Search NASA⌕ Search

SEARCH · Search NASA

Results for “Partnership Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗

Micromobility Integrated Transit and Infrastructure for Efficiency (MITIE)

Nearly omnipresent in many cities of all sizes across the United States, micromobility vehicles-e-scooters, manual bicycles, e-bicycles, and larger seated electric scooters-are notably missing from SMART Mobility research. This project aims to expand the spectrum of modes currently being researched within SMART Mobility by exploring micromobility as an important tool toward meeting energy-efficient mobility goals. It expands on findings from SMART Mobility 1.0 that revealed preferences to reduce transportation-related expenses through use of a network of mobility-as-a-service (MaaS) and other shared mobility options, and builds on findings from a 2019 Vehicle Technology Analysis Program (VTAP) funded micromobility project conducted by our team. We will explore multiple facets of micromobility, including behavior and decision-making, the integration of micromobility within transportation infrastructure, energy estimates, and operations. Guiding research questions include: (1) What are the potential energy savings from low, medium, and high market penetration of micromobility (in passenger, multimodal, and freight domains)? (2) Which scenarios for micromobility use and related enablement of increased public transit use should be modeled/considered in the SMART 2.0 Workflow? (3) To what degree can micromobility supplement/complement transit system operations? (4) What are people's preferences towards micromobility? How do preferences vary across various sociodemographic segments? How can this knowledge inform operations? (5) What are optimal strategies to attain high user adoption and shift users toward more energy-efficient mode choices in terms of micromobility operation? How do these strategies affect energy savings, person-miles traveled, lifecycle energy use, and adoption rates? These questions will be addressed through applied research in five project emphasis areas: (1) Energy estimates of micromobility for Workflow scenarios: Expand and refine previous micromobility work to augment the Workflow approaches to modeling urban travel. (2) Multimodal connection with transit: Utilizing Mobility-Energy Productivity (MEP) tools to evaluate multimodal travel patterns enabled by micromobility, including assessing how to reduce barriers of inequity of access to mobility options and destinations. (3) Mode choice, induced demand, and infrastructure: Understanding the mode shift induced through micromobility to inform energy impact analysis. (4) Energy optimization of micromobility operations: Identification of micromobility operations parameters and development of operations scenarios to better understand present-day micromobility operations for integration into the Workflow, in partnership with BEAM and POLARIS modeling teams. (5) Micro-freight: Characterize the current state of micro-freight activities, including energy effects and geospatial analyses, to inform Workflow.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Micromobility Integrated Transit and Infrastructure for Efficiency (MITIE)

Nearly omnipresent in many cities of all sizes across the United States, micromobility vehicles-e-scooters, manual bicycles, e-bicycles, and larger seated electric scooters-are notably missing from SMART Mobility research. This project aims to expand the spectrum of modes currently being researched within SMART Mobility by exploring micromobility as an important tool toward meeting energy-efficient mobility goals. It expands on findings from SMART Mobility 1.0 that revealed preferences to reduce transportation-related expenses through use of a network of mobility-as-a-service (MaaS) and other shared mobility options, and builds on findings from a 2019 Vehicle Technology Analysis Program (VTAP) funded micromobility project conducted by our team. We will explore multiple facets of micromobility, including behavior and decision-making, the integration of micromobility within transportation infrastructure, energy estimates, and operations. Guiding research questions include: 1) what are the potential energy savings from low, medium, and high market penetration of micromobility (in passenger, multimodal, and freight domains)? 2) which scenarios for micromobility use and related enablement of increased public transit use should be modeled/considered in the SMART 2.0 Workflow? 3) to what degree can micromobility supplement/complement transit system operations? 4) what are people's preferences towards micromobility? How do preferences vary across various sociodemographic segments? How can this knowledge inform operations? 5) what are optimal strategies to attain high user adoption and shift users toward more energy-efficient mode choices in terms of micromobility operation? How do these strategies affect energy savings, person-miles traveled, lifecycle energy use, and adoption rates? These questions will be addressed through applied research in five project emphasis areas: 1) energy estimates of micromobility for Workflow scenarios: Expand and refine previous micromobility work to augment the Workflow approaches to modeling urban travel; 2) multimodal connection with transit: Utilizing Mobility-Energy Productivity (MEP) tools to evaluate multimodal travel patterns enabled by micromobility, including assessing how to reduce barriers of inequity of access to mobility options and destinations; 3) mode choice, induced demand, and infrastructure: Understanding the mode shift induced through micromobility to inform energy impact analysis; 4) energy optimization of micromobility operations: Identification of micromobility operations parameters and development of operations scenarios to better understand present-day micromobility operations for integration into the Workflow, in partnership with BEAM and POLARIS modeling teams; 5) micro-freight: Characterize the current state of micro-freight activities, including energy effects and geospatial analyses, to inform Workflow.

