Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

BaO/Al 2 O 3 /NiAl(110) Model NO x Storage Materials. The effect of BaO film thickness on the amorphous-to-crystalline Ba(NO 3 ) 2 phase transition

The reaction of NO 2 with BaO (0.15 – 2 ML and > 30 ML)/Al 2 O 3 (12 ML)/NiAl(110) model NO x storage materials was studied. A thick (~12 ML), ordered Al 2 O 3 film was prepared as the support oxide on a NiAl(110) substrate in order to minimize the effect of the intermixing between the two oxide phases (BaO and Al 2 O 3 ) on the NO x chemistry of BaO. The growth of a thick alumina film, prepared by atomic oxygen deposition onto NiAl(110), follows a layer-by-layer growth mode and the resulting film is much more stable when exposed to NO 2 than the ultra-thin alumina films studied before. The interaction of NO 2 with the model NOx storage systems at low coverages of BaO show fundamentally different behaviors from a thick BaO film, as nitrite species form at low exposures of NO 2 , followed by nitrate formation at high NO 2 exposures. In contrast, on the thick BaO layer nitrite-nitrate ion pairs form at 300 K under UHV conditions (PNO 2 ~ 1 x 10 -9 Torr). However, at elevated NO 2 pressures (≥ 1 x 10 -5 Torr) the thick BaO film is gradually converted into amorphous Ba(NO 3 ) 2 at 300 K. Raising the temperature of the samples with ΘBaO > 1 ML after NO 2 exposure (in the absence of gas phase NO 2 ) leads to the phase transformation of the amorphous Ba(NO 3 ) 2 layer into crystalline Ba(NO 3 ) 2 particles in the temperature range of 500 – 600 K. No phase transformation is observed in samples with ΘBaO < 1 ML.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Experimental Evaluation of Refrigerant Leak Characteristics for Different HVAC&R Equipment Types–Phase 2

The US Department of Energy (DOE) Building Technology Office (BTO) and the Air-conditioning, Heating & Refrigeration Technology Institute (AHRTI) collaborated to sponsor an experimental study of refrigerant leak characteristics at Oak Ridge National Laboratory (ORNL); AHRTI project 9012. The project has been conducted in two phases with objectives to conduct refrigerant leak tests on several heating, ventilating, air-conditioning and refrigeration (HVAC&R) systems under operating conditions representative of actual applications to document the pressure decay rate and the mass flow rate of leaked refrigerant as a function of time. Phase 1 of the project ran from late 2017 to late 2018 with refrigerant leaks imposed on five systems and the collection of data to meet the project objectives. Systems chosen covered three air-conditioning (AC) applications (packaged terminal AC or PTAC, 3-ton residential split system AC, and 5-ton packaged rooftop AC) and two refrigeration applications (split system unit cooler, and standalone display case). AHRTI members donated the test systems used for the project. The systems were tested at two different leak rates (catastrophic high rate simulating full line break and a lower flow rate), two leak locations (high-pressure side and low-pressure side), and two operating conditions (compressor ON or OFF). Phase 1 results were summarized in a project report by Baxter, et al. (2019)1. The leak rates imposed in Phase 1 led to much more rapid charge releases than the more typical much slower rates seen in practice that would take days, weeks, or months to empty a system of its entire charge. For Phase 2, the project sponsors asked that the “higher” leak rate target a total charge release time of about 4 min. This was intended to represent a “reasonable” worst case release scenario to match the refrigerant leak rate assumption used in the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 (2016 version [IEC 2016]. A charge release time of about 20–40 min (leak release rate 5 to 10 times lower than higher rate) was targeted for the “lower” leak rate. This report provides a summary of the Phase 2 effort. Two additional HVAC systems were selected for testing in this phase. First was a multi-split air-conditioning (MS-AC) system with one outdoor section and two indoor units and a nameplate refrigerant charge of 1.75 kg (3.86 lb.) of R-410A. The MS-AC was tested in cooling only or AC operation. Second was a split system heat pump coupled to two different representative supply duct systems (HP-duct) and a nameplate charge of 3.83 kg (8.44 lb.) of R-410A. This system was tested in both space heating and AC modes. As in Phase 1 of the project, all tests were conducted using R-410A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Abstract Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state‐of‐the‐art knowledge in an internally self‐consistent modeling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain‐specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low‐emissions SSP1‐1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850–1900, using an observationally based historical warming estimate of 0.8°C between 1850–1900 and 1995–2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above preindustrial in the long‐term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

