and Reliability Perspective

The rapid integration of variable generation (VG), such as photovoltaics (PV), necessitates an increase in the secondary frequency regulation (SFR) to handle the system intra-dispatch interval imbalance because of VG's variation. Although PV has the control capability to provide SFR, the main challenge is in guaranteeing the delivery of PV's energy and SFRs capacities in the automatic generation control (AGC) within each dispatch interval considering its uncertainty. This paper proposes a deliverable VG SFR provision model with endogenous VG's power uncertainty decomposition. First, the uncertainty of VG is decomposed using distributionally robust chance constraints through which the deliverable SFR provision is guaranteed. Next, the intra-interval frequency response of PV's SFR is validated with a user defined AGC model including the PV power plant. Finally, the economic benefits and the reliability improvements such as the frequency deviation reduction with PV providing SFRcan be integrated and evaluated. The proposed model is tested in a modified 18-bus system and in the Western Electricity Coordinating Council test system. Results demonstrate that with the deliverable SFR from PV, the system cost and the frequency reliability can be improved simultaneously. PV's SFR performance can be guaranteed with the proposed model.

14 SOLAR ENERGY↗

Vascular defense responses in rice: peroxidase accumulation in xylem parenchyma cells and xylem wall thickening

The rice bacterial blight pathogen Xanthomonas oryzae pv. oryzae is a vascular pathogen that elicits a defensive response through interaction with metabolically active rice cells. In leaves of 12-day-old rice seedlings, the exposed pit membrane separating the xylem lumen from the associated parenchyma cells allows contact with bacterial cells. During resistant responses, the xylem secondary walls thicken within 48 h and the pit diameter decreases, effectively reducing the area of pit membrane exposed for access by bacteria. In susceptible interactions and mock-inoculated controls, the xylem walls do not thicken within 48 h. Xylem secondary wall thickening is developmental and, in untreated 65-day-old rice plants, the size of the pit also is reduced. Activity and accumulation of a secreted cationic peroxidase, PO-C1, were previously shown to increase in xylem vessel walls and lumen. Peptide-specific antibodies and immunogold-labeling were used to demonstrate that PO-C1 is produced in the xylem parenchyma and secreted to the xylem lumen and walls. The timing of the accumulation is consistent with vessel secondary wall thickening. The PO-C1 gene is distinct but shares a high level of similarity with previously cloned pathogen-induced peroxidases in rice. PO-C1 gene expression was induced as early as 12 h during resistant interactions and peaked between 18 and 24 h after inoculation. Expression during susceptible interactions was lower than that observed in resistant interactions and was undetectable after infiltration with water, after mechanical wounding, or in mature leaves. These data are consistent with a role for vessel secondary wall thickening and peroxidase PO-C1 accumulation in the defense response in rice to X. oryzae pv. oryzae.

NASA Discipline Plant Biology↗

HOMP (Hybrid Operation and Maintenance Platform) [SWR-22-81]

The HOMP software module is contained within NREL's Hybrid Optimization and Performance Platform (HOPP) at this URL: https://github.com/NREL/HOPP/tree/feature/HOMP. HOMP is a python-based software module which can be used concurrently with the Hybrid Optimization and Performance Platform (HOPP) to model, simulate, and optimize degradation, reliability, and operations and maintenance of hybrid power plant components. The program currently models lithium ion battery, PEM electrolyzer, wind turbine, and solar PV array components, which enables users to understand the design and operation tradeoffs of hybrid power plants. For instance, HOMP enables users to answer questions like: how large does a battery bank need to be to achieve optimal charge/discharge rates for performance and reliability? How does plant design change for different objectives (e.g., profit versus resilience)? Under what conditions is it better to produce electricity versus hydrogen? How do we optimally control hybrid power plants to reduce downtime and increase performance?

Clark, Caitlyn↗

Advanced Models and Fast Simulation Algorithms for MARS Plants

With the successful commercialization of modular multilevel converters (MMC) and rapid increase in photovoltaic (PV) penetration and energy storage systems (ESS), one of the research areas being explored dynamically is integration of PV systems and ESS systems to MMCs. On this front, an integrated development of PV plants, ESS, and alternating- and direct-current (ac/dc) systems through Multi-Port Autonomous Reconfigurable Solar (MARS) plant is proposed and being researched upon. However, simulation of MARS systems on traditional existing software takes very long time (order of days) due to the presence of a large number of states and non-linear devices. Therefore, development of fast high fidelity models is of paramount importance to test the hardware design, control design and planning of power system expansions. In this context, two research objectives are addressed in this paper: firstly, an ultra fast single- or multi- CPU simulation algorithm to simulate the MARS system based on state-space models, hybrid discretization algorithm with a relaxation technique that reduces the imposed computational burden and a multi-rate method is presented. Secondly, a reduced order model of MARS is also presented. Both the developed techniques are validated with respect to reference PSCAD/EMTDC model.