ADVANCED PROPULSION SYSTEMS↗

Validation of Space Weather Models at Community Coordinated Modeling Center

The Community Coordinated Modeling Center (CCMC) is a multiagency partnership, which aims at the creation of next generation space weather modes. CCMC goal is to support the research and developmental work necessary to substantially increase space weather modeling capabilities and to facilitate advanced models deployment in forecasting operations. The CCMC conducts unbiased model testing and validation and evaluates model readiness for operational environment. The presentation will demonstrate the recent progress in CCMC metrics and validation activities.

Kuznetsova, M. M.↗

Upscaling Methods Applied to a Fine-Scale Reservoir Model

This study was conducted as part of the Southwest Regional Partnership on Carbon Sequestration (SWP) project to evaluate how upscaling fine-scale simulation models to coarse-scale simulation models impacted the results. The focus was on the Farnsworth Unit (FWU) and its Morrow' B' Sandstone reservoir, specifically the west half of the field. Due to data limitations and the geologic characteristics of the surrounding area, the upscaling was limited to the west half of the FWU rather than a broader basinscale model. The primary aim was to explore how upscaling impacts numerical simulation models, particularly regarding CO 2 -enhanced oil recovery (EOR) and storage capacity predictions. Upscaling was necessary to reduce computational demands when transitioning from high-resolution geological models to coarser grids, as large-scale simulations with finer grids can be computationally prohibitive. This study expands on previous work by the SWP to understand how additional upscaling, applied to already fine-scale numerical simulation models, affects reservoir performance simulations (Ampomah, Balch, & Grigg, 2015). This is key to understanding how loss of resolution can affect coarsescale model results that may be used for large sensitivity analyses, uncertainty quantifications, and training data for machine learning applications.

02 PETROLEUM↗

Payload Planning for the International Space Station

A review of the evolution of the International Space Station (ISS) was performed for the purpose of understanding the project objectives. It was requested than an analysis of the current Office of Space Access and Technology (OSAT) Partnership Utilization Plan (PUP) traffic model be completed to monitor the process through which the scientific experiments called payloads are manifested for flight to the ISS. A viewing analysis of the ISS was also proposed to identify the capability to observe the United States Laboratory (US LAB) during the assembly sequence. Observations of the Drop-Tower experiment and nondestructive testing procedures were also performed to maximize the intern's technical experience. Contributions were made to the meeting in which the 1996 OSAT or Code X PUP traffic model was generated using the software tool, Filemaker Pro. The current OSAT traffic model satisfies the requirement for manifesting and delivering the proposed payloads to station. The current viewing capability of station provides the ability to view the US LAB during station assembly sequence. The Drop Tower experiment successfully simulates the effect of microgravity and conveniently documents the results for later use. The non-destructive test proved effective in determining stress in various components tested.

Johnson, Tameka J.↗

Digital Earth Initiative: A Joint Interagency Program

The Digital Earth is a virtual representation of our planet that enables a person to explore and interact with the vast amounts of natural and cultural information gathered about the Earth. The Digital Earth comprises data interfaces and standards enabling access to geo-referenced data from remote sensing, cartographic, demographic, medical, and other sources to respond to questions posed by the user. In a recent address at the California Science Center in Los Angeles, Vice President Al Gore articulated a Digital Earth Vision. That vision spoke to developing a multi-resolution, three-dimensional representation of the planet, into which we can roam and zoom into vast quantities of embedded geo-referenced data. The vision was not limited to moving through space but also allowing travel over a time-line, which can be set for days, years, centuries, or even geological epochs. As prototypes become available, it would also be possible to interact with the Digital Earth in multiple places around the country with access to high-speed networks and at a more limited level of access over the Internet. NASA was asked by the Vice President to lead an interagency initiative that would take steps to bring this vision to the public. This talk describes the start-up and plans of the Digital Earth Interagency Working Group in the formulation of its charter, an architecture reference model for Digital Earth, public/private partnerships, cooperative agreement notices, Digital Earth prototypes, and testbeds. Animations employing technologies for virtual roaming and zooming through multi-resolution satellite data set as prototype systems will be presented along with examples of potential user scenarios. Plans for engaging academia and industry in implementing the Digital Earth initiative will be discussed.

