(Project 18-15531) Repair and Mitigation of Chloride-Induced Pitting and Chloride-Induced Stress Corrosion Cracking in Used Spent Nuclear Fuel Dry Cask Canister Materials (Final Technical Report)

Several experimental techniques were utilized to understand the corrosion and SCC performance of possible techniques for repairing cracks and pits in SS304 utilized for dry cask storage of spent nuclear fuel. The repairs examined included cold spray, FSW, soldering, and VFAW. The corrosion and SCC assessment techniques utilized for comparing repairs against the base material were 4-pt bending SCC testing in boiling MgCl 2 at stress levels between 0 MPa and 350 MPa, immersion testing in 40% RH brine solution meant to mimic a service-like environment, SSRT SCC testing in 40% RH brine solution. For FSW alone, scanning electrochemical cell microscopy and microelectrochemical syringe cell were utilized to understand the corrosion performance across the weld, in the retreating/advancing sides, and base material. Based on the results of this study, the FSW and cold spray repair techniques proved most viable for SCC repair in SS304 dry cask storage applications and continuing research is highly recommended to understand and quantify in further detail their SCC performance compared to unrepaired SS304. Additionally, solder and VFAW (patch or incline) would not be recommended based on the corrosion and SCC findings in this study.

42 ENGINEERING↗

Pinch Heat Integration Tool (PIT) v0.9

The pinch heat integration tool (PIT) is a multi-module tool designed for identifying and analyzing thermal energy integration at facilities. It generates pinch and grand composite curves to identify optimal streams for heat exchange and industrial heat pumps. Users input heating and cooling stream data via an Excel sheet. The tool comprises four modules: 1. 'Main Pinch' for creating a pinch diagram using user-provided data. 2. 'GCC' for generating a grand composite curve to identify utility optimization opportunities. 3. 'Heat Exchanger' for analyzing stream combinations for heat exchange. 4. 'Heat Pump' for evaluating streams as sources and sinks for heat pumps and calculating the heat pump's coefficient of performance based on the selected refrigerant.

Karki, Unique [Lawrence Berkeley National Laborato↗

Hicks Pries, Sulman, et al 2018. In situ incubation of 13C-labeled litter in three soil pits at Blodgett Forest, CA from 2013 to 2016

Even though over half of the world's soil organic carbon (SOC) is stored in subsoils (>20 cm deep), and the old ages of subsoil OC indicate its cycling differs from surface SOC, there are few studies examining in situ decomposition processes in deep soils. The purpose of this dataset is to elucidate these processes. In this study we added 13C-labeled fine roots to 15, 55, and 95 cm depths of a well-characterized coniferous forest Alfisol and monitored the amount of root-derived C remaining over 6, 12, and 30 months. We recovered the root-derived C in microbial phospholipid fatty acids (PLFAs) after 6 months and in coarse (>2 mm) particulate, fine (<2 mm) particulate, and dense, mineral-associated pools after 6, 12, and 30 months. Overall, root decomposition in the first 6 months was similar among all depths but significantly diverged at 30 months with faster decomposition at 15 cm than at 95 cm. There were more fungal and Gram negative-associated PLFAs at 15 cm than at 95 cm, and 13C analysis revealed those microbial groups preferred the added root carbon to native SOC. Mineral-associations were not the cause of slower decomposition at depth because similar amounts of applied root C was recovered in the dense fraction at all depths. The largest difference among depths was in the amount of root C recovered in the coarse particulate fraction, which was greater at 95 cm (50%) than at 15 cm (15%). Slower decomposition of the particulate pool at depth likely contributed to the increase in C:N ratios and depletion of δ13C values below 60 cm depth in our soil profiles. Simulations of these soils using the CORPSE model, which incorporates microbial priming effects and mineral stabilization of SOC, reproduced patterns of particulate and mineral-associated SOC over both time and depth and suggested that a lack of priming by root exudates at depth could account for the slower decomposition rate of particulate root material. Decomposition of deep particulate SOC may increase if root exudation or dissolved OC transport to depth increases.This dataset includes (1) characterization of the soil pits prior to litter addition, (2) characterization of how the litter changed after 6, 12, and 30 months, and (3) the CORPSE model structure, parameterization, and output.

54 ENVIRONMENTAL SCIENCES↗

Your Role as a Program Manager in Pit Production Mission Integration (PPMI-DO)

PPMI is responsible for integrating the planning, execution, and reporting for LANL’s Pit Manufacturing efforts, surplus plutonium disposition activities, the Material Recycle and Recovery (MR&R) program, and other programs of national significance. Our programmatic sponsors rely on PPMI to capitalize on the unique capabilities and expertise in PF-4 (the only Security Cat I/Haz Cat II Pu processing facility in the Nation) and other vital facilities across the laboratory to deliver on mission critical products in support of National Security.

42 ENGINEERING↗

Characterization of Infrequent Samples from the Concentration, Storage, and Transfer Facility: F-Area Pump Pit 3 (FPP-3) Sump Sample: December 2021 Sample

In December 2021, SRR-E sent an ~185 mL sample identified as FPP-3 from a F-Area pump pit sump to SRNL for analysis. The sample was pale yellow in color and contained a small amount of suspended solids visually estimated to be less than 1% by volume. SRNL analysis indicated that the sample contained 4.4 E+05 dpm/mL Cs-137, 6.2 E+05 dpm/mL total beta activity, 9.3 E+02 dpm/mL beta activity following cesium removal, and below detectable levels of alpha activity following cesium removal. In addition, the sample contained 0.015 M free OH- and 947 μg total organic carbon/mL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USHPRR MP-1 Irradiation Test: Assessment of Edge Pitting and Bond Line Corrosion in Vendor Produced Fuel Plates

This report summarizes an effort to identify the source of anomalous localized edge pitting and bond line corrosive attack of experimental mini fuel plates manufactured at the commercial fuel vendor BWXT and tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) as part of the Miniplate 1 (MP-1) irradiation test. The MP-1 test was conducted by the US High Performance Research Reactor Project (USHPRR) and overseen by the Fuel Qualification Pillar (FQ). The test involved evaluation of a mix of 62 “vendor” fuel plates fabricated at BWXT and 12 “laboratory” fuel plates fabricated at Idaho National Laboratory using commercial-scale and labscale fabrication processes respectively. The MP-1 test was the first in a series of tests to generate data to support qualification of a new plate-type low-enriched uranium (LEU) U-10Mo monolithic fuel system. The major objective of the MP-1 experiment was to test, for the first time, miniplates fabricated by a commercial fuel vendor over the range of irradiation conditions relevant to conversion of NRC regulated High Performance Research Reactors (HPRRs) from high-enriched uranium to LEU. The focus of the efforts described in this report are the vendor fuel plates to inform changes in the fabrication process prior to fabrication of the next miniplate experiment MP2.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Innovative fix at LANL keeps pit production milestones in sight

Los Alamos National Laboratory (LANL) is well on the path to the W87-1 plutonium pit first production unit. When a piece of equipment in the Plutonium Facility (PF-4) went down in May, teams across the Laboratory who support work in PF-4 rallied to develop an innovative fix.

42 ENGINEERING↗