54 ENVIRONMENTAL SCIENCES↗

Influencing mechanism of pre-existing nanoscale Al 5 Fe 2 phase on Mg–Fe interface in friction stir spot welded Al-free ZK60–Q235 joint

Al-free ZK60 magnesium (Mg) alloy sheet was selected as substrate material of Mg–steel pinless friction stir spot welding (FSSW), avoiding the effect of the Al element in the substrate on the alloying reaction of Mg-iron (Fe) interface. The sound FSSW joint of ZK60 Mg alloy and Q235 steel with a hot-dipped aluminum (Al)-containing zinc (Zn) coating was successfully realized. The detailed microstructural examinations proved that Al 5 Fe 2 phase at the Mg-Fe interface came from the pre-existing Al 5 Fe 2 phase in the coating and acted as the transition layer for promoting the metallurgical bonding of Mg and Fe. The interfaces with well-matched lattice sites among Fe, Al 5 Fe 2 and Mg were formed during FSSW. A low energy interface with good match of lattice sites ((002) Al5Fe2 //(110) Fe , [110] Al5Fe2 //[13] Fe ) between Al 5 Fe 2 and Fe was identified. For the interface between Al5Fe2 and Mg, an orientation relationship of ( 6 2 &#xAF; 2 ) A l 5 F e 2 / / ( 3 1 &#xAF; 1 &#xAF; 2 &#xAF; ) M g and [ 1 5 &#xAF; 8 &#xAF; ] A l 5 F e 2 / / [ 2 4 &#xAF; 23 ] M g was observed. The tensile–shear load of the ZK60–steel joint could reach 4.6 kN. Moreover, the joint fracture occurred at the interface between the Al5Fe2 layer and the Mg alloy substrate, suggesting the brittle fracture characteristic.

36 MATERIALS SCIENCE↗

A Prospective, Open-Label, Multicenter Phase 2 Trial of Neoadjuvant Therapy Using Full-Dose Gemcitabine and S-1 Concurrent with Radiation for Resectable Pancreatic Ductal Adenocarcinoma

Background: Neoadjuvant therapy reportedly shows only marginal clinical benefit in pancreatic ductal adenocarcinoma (PDAC), especially in resectable cases. However, with more effective regimens, neoadjuvant therapy may become a standard of care for resectable cases. A prospective, open-label, multicenter phases 1 and 2 trial of neoadjuvant therapy was conducted using full-dose gemcitabine and S-1 concurrently with 50.4 Gy of radiation therapy (GSRT) for resectable PDAC. This report describes the phase 2 results. Methods: The phase 2 part of this study enrolled 57 patients with cytologically or histologically proven PDAC deemed resectable based on imaging before neoadjuvant therapy. These patients received GSRT. After reevaluation by computed tomography scan, surgical exploration was performed, followed by adjuvant therapy. According to the prescribed protocol of the clinical trial, statistical analyses included 57 phase 2 patients and 6 phase 1 patients who received the same dosage as in phase 2. Results: This trial enrolled 63 patients (42 men and 21 women) with a median age of 70 years. Leukopenia or neutropenia of grade 3 or higher occurred for 79% of the patients, but no other severe adverse events were observed. Among the 63 patients, 54 underwent surgical resection. Intention-to-treat analysis of the 63 patients showed an excellent median survival time lasting as long as 55.3 months. The patients who completed neoadjuvant therapy, surgery, and adjuvant therapy had a 5-year survival rate of 56.6%. Conclusions: This regimen showed outstanding clinical efficacy with acceptable tolerability for patients with resectable PDAC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Experimental design for the Marine Ice Sheet–Ocean Model Intercomparison Project – phase 2 (MISOMIP2)

The Marine Ice Sheet–Ocean Model Intercomparison Project – phase 2 (MISOMIP2) is a natural progression of previous and ongoing model intercomparison exercises that have focused on the simulation of ice-sheet and ocean processes in Antarctica. The previous exercises motivate the move towards realistic configurations, as well as more diverse model parameters and resolutions. The main objective of MISOMIP2 is to investigate the performance of existing ocean and coupled ice-sheet–ocean models in a range of Antarctic environments through comparisons to observational data. We will assess the status of ice-sheet–ocean modelling as a community and identify common characteristics of models that are best able to capture observed features. As models are highly tuned based on present-day data, we will also compare their sensitivity to prescribed abrupt atmospheric perturbations leading to either very warm or slightly warmer ocean conditions compared to the present day. The approach of MISOMIP2 is to welcome contributions of models as they are, including global and regional configurations, but we request standardized variables and common grids for the outputs. We target the analysis at two specific regions, the Amundsen Sea and the Weddell Sea, since they describe two different ocean environments and have been relatively well observed compared to other areas of Antarctica. An observational “MIPkit” synthesizing existing ocean and ice-sheet observations for a common period is provided to evaluate ocean and ice-sheet models in these two regions.