Halem, Milton↗

More Than A SketchUp

This 2014 summer internship assignment at John F. Kennedy Space Center (K.S.C) was conducted with the National Aeronautics and Space Administration (NASA) Engineering and Technology (NE) group in support of the Control and Data Systems Division (NE-C) within the Test, Operations & Support Software Engineering Branch (NE-C2). The primary focus of this project was to assist Branch Chief Laurie B. Griffin, to support NASA's Small Payload Launch Integrated Testing Services (SPLITS) mission, by mastering the capabilities of 3-D modeling software called SketchUp. I used SketchUp to create a virtual environment for different laboratories of the NE-00 Division. My mission was to have these models uploaded into a K.S.C Partnerships Website and be used as a visual aid to viewers who browsed the site. The leads of this project were Kay L. Craig, Business and Industry Specialist (AD-A) and Steven E. Cain, (FA-C). I teamed with fellow intern Tait Sorenson of the Flight Structures and Thermal Protection Systems Branch (NE-M5) and met with many K.S.C lab managers willing to display their lab's structure and capabilities. The information collected during these lab tours was vital to the building of the K.S.C Partnerships Website. To accomplish this goal Sorenson and I later teamed with fellow Marketing intern Marlee Pereda-Ramos, of the Spaceport Planning Office In Center Planning And Development (AD-A) Along with Ramos, Tait and I toured an array of laboratories and got first hand exposure to their functions and capabilities.

Trimble Corporation↗

NASA’s and ESA’s Tracking Networks, A Decade of Strategic Partnership for Solar System Exploration

Planetary missions travel vast distances in the Solar System for valuable scientific exploration. Spacecraft return data to Earth via radio links that suffer power losses inversely proportional to the square of the distance, which forms a tremendous engineering challenge compounded by relatively low onboard transmitter power, typically 20 Watts at X-band (~8 GHz). Deep space missions are enabled only because leading space agencies invested in developing very large communications antennas as well as provided a sophisticated suite of tracking, telemetry and command standard services. NASA’s Deep Space Network and ESA’s ESTRACK network are distributed geographically to provide global coverage and utilize stations ranging in size from 34 meters to 70 meters in diameter. Over time, the expanding number of missions, increased requirements for redundancy during critical events as well as the drive for improved navigation accuracy via long-baseline interferometric techniques, increased the networks’ loading and strongly motivated collaboration between the two agencies. Ten years ago, NASA and ESA established a cross-support agreement in addition to multiple on-going mission-specific agreements to meet this need. This strategic partnership was enabled by the development of international inter-operability technical standards and compatible spectrum usage. Over recent years, many critical events were supported via these agreements and some scientific breakthroughs were enabled. A multi-nation tracking contention period envisioned in the near future will also benefit from this partnership. Due to its success over the last decade, the DSN-ESTRACK partnership is serving as a model for other agencies with deep space communication facilities and similar interest. This paper reviews the benefits and lessons learned from collaborative deep space exploration, especially via communications networks, and discusses the potential implementation of similar NASA agreements with other space agencies.

Costrell, Jim↗

Space Weather Models, Tools and Services at the Community Coordinated Modeling Center

The Community Coordinated Modeling center (CCMC) is a multi-agency partnership to support the research and developmental work necessary to substantially increase space weather modeling capabilities and to facilitate advanced models deployment in forecasting operations. The CCMC conducts unbiased model testing and validation and evaluates model readiness for operational environment. Space weather models and coupled model chains hosted at the CCMC range from the solar corona to the Earth's upper atmosphere. CCMC has developed a number of real-time modeling systems, as well as a large number of modeling and data products tailored to address the space weather needs of NASA's robotic missions. The presentation will demonstrate the rapid progress towards development the system allowing using products derived from space weather models in applications associated with National Space Weather needs. The adaptable Integrated Space Weather Analysis (ISWA) System developed at CCMC for NASA-relevant space weather information combines forecasts based on advanced space weather models hosted at CCMC with concurrent space environment information. The system is also enabling post-impact analysis and flexible dissemination of space weather information.

