Search NASA⌕ Search

SEARCH · Search NASA

Results for “Payload developer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

Anastasia Ford↗

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power↗

On-Board Training for US Payloads

The International Space Station (ISS) crew follows a training rotation schedule that puts them in the United States about every three months for a three-month training window. While in the US, the crew receives training on both ISS systems and payloads. Crew time is limited, and system training takes priority over payload training. For most flights, there is sufficient time to train all systems and payloads. As more payloads are flown, training time becomes a more precious resource. Less training time requires payload developers (PDs) to develop alternatives to traditional ground training. To ensure their payloads have sufficient training to achieve their scientific goals, some PDs have developed on-board trainers (OBTs). These OBTs are used to train the crew when no or limited ground time is available. These lessons are also available on-orbit to refresh the crew about their ground training, if it was available. There are many types of OBT media, such as on-board computer based training (OCBT), video/photo lessons, or hardware simulators. The On-Board Training Working Group (OBTWG) and Courseware Development Working Group (CDWG) are responsible for developing the requirements for the different types of media.

Murphy, Benjamin↗

Acoustic Noise Prediction of the Amine Swingbed ISS ExPRESS Rack Payload

Acoustics plays a vital role in maintaining the health, safety, and comfort of crew members aboard the International Space Station (ISS). In order to maintain this livable and workable environment, acoustic requirements have been established to ensure that ISS hardware and payload developers account for the acoustic emissions of their equipment and develop acoustic mitigations as necessary. These requirements are verified by an acoustic emissions test of the integrated hardware. The Amine Swingbed ExPRESS (Expedite the PRocessing of ExperimentS to Space) rack payload creates a unique challenge to the developers in that the payload hardware is transported to the ISS in phases, making an acoustic emissions test on the integrated flight hardware impossible. In addition, the payload incorporates a high back pressure fan and a diaphragm vacuum pump, which are recognized as significant and complex noise sources. In order to accurately predict the acoustic emissions of the integrated payload, the individual acoustic noise sources and paths are first characterized. These characterizations are conducted though a series of acoustic emissions tests on the individual payload components. Secondly, the individual acoustic noise sources and paths are incorporated into a virtual model of the integrated hardware. The virtual model is constructed with the use of hybrid method utilizing the Finite Element Acoustic (FEA) and Statistical Energy Analysis (SEA) techniques, which predict the overall acoustic emissions. Finally, the acoustic model is validated though an acoustic characterization test performed on an acoustically similar mock-up of the flight unit. The results of the validated acoustic model are then used to assess the acoustic emissions of the flight unit and define further acoustic mitigation efforts.

Welsh, David↗

ASK Talks with Dennis Grounds

Dennis Grounds recently finished a one-year assignment at NASA Headquarters in the Office of Bioastronautics as the Acting Flight Program Manager He has returned to Johnson Space Center (JSC), where he is Director of the International Space Station Bioastronautics Research Program Office with the NASA Life Sciences Projects Division. Under his management, the Human Research Facility (HRF) was developed to support a broad range of scientific investigations pertaining to human adaptation to the spaceflight environment and issues of human space exploration. The HRF rack was developed to international standards in order to be compatible with payloads developed anywhere in the world, thereby streamlining the process of getting payloads on the Space Station. Grounds has worked with NASA for more than 15 years. Prior to joining ISS, he worked with General Electric as a manager of payloads and analysis in support of the NASA Life Science Projects Division at JSC. ASK spoke with Grounds in Washington, D.C., during his Headquarters assignment.

Source record↗

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.

Thompson, Sean W.↗

MPLM On-Orbit Interface Dynamic Flexibility Modal Test

Now that the International Space Station (ISS) is being constructed, payload developers have to not only verify the Shuttle-to-payload interface, but also the interfaces their payload will have with the ISS. The Multi Purpose Logistic Module (MPLM) being designed and built by Alenia Spazio in Torino, Italy is one such payload. The MPLM is the primary carrier for the ISS Payload Racks, Re-supply Stowage Racks, and the Resupply Stowage Platforms to re-supply the ISS with food, water, experiments, maintenance equipment and etc. During the development of the MPLM there was no requirement for verification of the on-orbit interfaces with the ISS. When this oversight was discovered, all the dynamic test stands had already been disassembled. A method was needed that would not require an extensive testing stand and could be completed in a short amount of time. The residual flexibility testing technique was chosen. The residual flexibility modal testing method consists of measuring the free-free natural frequencies and mode shapes along with the interface frequency response functions (FRF's). Analytically, the residual flexibility method has been investigated in detail by, MacNeal, Martinez, Carne, and Miller, and Rubin, but has not been implemented extensively for model correlation due to difficulties in data acquisition. In recent years improvement of data acquisition equipment has made possible the implementation of the residual flexibility method as in Admire, Tinker, and Ivey, and Klosterman and Lemon. The residual flexibility modal testing technique is applicable to a structure with distinct points (DOF) of contact with its environment, such as the MPLM-to-Station interface through the Common Berthing Mechanism (CBM). The CBM is bolted to a flange on the forward cone of the MPLM. During the fixed base test (to verify Shuttle interfaces) some data was gathered on the forward cone panels. Even though there was some data on the forward cones, an additional modal test was performed to better characterize its behavior. The CBM mounting flange is the only remaining structure of the MPLM that no test data was available. This paper discusses the implementation of the residual flexibility modal testing technique on the CBM flange and the modal test of the forward cone panels.