58 GEOSCIENCES↗

Synthesis of a Novel Energetic Heterocyclic Oxidizer with Higher Energy and Lower Sensitivity (Phase 2) Final Report CRADA No. TC02125.0

This project was a continuation of work originally performed under a Phase 1 of the Small Business Technology Transfer (STIR). The success of the Phase 1 led to the award of a Phase 2 of the STIR. In Phase 1 of the STIR, the target energetic compound, 3,4-bis(4-nitro-l,2,5- oxadiazol-3yl)-1,2,5-oxadiazole-l-oxide (DNTF), was synthesized at the 5g scale and small-scale safety tests were performed. DNTF showed promising performance· and safety properties. DNTF was shown to be relatively insensitive while performing better than the current industry standard, H1vIX, in solid propellant formulations. Because of the successful research and development project involving PSI, LLNL and Aerojet in Phase I of the STIR, the sponsors wanted to obtain larger quantities of DNTF for further testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Phase 2 Trial of Concurrent Chemotherapy and Proton Therapy for Stage III Non-Small Cell Lung Cancer: Results and Reflections Following Early Closure of a Single-Institution Study

Purpose: Proton therapy has been shown to reduce radiation dose to organs at risk (OAR) and could be used to safely escalate the radiation dose. We analyzed outcomes in a group of phase 2 study patients treated with dose-escalated proton therapy with concurrent chemotherapy for stage 3 non-small cell lung cancer (NSCLC). Methods and Materials: From 2009 through 2013, LU02, a phase 2 trial of proton therapy delivering 74 to 80 Gy at 2 Gy/fraction with concurrent chemotherapy for stage 3 NSCLC, was opened to accrual at our institution. Due to slow accrual and competing trials, the study was closed after just 14 patients (stage IIIA, 9 patients; stage IIIB, 5 patients) were accrued over 4 years. During that same time period, 55 additional stage III patients were treated with high-dose proton therapy, including 7 in multi-institutional proton clinical trials, 4 not enrolled due to physician preference, and 44 who were ineligible based on strict entry criteria. An unknown number of patients were ineligible for enrollment due to insurance coverage issues and thus were treated with photon radiation. Median follow-up of surviving patients was 52 months. Results: Two-year overall survival and progression-free survival rates were 57% and 25%, respectively. Median lengths of overall survival and progression-free survival were 33 months and 14 months, respectively. There were no acute grade 3 toxicities related to proton therapy. Late grade 3 gastrointestinal toxicity and pulmonary toxicity each occurred in 1 patient. Conclusions: Dose-escalated proton therapy with concurrent chemotherapy was well tolerated with encouraging results among a small cohort of patients. Unfortunately, single-institution proton studies may be difficult to accrue and consideration for pragmatic and/or multicenter trial design should be considered when developing future proton clinical trials.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The Western Wind and Solar Integration Study Phase 2

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West(GE Energy 2010).

14 SOLAR ENERGY↗

The Western Wind and Solar Integration Study Phase 2 (Executive Summary)

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West(GE Energy 2010).

14 SOLAR ENERGY↗

Geothermal Play-Fairway Analysis of Washington State Prospects: Phase 2 Results

An investment of $0.7M from the Geothermal Technology Office for Phase 2 of Play Fairway Analysis in Washington State improved existing favorability models and increased model confidence. The new 1:24,000-scale geological mapping, 15 detailed geophysical surveys, 2 passive seismic surveys, and geochronology collected during this phase are coupled with updated and detailed structural modeling and have significantly improved the conceptual models of three potential blind geothermal systems/plays in Washington State: the St. Helens Shear Zone, Mount Baker, and Wind River Valley. Results of this analysis reveal the presence of commercially viable undiscovered geothermal resources in all three study areas. The analysis additionally provides a clear definition of the geothermal prospects in terms of the essential elements of a functioning geothermal system, the confidence in these assessments, and associated potential and risk of development. As a result, several groups have recently approached our organization about opportunities for large-capital moderate- to high-temperature geothermal development and are very interested in the results of Phase 3 drilling. Here, our updated models, coupled with development interest, provides a compelling basis for investment in future validation activities.