Kuznetsova, M. M.↗

Validation of Space Weather Models at Community Coordinated Modeling Center

The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership to support the research and developmental work necessary to substantially increase space weather modeling capabilities and to facilitate advanced models deployment in forecasting operations. Space weather models and coupled model chains hosted at the CCMC range from the solar corona to the Earth's upper atmosphere. CCMC has developed a number of real-time modeling systems, as well as a large number of modeling and data products tailored to address the space weather needs of NASA's robotic missions. The CCMC conducts unbiased model testing and validation and evaluates model readiness for operational environment. CCMC has been leading recent comprehensive modeling challenges under GEM, CEDAR and SHINE programs. The presentation will focus on experience in carrying out comprehensive and systematic validation of large sets of. space weather models

Kuznetsova, M. M.↗

Access Innovation (Final)

Over the past two years, with the support of the Department of Energy, Powerhouse developed and launched Access Innovation, a partnership program to better connect clean energy startups with industry and investors for partnership. The program has successfully exceeded the objectives of the grant to pilot and validate successful methods of facilitating partnerships between early stage clean energy companies and industry and investors, secure follow on partnerships for early stage clean energy startups in the form of investment, pilot projects, new advisors, customer agreements, and joint development agreements and to track metrics, analyze, draft findings and distribute lessons on what models are most effective in forming partnerships to inform other organizational best practices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lunar COTS: Using the Moon's Resources to Enable An Economical and Sustainable Pathway to Mars and Beyond

To support NASAs goal of sending humans to Mars, a new plan was constructed to develop and demonstrate cislunar capabilities and services in partnership with commercial industry using the well-proven Commercial Orbital Transportation Services (COTS) Program acquisition model. The NASA COTS Program was a very successful program that developed and demonstrated cost-effective commercial cargo transportation services to the International Space Station (ISS). As a result of NASAs COTS program, two new launch vehicles and spacecraft were developed and have been successfully performing cargo transportation missions to the ISS since 2012. The COTS acquisition strategy utilized a new model than normally accepted in traditional procurement practices. This new model used Space Act Agreements where NASA entered into partnerships with industry to jointly share cost, development and operational risks to demonstrate new capabilities for mutual benefit. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs, as much as tenfold, while industry partners successfully expanded their market share of the global launch transportation business for significant economic benefit. Using the COTS acquisition model as a basis, a new plan, notionally referred to as Lunar Commercial Orbital Transfer Services (or Lunar COTS), has been developed to determine the potential benefits and challenges of a new Lunar COTS plan[1]. The proposed plan includes low-cost, commercial-enabled missions to prospect for resources, determine the economic viability of extracting those resources and assess the value proposition of using these resources in future exploration architectures such as Mars. These missions would be accomplished in partnership with industry to meet these exploration goals but will also have the capability to carry payloads to meet science goals as well.

Zuniga, Allison↗

Transitioning Enhanced Land Surface Initialization and Model Verification Capabilities to the Kenya Meteorological Department (KMD)