Bookout, Paul S.↗

ISS Plug-in Plan (IPiP) 101

The ISS Plug-in Plan (IPiP) Team coordinates and develops an integrated plug-in plan each Increment for Payload and Systems hardware that connects downstream of a UOP or SUP. This presentation is to familiarize Payload Developers with the processes and forms used by IPiP.

plug-in↗

Fast Coupled Loads Analysis Method: Norton-Thevenin Receptance Coupling

A new method called Norton-Thevenin Receptance Coupling (NTRC) has been developed to perform coupled loads analysis (CLA). NTRC provides a tool that payload developers can use to obtain launch loads at a fraction of the cost of a CLA any time it is required in the payload design cycle. NTRC combines the frequency domain component coupling method of Receptance Coupling with the Norton and Thevenin theory used in force limiting to derive an alternate method for performing CLA.

Coupled Loads Analysis↗

A Unique Power System For The ISS Fluids And Combustion Facility

Unique power control technology has been incorporated into an electrical power control unit (EPCU) for the Fluids and Combustion Facility (FCF). The objective is to maximize science throughput by providing a flexible power system that is easily reconfigured by the science payload. Electrical power is at a premium on the International Space Station (ISS). The EPCU utilizes advanced power management techniques to maximize the power available to the FCF experiments. The EPCU architecture enables dynamic allocation of power from two ISS power channels for experiments. Because of the unique flexible remote power controller (FRPC) design, power channels can be paralleled while maintaining balanced load sharing between the channels. With an integrated and redundant architecture, the EPCU can tolerate multiple faults and still maintain FCF operation. It is important to take full advantage of the EPCU functionality. The EPCU acts as a buffer between the experimenter and the ISS power system with all its complex requirements. However, FCF science payload developers will still need to follow guidelines when designing the FCF payload power system. This is necessary to ensure power system stability, fault coordination, electromagnetic compatibility, and maximum use of available power for gathering scientific data.

Fox, David A.↗

Interpreting the International Space Station Microgravity Environment

The International Space Station (ISS) serves as a platform for microgravity research for the foreseeable future. A microgravity environment is one in which the effects of gravity are drastically reduced which then allows physical experiments to be conducted without the overpowering effects of gravity. A physical environment with very low-levels of acceleration and vibration has been accomplished by both the free fall associated with orbital flight and the design of the International Space Station. The International Space Station design has been driven by a long-standing, high-level requirement for a microgravity mode of operation. The Space Acceleration Measurement System has been in operation for nearly four years on the ISS measuring the microgravity environment in support of principal investigators and to characterize the ISS microgravity environment. The Principal Investigator Microgravity Services project functions as a detective to ascertain the source of disturbances seen in the ISS microgravity environment to allow correlation between that environment and experimental data. Payload developers need to predict the microgravity environment that will be imposed upon an experiment and ensure that the science and engineering requirements will be met. The Principal Investigator Microgravity Services project is developing n interactive tool to predict the microgravity environment at science payloads based on user defined operational scenarios. These operations (predictions and post-analyses) allow a researcher to examine the microgravity acceleration levels expected to exist when their experiment is operated and then receive an analysis of the environment which existed during their experiment operations. Presented in this paper will be descriptions of the environment predictive tool and an investigation into a previously unknown disturbance in the ISS microgravity environment.

DeLombard, Richard↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

A Year of Progress: NASA's Space Launch System Approaches Critical Design Review

NASA's Space Launch System (SLS) made significant progress on the manufacturing floor and on the test stand in 2014 and positioned itself for a successful Critical Design Review in mid-2015. SLS, the world's only exploration-class heavy lift rocket, has the capability to dramatically increase the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique high-value national payloads. Development now is focused on configuration with 70 metric tons (t) of payload to low Earth orbit (LEO), more than double the payload of the retired Space Shuttle program or current operational vehicles. This "Block 1" design will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the Moon and back and the first crewed flight around the Moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has successfully completed its Critical Design Review and now has hardware in production or testing. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. The SLS Program is currently working toward vehicle Critical Design Review in mid-2015. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record↗

Space research and Spartan

For a number of years, space research has been primarily conducted with sounding rockets and orbiting satellites. The use of satellites has disadvantages related to cost and the long lead time from design to launch, while a drawback in the case of sounding rockets is the short flight time of only a few minutes. The development of the Shuttle led to the proposal to employ for space research an autonomous free-flying payload deployed and recovered by the Shuttle. The proposed payload, called SPEAR (Small Payload Ejection and Recovery), looked very much like a rocket payload. Subsequently, the payload developed into a more compact form, and its name became Spartan-1. Attention is given to the demands of space research, the Spartan-1 payload, the payload functional control system, the thermal control system, the Spartan-1 mission, and the future of Spartan.

Cruddace, R. G.↗

Implementing Ethernet Services on the Payload Executive Processor (PEP)

The Ethernet interface is more common and easier interface to implement for payload developers already familiar with Ethernet protocol in their labs. The Ethernet interface allows for a more distributed payload architecture. Connections can be placed in locations not serviced by the PEP 1553 bus. The Ethernet interface provides a new access port into the PEP so as to use the already existing services. Initial capability will include a subset of services with a plan to expand services later.

Pruett, David↗

A new sounding rocket payload for solar plasma studies

A sounding rocket payload developed for studies of high-temperature plasmas associated with solar active regions and flares is described. The payload instruments will record both spectra and images in the UV, EUV, and soft X-ray regions of the spectrum. The instruments, including the Dual Range Spectrograph, the Flat Field Soft X-ray Spectrograph, the Normal Incidence Soft X-ray Imager, the UV Filtergraph, and the H-alpha Imaging system, are described. Attention is also given to the new structural system of the payload, based on a large optical table suspended within the payload cavity, which will support the optical elements in their correct positions and orientations and will maintain these alignments throughout the rocket launch environment.

Bruner, Marilyn E.↗