exploration risk↗

A Phase 2 Open Label, Single-Arm Trial to Evaluate the Combination of Cetuximab Plus Taxotere, Cisplatin, and 5-Flurouracil as an Induction Regimen in Patients With Unresectable Squamous Cell Carcinoma of the Head and Neck

Purpose: Despite treatment, prognosis of unresectable squamous cell carcinoma of the head and neck (SCCHC) is dismal. Cetuximab therapy has proven to increase the clinical activity of radiation therapy and chemotherapy in patients with locoregional advanced disease with an acceptable toxicity profile. We designed a phase 2 trial to evaluate the efficacy of docetaxel, cisplatin, and 5-fluorouracil (TPF) plus cetuximab (C-TPF) as an induction regimen in patients with unresectable SCCHN. Methods and Materials: A single-arm phase 2 trial was conducted. Eligible patients included those with untreated unresectable SCCHC, World Health Organization performance status of 0 to 1, 18 to 70 years of age. Treatment consisted of four 21-day cycles of TPF (docetaxel, 75 mg/m{sup 2} day 1; cisplatin, 75 mg/m{sup 2} day 1; 5-fluorouracil [5-FU], 750 mg/m{sup 2} day 1-5) and cetuximab, 250 mg/m{sup 2} weekly (loading dose of 400 mg/m{sup 2}). Prophylactic granulocyte colony-stimulating factor and antibiotic support were given. After induction, sequential accelerated radiation therapy with concomitant boost (69.9 Gy) and weekly cetuximab therapy were delivered in the absence of disease progression. The primary endpoint was objective response rate (ORR) to C-TPF. Results: Fifty patients were enrolled across 8 centers. Median age was 54 years; disease was stage IV; oropharynx and hypopharynx were the most common primary sites. Eighty-two percent received 4 cycles of C-TPF, and 86% started sequential treatment based on radiation therapy and cetuximab. ORR after C-TPF was 86% (95% confidence interval [CI]: 73%-94%) and 24% had complete response (CR). With a median follow-up of 40.7 months, median overall survival (OS) was 40.7 months. The 2-year actuarial locoregional control (LRC) rate was 57%. The most common drug-related grade 3 or 4 toxicities during induction were neutropenia (24%), neutropenic fever (24%), and diarrhea (20%). There were 3 treatment-related deaths (6%). Conclusions: C-TPF yields high ORR and CR as induction treatment in unresectable SCCHN. However, hematologic toxicity is too high to recommend this regimen at the current dose.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

FACE-MDS Phase 2: Data from Six US-Located Elevated CO2 Experiments

This dataset contains measured ecosystem data from four Free Air CO2 Enrichment (FACE) experiments–Duke, Oak Ridge (ORNL), and Rhinelander -- and one Open Top Chamber (OTC) experiment -- Kennedy Space Center (KSCO). The sites were located in the United States and contain data from 1996-2009. These sites were the study sites of the FACE Model Data Synthesis (FACE-MDS) project phase 2. The file naming convention can be found in the file 'facemds-file-table-sitedata.xml' and information about variable naming convention can be found in the file 'facemds-standard-name-table-modvars.xml'. We followed the ALMA v3 convention for meteorological variables and developed a hierarchical naming scheme for ecosystem variables. Additional info can be found in the protocols in the accompanying meteorological dataset (Walker et al. 2018: doi:10.15485/1480328). We replaced the original naming convention mentioned in the protocol with the one described in 'facemds-standard-name-table-modvars.xml'. The outputs of the FACE-MDS phase 2 are in Walker et al (2018: doi:10.15485/1480327). The dataset contains 18 data files that are available in comma-separate (*.csv), and 18 R Data Serialization (*.rds) format. 2 XML (*.xml) companion files and additional metadata are provided: 2 data dictionaries and a file-level metadata file in comma-separate (.csv) format and a user guide in PDF (*.pdf) format. This dataset was updated on 2019-06-28 to fix daily files at Duke and ORNL were incorrectly labelled and were standard error files instead of plot level data. Now corrected and all three (plot, mean, standard error) daily data files for both sites have been added. This dataset was updated on 2026-06-08 to add a user guide, data dictionary file, and a file-level metadata file. DUKE_ax_v2.csv was added to match the no data value format of other files in this dataset. DUKE_ax.csv is maintained as a data file. No previously released data values were changed.