Flooding, severe weather, and drought are key forecasting challenges for the Kenya Meteorological Department (KMD), based in Nairobi, Kenya. Atmospheric processes leading to convection, excessive precipitation and/or prolonged drought can be strongly influenced by land cover, vegetation, and soil moisture content, especially during anomalous conditions and dry/wet seasonal transitions. It is thus important to represent accurately land surface state variables (green vegetation fraction, soil moisture, and soil temperature) in Numerical Weather Prediction (NWP) models. The NASA SERVIR and the Short-term Prediction Research and Transition (SPoRT) programs in Huntsville, AL have established a working partnership with KMD to enhance its regional modeling capabilities. SPoRT and SERVIR are providing experimental land surface initialization datasets and model verification capabilities for capacity building at KMD. To support its forecasting operations, KMD is running experimental configurations of the Weather Research and Forecasting (WRF; Skamarock et al. 2008) model on a 12-km/4-km nested regional domain over eastern Africa, incorporating the land surface datasets provided by NASA SPoRT and SERVIR. SPoRT, SERVIR, and KMD participated in two training sessions in March 2014 and June 2015 to foster the collaboration and use of unique land surface datasets and model verification capabilities. Enhanced regional modeling capabilities have the potential to improve guidance in support of daily operations and high-impact weather and climate outlooks over Eastern Africa. For enhanced land-surface initialization, the NASA Land Information System (LIS) is run over Eastern Africa at ~3-km resolution, providing real-time land surface initialization data in place of interpolated global model soil moisture and temperature data available at coarser resolutions. Additionally, real-time green vegetation fraction (GVF) composites from the Suomi-NPP VIIRS instrument is being incorporated into the KMD-WRF runs, using the product generated by NOAA/NESDIS. Model verification capabilities are also being transitioned to KMD using NCAR's Model *Corresponding author address: Jonathan Case, ENSCO, Inc., 320 Sparkman Dr., Room 3008, Huntsville, AL, 35805. Email: Jonathan.Case-1@nasa.gov Evaluation Tools (MET; Brown et al. 2009) software in conjunction with a SPoRT-developed scripting package, in order to quantify and compare errors in simulated temperature, moisture and precipitation in the experimental WRF model simulations. This extended abstract and accompanying presentation summarizes the efforts and training done to date to support this unique regional modeling initiative at KMD. To honor the memory of Dr. Peter J. Lamb and his extensive efforts in bolstering weather and climate science and capacity-building in Africa, we offer this contribution to the special Peter J. Lamb symposium. The remainder of this extended abstract is organized as follows. The collaborating international organizations involved in the project are presented in Section 2. Background information on the unique land surface input datasets is presented in Section 3. The hands-on training sessions from March 2014 and June 2015 are described in Section 4. Sample experimental WRF output and verification from the June 2015 training are given in Section 5. A summary is given in Section 6, followed by Acknowledgements and References.

land surface modeling↗

Roadmap on multiscale materials modeling

Modeling and simulation is transforming modern materials science, becoming an important tool for the discovery of new materials and material phenomena, for gaining insight into the processes that govern materials behavior, and, increasingly, for quantitative predictions that can be used as part of a design tool in full partnership with experimental synthesis and characterization. Modeling and simulation is the essential bridge from good science to good engineering, spanning from fundamental understanding of materials behavior to deliberate design of new materials technologies leveraging new properties and processes. This Roadmap presents a broad overview of the extensive impact computational modeling has had in materials science in the past few decades, and offers focused perspectives on where the path forward lies as this rapidly expanding field evolves to meet the challenges of the next few decades. The Roadmap offers perspectives on advances within disciplines as diverse as phase field methods to model mesoscale behavior and molecular dynamics methods to deduce the fundamental atomic-scale dynamical processes governing materials response, to the challenges involved in the interdisciplinary research that tackles complex materials problems where the governing phenomena span different scales of materials behavior requiring multiscale approaches. The shift from understanding fundamental materials behavior to development of quantitative approaches to explain and predict experimental observations requires advances in the methods and practice in simulations for reproducibility and reliability, and interacting with a computational ecosystem that integrates new theory development, innovative applications, and an increasingly integrated software and computational infrastructure that takes advantage of the increasingly powerful computational methods and computing hardware.

36 MATERIALS SCIENCE↗

RAAW

High-fidelity wind turbine modeling advances necessitate model validation datasets of equally high fidelity. The Rotor Aerodynamics, Aeroelastics & Wake (RAAW) project was designed to address this need. This three-year project runs from October 2021 through October 2024 starting with a field data collection period followed by model validation activities. RAAW is a partnership between GE Renewable Energy and the United States Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories. The field experiment is designed to make detailed measurements of the inflow, wind turbine response, and the resulting wake. The experimental dataset will be suitable for validating wind turbine models across the fidelity spectrum from actuator disk methods to blade-resolved codes.