Marthi, Phani Ratna Vanamali↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

A Hybrid Optimization and Deep Learning Algorithm for Cyber-Resilient DER Control

With the proliferation of distributed energy resources (DERs) in the distribution grid, it is a challenge to effectively control a large number of DERs resilient to the communication and security disruptions, as well as to provide the online grid services, such as voltage regulation and virtual power plant (VPP) dispatch. To this end, a hybrid feedback-based optimization algorithm along with deep learning forecasting technique is proposed to specifically address the cyber-related issues. The online decentralized feedback-based DER optimization control requires timely, accurate voltage measurement from the grid. However, in practice such information may not be received by the control center or even be corrupted. Therefore, the long short-term memory (LSTM) deep learning algorithm is employed to forecast delayed/missed/attacked messages with high accuracy. The IEEE 37-node feeder with high penetration of PV systems is used to validate the efficiency of the proposed hybrid algorithm. The results show that 1) the LSTM-forecasted lost voltage can effectively improve the performance of the DER control algorithm in the practical cyber-physical architecture; and 2) the LSTM forecasting strategy outperforms other strategies of using previous message and skipping dual parameter update.

cyber-resilient algorithm↗

Analysis of the Impurity MgOHCl in Molten Chloride Salts Toward its Electrochemical Removal from CSP Plants During Operation

The work presented here is a study of the impurity MgOHCl in molten chloride salts, toward the eventual goal of electrochemically removing it from operational molten-chloride-based concentrating solar power (CSP) plants.1,2 Implementation of molten chloride salts as a heat transfer fluid is among the most promising pathways for decreasing the levelized cost of energy (LCOE) of CSP systems because its high thermal stability allows higher operating temperatures, and thus, greater efficiency. However, this impurity - formed when MgCl2 salts are exposed to air and moisture - cause significant corrosion of containment alloys.1 Therefore, we have developed and validated in a laboratory setting: 1) a method for the formation of MgOHCl for controlled impurity spike in molten salt for its further sensing, evaluation, and reduction; 2) evaluated its diffusion in the molten salt, and 3) began assessing its electrochemical properties. Our findings allow us to propose solutions for efficiently and instantly removing MgOHCl from an operational CSP plant.

concentrated solar power↗

Genome-wide identification of novel flagellar motility genes in Pseudomonas syringae pv. tomato DC3000

Pseudomonas syringaepv.tomatoDC3000 (PstDC3000) is a plant pathogenic bacterium that possesses complicated motility regulation pathways including a typical chemotaxis system. A significant portion of our understanding about the genes functioning inPstDC3000 motility is based on comparison to other bacteria. This leaves uncertainty about whether gene functions are conserved, especially since specific regulatory modules can have opposite functions in sets ofPseudomonas. In this study, we used a competitive selection to enrich for mutants with altered swimming motility and used random barcode transposon-site sequencing (RB-TnSeq) to identify genes with significant roles in swimming motility. Besides many of the known or predicted chemotaxis and motility genes, our method identified PSPTO_0406 (dipA), PSPTO_1042 (chrR) and PSPTO_4229 (hypothetical protein) as novel motility regulators. PSPTO_0406 is a homolog ofdipA, a known cyclic di-GMP degrading enzyme inP. aeruginosa. PSPTO_1042 is part of an extracytoplasmic sensing system that controls gene expression in response to reactive oxygen species, suggesting that PSPTO_1042 may function as part of a mechanism that enablesPstDC3000 to alter motility when encountering oxidative stressors. PSPTO_4229 encodes a protein containing an HD-related output domain (HDOD), but with no previously identified functions. We found that deletion and overexpression of PSPTO_4229 both reduce swimming motility, suggesting that its function is sensitive to expression level. We used the overexpression phenotype to screen for nonsense and missense mutants of PSPTO_4229 that no longer reduce swimming motility and found a pair of conserved arginine residues that are necessary for motility suppression. Together these results provide a global perspective on regulatory and structural genes controlling flagellar motility inPstDC3000.

Microbiology↗