54 ENVIRONMENTAL SCIENCES↗

The Wide-area Energy Management System Phase 2 Final Report

The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resulting system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.

25 ENERGY STORAGE↗

Induced ferromagnetism in Mn{sub 3}N{sub 2} phase embedded in Mn/Si{sub 3}N{sub 4} multilayers

Room temperature ferromagnetism has been obtained for different sets of Mn/Si{sub 3}N{sub 4} multilayers prepared by sputtering. In order to find the most suitable conditions to stabilize the ferromagnetic ordering in this system, the evolution of the magnetic properties has been studied for films in which the Si{sub 3}N{sub 4} layer thickness was maintained constant while that of the Mn layer was varied, [Mn(t{sub m})/Si{sub 3}N{sub 4}(3.4 nm)]{sub n}, and conversely, in [Mn(0.7 nm)/Si{sub 3}N{sub 4}(t{sub sn})]{sub 43} samples, in which the Mn layer thickness was kept constant while varying the Si{sub 3}N{sub 4} layer thickness. Structural, compositional, electronic and magnetic characterizations have been performed by means of x-ray reflectometry, Rutherford backscattering spectrometry, x-ray photoemission spectroscopy, x-ray absorption, and superconducting quantum interference device for further knowledge of the magnetic-structural relationship in this system. Our results show that the peculiar magnetic behavior of these films is mainly related to the stabilization of a slightly distorted Mn{sub 3}N{sub 2} phase that is induced by the Si{sub 3}N{sub 4} at the interfaces. For samples with larger Mn layer thickness, metallic Mn and Mn{sub 3}N{sub 2} phases coexist, which leads to a reduction of the total magnetization per Mn atom due to the presence of metallic Mn. For small Mn layer thickness (t{sub m}<0.86 nm), where noncontinuous Mn{sub 3}N{sub 2} layers are formed, the magnetization decreases noticeably due to the superparamagnetic size limit. It has been found that the best conditions for the stabilization of the ferromagnetism in this system occur when both, the manganese-rich and the silicon nitride layers, are continuous and with similar thickness, close to 3.5 nm.

36 MATERIALS SCIENCE↗

Enhanced Hanford Low-Activity Waste Glass Property Data Development: Phase 2

The U.S. Department of Energy’s (DOE) Office of River Protection (ORP) requested Pacific Northwest National Laboratory (PNNL) to provide expert evaluation and experimental work in support of the River Protection Project vitrification technology development (DOE 2012). This work was performed under the PNNL project titled “ORP Glass Support Work.” One task of this project—Enhanced Hanford Waste Glass Models—is the subject of this report. The long-term objective of this work is to expand the Hanford site low-activity waste (LAW) glass database and property composition models to cover the balance of the Hanford site tank waste treatment and immobilization mission. This report presents the glass compositions and glass property data developed in Phase 2 of the enhanced Hanford LAW glass property data development effort. When the data development effort for enhanced Hanford LAW glasses is complete, enhanced LAW glass property models will be developed. Section 1.1 summarizes the status of the LAW glass composition regions and waste loading constraints prior to the data development effort documented in this report. Section 1.2 summarizes the LAW Phase 2 glass composition region and test matrix. Section 1.3 documents the quality assurance program used in performing the work discussed in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Hanford Low-Activity Waste Glass Property Data Development: Phase 2

The U.S. Department of Energy’s (DOE) Office of River Protection (ORP) requested Pacific Northwest National Laboratory (PNNL) to support the River Protection Project vitrification in an effort to support operations upon completion of startup activities (DOE 2012). This work was performed under the PNNL project titled “ORP Glass Support Work.” One task of this project—Enhanced Hanford Waste Glass Models—is the subject of this report. A previous task focused on generating property-composition data and models for the Hanford site low-activity waste (LAW) glasses with lower waste loadings, which are relevant to the commissioning of the LAW vitrification facility. The current task has the long-term objective of expanding the Hanford site LAW glass database and property composition models for the balance of the Hanford site tank waste treatment and immobilization mission. During the balance of the mission, LAW glasses with higher waste loadings will be produced. This report presents the glass compositions and glass property data developed in Phase 2 of the enhanced Hanford LAW glass property data development effort. When this effort is complete, enhanced LAW glass property models will be developed. Section 1.1 summarizes the status of the LAW glass composition regions and waste loading constraints prior to the data development effort documented in this report. Section 1.2 summarizes the LAW Phase 2 glass composition region and test matrix. Section 1.3 documents the quality assurance program used in performing the work discussed in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