17 WIND ENERGY↗

Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site

Regulatory oversight of a geologic carbon sequestration (GCS) project relies on iterative estimations, throughout the project lifetime, of the area where increased risks to underground sources of drinking water (USDWs) may occur due to injection of CO2. This area, referred to as Area of Review (AoR), is typically delineated by predicting the migration of fluid between the reservoir and the lowermost USDW via an open wellbore using predictions from physics-based reservoir simulators. The inherent uncertainty in input parameters used in reservoir modeling therefore affects the accuracy of determining the AoR for a project. Furthermore, the standard analytical approaches for calculating a critical pressure to delineate the risk area yield an infinite AoR for cases where the injection reservoir is overpressured relative to the USDW. A methodology is presented in this paper to better characterize the risk to USDWs while accounting for the uncertainty in reservoir modeling, with an application to a permitted GCS project with an overpressured injection formation, FutureGen 2.0. The methodology is demonstrated using the National Risk Assessment Partnership’s open-source integrated assessment model (NRAP-Open-IAM) to develop a probabilistic estimate of impact risk to USDW quality. CO2 and pressure predictions from the reservoir modeling conducted using the STOMP-CO2 simulator for the FutureGen 2.0 site are used in a NRAP-Open-IAM model with reservoir, wellbore, and aquifer components to: (1) assess the extent of potential leakage into the USDW for the predicted reservoir pressure conditions; (2) evaluate the extent of potential impact using “no-net-degradation” thresholds; and (3) account for uncertainty in reservoir permeabilities.

03 NATURAL GAS↗

Toward Improved Land Surface Initialization in Support of Regional WRF Forecasts at the Kenya Meteorological Service (KMS)

Flooding and drought are two key forecasting challenges for the Kenya Meteorological Service (KMS). Atmospheric processes leading to excessive precipitation and/or prolonged drought can be quite sensitive to the state of the land surface, which interacts with the planetary boundary layer (PBL) of the atmosphere providing a source of heat and moisture. The development and evolution of precipitation systems are affected by heat and moisture fluxes from the land surface, particularly within weakly-sheared environments such as in the tropics and sub-tropics. These heat and moisture fluxes during the day can be strongly influenced by land cover, vegetation, and soil moisture content. Therefore, it is important to represent the land surface state as accurately as possible in land surface and numerical weather prediction (NWP) models. Enhanced regional modeling capabilities have the potential to improve forecast guidance in support of daily operations and high-impact weather over eastern Africa. KMS currently runs a configuration of the Weather Research and Forecasting (WRF) NWP model in real time to support its daily forecasting operations, making use of the NOAA/National Weather Service (NWS) Science and Training Resource Center's Environmental Modeling System (EMS) to manage and produce the KMS-WRF runs on a regional grid over eastern Africa. Two organizations at the NASA Marshall Space Flight Center in Huntsville, AL, SERVIR and the Shortterm Prediction Research and Transition (SPoRT) Center, have established a working partnership with KMS for enhancing its regional modeling capabilities through new datasets and tools. To accomplish this goal, SPoRT and SERVIR is providing enhanced, experimental land surface initialization datasets and model verification capabilities to KMS as part of this collaboration. To produce a land-surface initialization more consistent with the resolution of the KMS-WRF runs, the NASA Land Information System (LIS) is run at a comparable resolution to provide real-time, daily soil initialization data in place of data interpolated from the National Centers for Environmental Prediction (NCEP) Global Forecast System (GFS) model soil moisture and temperature fields. Additionally, realtime green vegetation fraction (GVF) data from the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (Suomi- NPP) satellite will be incorporated into the KMS-WRF runs, once it becomes publicly available from the National Environmental Satellite Data and Information Service (NESDIS). Finally, model verification capabilities will be transitioned to KMS using the Model Evaluation Tools (MET; Brown et al. 2009) package in conjunction with a dynamic scripting package developed by SPoRT (Zavodsky et al. 2014), to help quantify possible improvements in simulated temperature, moisture and precipitation resulting from the experimental land surface initialization. Furthermore, the transition of these MET tools will enable KMS to monitor model forecast accuracy in near real time. This paper presents preliminary efforts to improve land surface model initialization over eastern Africa in support of operations at KMS. The remainder of this extended abstract is organized as follows: The collaborating organizations involved in the project are described in Section 2; background information on LIS and the configuration for eastern Africa is presented in Section 3; the WRF configuration used in this modeling experiment is described in Section 4; sample experimental WRF output with and without LIS initialization data are given in Section 5; a summary is given in Section 6 followed by acknowledgements and references.

Case, Johnathan L.↗